SUPERSEDED Decision Notice - 010.2007.00001841.001 [As Published] · 132007.1841
-9-
To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
arrestors/gross pollutant trap, which shall be submitted to the Council for approval prior
to obtaining a Development Permit for Operational Works.
The approved maintenance plan shall be incorporated in the ongoing maintenance
scheme for the development and a copy of this shall be provided for Council’s records
prior to commencement of the approved Use.
A Development Permit for Building Works shall not be granted until a Development
Permit for Operational Works has been issued in regard to the drainage scheme.
59. The applicant shall revise the Stormwater Management Plan Parts A & B prepared by
Barlow Gregg VDM reference M3048 dated December 2007 to use rainfall data for the
subject site’s locality, Noosaville, and to detail a stormwater treatment train that can
achieve the Water Quality Objectives for the site. This revised stormwater treatment
train for the site shall ensure that nutrients can be adequately treated prior to release
into the open space conservation areas. All stormwater runoff treatment must be
undertaken within the development areas of the site. Water quality objectives for the site
are as follows:
59.1. Suspended Solids < 15/50mg/L (median)
59.2. Total Nitrogen < 0.5mg/L (median)
59.3. Total Phosphorous < 0.05mg/L (median)
59.4. pH between 5.0 to 7.0
59.5. Turbidity < 30 NTU
59.6. Salinity < 1500µS/cm
The revised stormwater management plan shall also detail the design, construction and
operational phases of the development required to ensure the stormwater system does
not cause adverse impacts to the downstream open space areas. The applicant shall
submit an amended plan for Council approval in conjunction with or prior to a
Development Permit for Operational Works being issued.
60. The applicant shall submit to Council a report prepared by a suitably qualified ecologist
that assesses the impacts of the revised Stormwater Management Plans on the
downstream ecologically sensitive areas. The report shall be submitted in conjunction
with or prior to a Development Permit for Operational Works being issued.
61. All site stormwater drainage shall be by means of a gravity system. No mechanical
features are to be used to dispose of stormwater.
Sewer Mains
62. The site shall be connected to Council’s existing sewerage reticulation systems via a
gravity system and shall be constructed in accordance with Council’s standards and
requirements at no cost to Council.
63. The existing and proposed sewer mains located within the site and the ‘zone of
influence’ (taken as the area within a 45-degree angle measured from the invert of the
sewer main to the finished surface level) shall be accurately located and determined by
a licensed Surveyor and shown on all plans submitted for Operational Works approval.
To ensure Council’s sewer main is accessible for maintenance purposes and is
protected from risk of damage no structures requiring a building permit (eg. buildings,
retaining walls exceeding 1m in height, raised terraces, etc) shall be constructed within
this ‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever is
the greater. As such the applicant shall amend Operational Works plans including
Building plans to ensure compliance.
Page 9 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - 010.2007.00001841.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 94 KB (small file)
- File type
No other editions are linked here.