Council archive · source document
Further Advice Response 17-07-25 22BRT0122_LT01_3 · OPW25/0042
However, during Bulk Earthworks this access will not be in place and haulage vehicles will gain access to the subject site at three (3) proposed temporary access locations as highlighted in Figure 3-4 from Avada Traffic’s Traffic Management Plan (TMP). All haulage traffic will be turning between the Grant Street eastern and Banksia Avenue northern approaches - intersection will remain as per the existing arrangement. Figure 3-4: Earthworks Access Points Source: Avada Traffic TMP The SIDRA layout for the Grant Street / Banksia Avenue roundabout intersection is shown in Figure 3-5. Figure 3-5: Grant Street / Banksia Avenue SIDRA Layout Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex Reference: 22BRT0122
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Further Advice Response 17-07-25 22BRT0122_LT01_3.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.