Council archive · source document
Further Advice Response 17-07-25 22BRT0122_LT01_3 · OPW25/0042
Figure 3-2: Noosa Drive / Coral Tree Avenue SIDRA Layout
3.2.1 Analysis Results
The results of the SIDRA analysis for the 2022 Existing, 2025 Base and 2025 Base + Earthworks scenarios
(both weekdays and weekend) are summarised in Table 3-2. Detailed SIDRA output data is also included in
Attachment C – SIDRA Outputs.
Table 3-2: Summary of Sidra Outputs (Noosa Drive and Coral Tree Avenue Roundabout)
Scenario DoS Average Delay LoS 95th Percentile Critical Queue (m)
Overall Worst Movement Overall Worst Noosa Coral Tree Noosa
Movement Drive (E) Ave (N) Dr (W)
Weekday - AM Peak Hour
2022 Survey 32% 5 sec 14 sec (UT Noosa Dr W) A B 18 m 2m 18 m
2025 Base 33% 5 sec 14 sec (UT Noosa Dr W) A B 19 m 2m 18 m
2025 Base + 34% 5 sec 14 sec (UT Noosa Dr W) A B 20 m 2m 19 m
Earthworks
Weekday - PM Peak Hour
2022 Survey 42% 5 sec 12 sec (UT Noosa Dr W) A B 29 m 1m 18 m
2025 Base 43% 5 sec 12 sec (UT Noosa Dr W) A B 31 m 1m 19 m
2025 Base + 44% 5 sec 12 sec (UT Noosa Dr W) A B 32 m 1m 19 m
Earthworks
Weekend – PM Peak
2022 Survey 40% 5 sec 12 sec (RT Coral Tree Ave N) A B 22 m 1m 23 m
2025 Base 41% 5 sec 13 sec (RT Coral Tree Ave N) A B 24 m 1m 24 m
2025 Base + 42% 5 sec 13 sec (RT Coral Tree Ave N) A B 24 m 1m 25 m
Earthworks
RT – Right Turn Movement, Th – Through Movement, LT – Left Turn Movement, UT – U Turn Movement; N – North, S – South, E –
East, W – West
Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Further Advice Response 17-07-25 22BRT0122_LT01_3.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.