Construction Management Plan
53. A Construction Management Plan addressing all construction phases shall be prepared
by a suitably qualified person and submitted to Council for approval prior to obtaining a
Development Permit for Operational Works. The plan should aim to address every
foreseeable problem eg: movements of excavation and construction machinery, building
material deliveries, stockpiling of materials etc that is likely to occur during the
construction process and include recommendation on how these can be overcome or
minimised.
54. A Traffic Management Plan for the construction phases of the development shall be
submitted to and approved by Council prior to the issue of any Development Permits for
Operational Works. The Traffic Management Plan shall include but not be limited to:
54.1. Indicate provision for on-site parking for the required workforce;
54.2. Indicate the location of any “holding” areas for heavy vehicles;
54.3. Operating hours; and
54.4. Haulage Routes.
Roof Water & Stormwater Drainage
55. Roof runoff from any new building shall be directed to a rainwater storage system or
2
tank (minimum storage the greater of 5000 litres or 15 litres/m of roof area) that is
installed to ensure water from the tank is used for external uses (such as watering
gardens, irrigation, ornamental ponds, water features, outdoor cleaning, etc) and for use
in flushing of toilets internal to the building. All rainwater tanks are to be designed and
installed in accordance with the Queensland Development Code (QDC), Part 25 –
Rainwater Tanks, and shall be part of the plumbing application in conjunction with the
building approval. The location and capacity of the tanks shall be clearly shown on the
plans submitted for Building Works / Operational Works approval and any overflow shall
be directed to the stormwater drainage system.
56. All stormwater drainage (including roof water overflow from the rainwater storage
system) shall be collected and discharged so there is no net increase in stormwater
runoff from the site. Stormwater drainage permitted to drain from the site shall be
discharged to the adjoining open space area. Plans of the drainage design shall be
prepared by a Registered Professional Civil Engineer and submitted to Council prior to
obtaining a Development Permit for Operational Works. The drainage design shall be in
accordance with Council’s Planning Scheme Policy PSP5 – Engineering Design
Standards – Roads, Drainage and Earthworks and QUDM. All components (pits, pipes,
tanks, basins, scour protection etc) of the stormwater drainage system shall be wholly
contained within the boundaries of the subject site.
57. As the surface levels of the site are to be altered, appropriate stormwater drainage
pipes shall be installed within the site to collect and discharge stormwater runoff from all
adjoining properties to prevent additional ponding/flooding on these properties.
58. To ensure that polluted run-off does not enter Council’s stormwater drainage system,
stormwater run-off from the common driveway and carparking areas shall have the first
flush (the first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross
pollutant trap provided on site prior to being permitted to discharge into Council’s
drainage system.
All other clean stormwater, such as roof water, can be collected on site and discharged
through a single underground drain line directly into the existing drainage system,
bypassing the grease/oil arrestor/gross pollutant trap.
Page 8 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - 010.2007.00001841.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 94 KB (small file)
- File type
No other editions are linked here.