Council archive · source document
Further Advice Response 17-07-25 22BRT0122_LT01_3 · OPW25/0042
Weyba Road / Reef Street
o Thursday, 27th October 2022
AM Peak period: 7.45am to 8.45am
PM Peak Period 3.00pm to 4.00pm
o Saturday, 29th October 2022
AM/ PM Peak period: 11.30am to 12.30pm
Detailed surveyed traffic volumes observed during the weekday / weekend AM and PM peak-hour periods
are attached in Attachment A – Survey Data.
Development Traffic Demand
The Bulk Earthworks traffic generation is anticipated to be 150 trucks per day, which would have a maximum
of ten (10) vehicles per hour (vph), occurring within the weekday (AM / PM) or weekend peaks.
1.2.1 Traffic Distribution
The distribution of Bulk Earthworks traffic within the surrounding network is based on the proposed route
outlined in the Avada Traffic – Traffic Management Plan and illustrated in Figure 1-1 - see also Attachment B.
Figure 1-1: Traffic Distribution
Based on the above distribution and generation outlined above the traffic generated by the Bulk Earthworks
traffic in the respective peak hour periods is shown in Figure 1-2 - - see also Attachment B.
Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Further Advice Response 17-07-25 22BRT0122_LT01_3.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.