                                          -8-



Construction Management Plan
53.   A Construction Management Plan addressing all construction phases shall be prepared
      by a suitably qualified person and submitted to Council for approval prior to obtaining a
      Development Permit for Operational Works. The plan should aim to address every
      foreseeable problem eg: movements of excavation and construction machinery, building
      material deliveries, stockpiling of materials etc that is likely to occur during the
      construction process and include recommendation on how these can be overcome or
      minimised.
54.   A Traffic Management Plan for the construction phases of the development shall be
      submitted to and approved by Council prior to the issue of any Development Permits for
      Operational Works. The Traffic Management Plan shall include but not be limited to:
      54.1.   Indicate provision for on-site parking for the required workforce;
      54.2.   Indicate the location of any “holding” areas for heavy vehicles;
      54.3.   Operating hours; and
      54.4.   Haulage Routes.
Roof Water & Stormwater Drainage
55.   Roof runoff from any new building shall be directed to a rainwater storage system or
                                                                            2
      tank (minimum storage the greater of 5000 litres or 15 litres/m of roof area) that is
      installed to ensure water from the tank is used for external uses (such as watering
      gardens, irrigation, ornamental ponds, water features, outdoor cleaning, etc) and for use
      in flushing of toilets internal to the building. All rainwater tanks are to be designed and
      installed in accordance with the Queensland Development Code (QDC), Part 25 –
      Rainwater Tanks, and shall be part of the plumbing application in conjunction with the
      building approval. The location and capacity of the tanks shall be clearly shown on the
      plans submitted for Building Works / Operational Works approval and any overflow shall
      be directed to the stormwater drainage system.
56.   All stormwater drainage (including roof water overflow from the rainwater storage
      system) shall be collected and discharged so there is no net increase in stormwater
      runoff from the site. Stormwater drainage permitted to drain from the site shall be
      discharged to the adjoining open space area. Plans of the drainage design shall be
      prepared by a Registered Professional Civil Engineer and submitted to Council prior to
      obtaining a Development Permit for Operational Works. The drainage design shall be in
      accordance with Council’s Planning Scheme Policy PSP5 – Engineering Design
      Standards – Roads, Drainage and Earthworks and QUDM. All components (pits, pipes,
      tanks, basins, scour protection etc) of the stormwater drainage system shall be wholly
      contained within the boundaries of the subject site.
57.   As the surface levels of the site are to be altered, appropriate stormwater drainage
      pipes shall be installed within the site to collect and discharge stormwater runoff from all
      adjoining properties to prevent additional ponding/flooding on these properties.
58.   To ensure that polluted run-off does not enter Council’s stormwater drainage system,
      stormwater run-off from the common driveway and carparking areas shall have the first
      flush (the first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross
      pollutant trap provided on site prior to being permitted to discharge into Council’s
      drainage system.
      All other clean stormwater, such as roof water, can be collected on site and discharged
      through a single underground drain line directly into the existing drainage system,
      bypassing the grease/oil arrestor/gross pollutant trap.



                                                                                       Page 8 of 20

Used in these records

About this file

File size
94 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Decision Notice - 010.2007.00001841.001 [As Published].pdf · 94 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.