Council archive · source document
Further Advice Response 17-07-25 22BRT0122_LT01_3 · OPW25/0042
3.3.1 Analysis Results
The results of the SIDRA analysis for the 2022 Existing, 2025 Base and 2025 Base + Development scenarios
(both weekdays and weekend) are summarised in Table 3-3 overleaf. Detailed SIDRA output data is also
included in Attachment C – SIDRA Outputs.
Table 3-3: Summary of SIDRA Outputs (Grant Street / Noosa Drive / Sunshine Beach Road Roundabout)
Scenario DoS Average Delay LoS 95th Percentile Critical Queue (m)
Overall Worst Movement Overall Worst Sunshine Noosa Grant Noosa
Movement Beach Dr (E) St (N) Dr
Rd (S) (W)
Weekday - AM Peak Hour
2022 Survey 30% 9 sec 18 sec (RT Grant St N) A B 16 m 12 m 6m 12 m
2025 Base 32% 9 sec 19 sec (UT Grant St N) A B 17 m 12 m 6m 13 m
2025 Base + 32% 9 sec 19 sec (UT Grant St N) A B 17 m 12 m 7m 13 m
Earthworks
Weekday - PM Peak Hour
2022 Survey 40% 9 sec 20 sec (UT Grant St N) A B 20 m 24 m 6m 16 m
2025 Base 42% 9 sec 21 sec (UT Grant St N) A B 21 m 25 m 6m 16 m
2025 Base + 43% 9 sec 21 sec (UT Grant St N) A B 22 m 26 m 7m 16 m
Earthworks
Weekend – PM Peak
2022 Survey 32% 8 sec 19 sec (UT Grant St N) A B 17 m 17 m 3m 14 m
2025 Base 33% 8 sec 20 sec (UT Grant St N) A B 18 m 18 m 3m 15 m
2025 Base + 33% 8 sec 20 sec (UT Grant St N) A B 18 m 18 m 3m 15 m
Earthworks
RT – Right Turn Movement, Th – Through Movement, LT – Left Turn Movement, UT – U Turn Movement; N – North, S – South, E –
East, W - West
The analysis indicates that the roundabout is expected to operate at suitable levels at the 2025 assessment
year, with Earthworks traffic included, with a worst-case DoS 43% (less than 85% - practical capacity limit of
roundabout) and an overall LoS A. The addition of the Earthworks traffic has no notable impact to key
operational metrics, with minor change to average intersection delay and at most an increase in queuing of
1 m (less than one vehicle length - approx. 6.0m).
Based on this assessment, the proposed Bulk Earthworks traffic generation is considered to have negligible
impact on the operations of the Grant Street / Noosa Drive / Sunshine Beach Road roundabout intersection.
Analysis of Grant Street / Banksia Avenue
Ultimately, access to the subject development will be achieved with the addition of a fourth (western) leg to
the existing Grant Street / Banksia Avenue roundabout intersection.
Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Further Advice Response 17-07-25 22BRT0122_LT01_3.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.