Noosa Shire Council 2019 - 20 Annual Report
Corporate Plan - Theme 4: Other Initiatives to enable Council to achieve its goal for this theme
• The Queensland Audit Office gave Council another clean bill of health issuing an unmodified audit
Long term planning for Noosa Shire opinion.
Key achievements as we work towards our long term goal include: • Council implemented strong control measures to mitigate the sustainability risks associated
with Covid-19 direct financial impacts on Council which included re-prioritising expenditure and
Specific Operational Plan Priorities
projects, reviewing the 2020/21 budget assumptions including preparing detailed cash flow
• Council completed the community consultation on the draft new modelling and providing advice to support effective decision-making.
Noosa Planning Scheme and the Minister for Planning signed off • The Road Infrastructure Asset Management Plan was endorsed which is a blueprint to guide the
on the Plan subject to several conditions. Following the local management of the shire’s 867-kilometre road network and associated infrastructure assets now
government elections, the New Noosa Plan was adopted by and into the future.
Council at a July 2020 Special Meeting and was scheduled to • Council endorsed a new events policy to strike a balance between the use of public land for events
commence on 31 July 2020. The completion of the Plan paves the and the community’s right to use public space for recreation.
way for several key projects including the proposed Placemaking
• Council progressed planning and design for the Cooroy Noosa Road and Beckmans Road
pilot program.
intersection upgrade and secured $600,000 in funding from the Queensland Government for the
• The risk assessment and cost-benefit analysis for Council’s Coastal
design component and is advocating for construction funding.
Hazard Adaptation Plan (CHAP) was completed. The Draft CHAP
• Council developed and commenced implementation of a Strategic Tree Management Plan.
will be presented to Council in early 20/21 for consideration with
The new plan provides a framework to guide proactive arboriculture management decisions
the aim of completing community engagement by late 2020.
throughout the Noosa Shire. This is an essential component of achieving both a green liveable shire
• Council adopted the Noosa Spit Shoreline Erosion Management Plan which is a detailed study of
and effective management of trees on public land.
the erosion occurring on Noosa spit because of river movement, tide and boat wash. Funding
has been allocated in Council’s 2020/21 and 2021/22 budgets to commence planning and • Partnerships were established to provide better value for ratepayer money such as working with
construction works identified in the SEMP. Gympie Regional Council for the provision pre-cast concrete products.
• Council formed a working group to guide the Revenue Diversification Project. The working group
is investigating options to broaden Council’s revenue streams to reduce where possible the
reliance on general rate increases to fund service delivery.
• Council continued to implement the priority actions of the Noosa Transport Strategy including
completing the second annual Christmas ‘Go Noosa’ Peak Period Traffic Management Plan with
the introduction of a Shuttle Bus loop which saw a further 20% increase in public transport use
during our busiest time of year.
• Negotiations progressed with Translink to introduce electric buses
for Noosa, upgrade the Noosa Heads bus stop to a multimodal
interchange and improve public transport generally.
• The Schools program was re-commenced to improve traffic around
schools by getting more children using active travel and school
buses.
• Council completed a comprehensive analysis of the possible
options for the future use of the former Tewantin TAFE site. This
included new information regarding constraints on the site. Council
determined not to proceed with the purchase at the July 2020
Council meeting.
• Capital planning for the Walking and Cycling Strategy update and
High Priority Cycling Corridors continued along with the planning
for the Noosa Drive, Noosa Parade and Hasting Street precinct.
Council has successfully completed the design of the Noosa Parade
corridor upgrade with the assistance of Qld Government funding
and has submitted a grant application for delivery in 2020/2021.
Page 26 Page 27
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Annual Report 2019-20(PDF, 7MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.