Skip to the record
Search everything, all in one place.

Council archive · source document

Attachment 2 - Construction and Tree Management Plan · OPW25/0206

of 40

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
              Site Access for vehicles – a Traffic Management Plan will be established by the contractor and project
               team to coordinate the delivery processes for materials as well as the daily operational workings of the
               site, including sub-contractor parking either on or off the site, with a shuttle bus service being provided
               where necessary.
              Waste Management Practices: Waste management facilities will be conveniently located away from
               sensitive vegetation and watercourses. A regular schedule for waste collection and disposal will be
               implemented to avoid accumulation, with recycling encouraged to reduce landfill waste. Clearly marked
               waste storage areas will facilitate effective waste segregation. These will be located to the north of the
               carpark closest to the main road entry for easy access.
              Ablution Facilities: In addition to the main site set-up and the semi-permanent ablution facilities located
               there, Mobile/Temporary ablution facilities will be strategically placed within the footprint of Cabins 12 &13,
               ensuring easy access for servicing and for construction workers to limit pedestrian movement across the
               site. It is envisaged that these could be on small self-supporting trailers to reduce the ground surface
               touching and for easy removal/maintenance. These portable amenities will be available throughout the
               project, regardless of the number of workers on site.

       Laydown Areas:
           The establishment of well-defined laydown areas is crucial for efficient construction and minimizing
             environmental impact, careful planning is therefore required.
           The proposed carpark area at the northern end of the site offers a suitable location for primary delivery
             and laydown areas due to its ample space. The edge of this area adjacent to retained trees will require
             ground protection and/or exclusion from material storage.
           The footprint for Cabins 12-15 may offer additional laydown areas for materials delivered on-site due to its
             proximity to access roads. However, coordination with the existing RACV Resort may be required to avoid
             disrupting visitor access, which can be managed.
           Laydown areas will be strategically located to ensure efficient construction operations whilst minimizing
             environmental impact. Refer to ATTACHMENT D for proposed locations.
           Several key considerations for managing laydown areas effectively include the below – these will be part
             of the main contractor's site management planning:
             o Clearly defined boundaries
             o Ground protection measures adjacent to retained trees (physical surface treatments, geotextiles,
                   mulch)
             o Efficient material organization
             o Designated waste storage areas with regular removal schedules
             o Safety measures (signage, lighting, barriers)
             o Environmental protection (avoiding spills, leaks, and littering)

6




Construction and Tree Management Plan - REV03                                                                   Page    of 45

Used in these records

About this file

File size
9.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 2 - Construction and Tree Management Plan.pdf · 9.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.