Council archive · source document
Attachment 2 - Construction and Tree Management Plan · OPW25/0206
Plans and drawings: the text below has words only, no drawings.
3 T REE R EMOVAL AND C ANOPY M ANAGEMENT P ROCEDURES
To ensure retained trees are protected during the required tree removal and canopy management
operations, the following recommendations should be followed:
• Each individual tree for removal will be clearly marked by the Project Arborist with flagging
prior to commencement.
• The Project Arborist is to attend the tree works pre-start to provide guidance on the removal
operation with the nominated contractor.
• Trees are to be cross-checked against the Tree Retention and Removal Plan to ensure the
correct trees are removed.
• All tree removals and pruning are to be undertaken by qualified and experienced arborists,
both climbing and EWP where suitable.
• Cabin sites and boardwalk routes to be used for site access.
• Works to commence at the car park area located at the northern end of the site. This area is
to be used to process the tree material.
• No machinery is to be used to push over trees. Small machinery, if possible, can access
areas to remove timber and branches. Ground protection is to be used in non-Cabin site
areas, or close to retained trees.
• Trees are to be felled/dismantled away from retained trees and vegetation to avoid
unnecessary damage.
• If required due to direct conflict with construction, stumps are to be ground out to the required
depth.
• Retained trees on the edge of the final clearing limits and/or adjacent to future infrastructure
are to be assessed on the grounds of health and safety with additional tree works undertaken
as recommended by the Project Arborist. These works may include selective pruning,
removal of dead/defective branches targeting occupied areas and general pruning to promote
tree form and retention. All canopy management works are to be performed by suitably
qualified and experienced arborists.
• Tree removal and canopy management are to be undertaken in accordance with the relevant
ecology and fauna assessments and the presence of a qualified Fauna Spotter-Catcher.
• Any tree works required are to be guided by the concepts in Australian Standards AS 4373-
2007 Pruning of Amenity Trees, shall be supervised by the AQF level 5 suitably experienced
Project Arborist.
3.1 CANOPY MANAGEMENT
Canopy management requirements are assessed for each tree based on its age, condition, form,
and position within a site. Canopy management for mature and advanced aged trees can be
targeted at pruning to prevent hazards or reduce risk to an acceptable level whilst promoting a
sustainable future canopy and form or management of the natural environment adjacent
infrastructure and/or public amenity areas. It can also be undertaken to assist in the promotion of
new growth within the desired canopy form.
24_11_22_RACV Noosa_Tree Protection Procedures Page 5 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Construction and Tree Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.