10th July 2012
Sunshine Coast Regional Council
Locked Bag 72
Sunshine Coast Mail Centre Qld 4560
ATfENTION:- Mark Lewis
Dear Mark,
REFERENCE:- MLoll:IIo05:0PWU/0409
We wish to advise that works at 2 Russell St, Noosaville have now been
completed.
Please find attached a copy of our Engineers Completion Certificate as per the
conditions of the approval.
Could you please contact Greg Bowness on 07 5449 7555 or 0408 455 987 to
arrange your final inspection.
Yours faithfully
The Jetty Specialist
M
MRSTEVEBELT
Applications Officer ,"’~ : Pt-Al’f"I..Jt:rItfl;~If1e-",r
I Box: ...J.4.?!?~. R: .....10..........1
fr1l-
THE MARINA SPECIALIST PTY LTD TRADING AS THE JETTY SPECIALIST
2 Industrial Avenue, Caloundra Queensland 4551 Australia
Telephone 07 5492 5925 Freecall1300133155 Facsimile 07 5492 6699
-
ABN 32 010 633119
I. Quality
Endorsed
Web Page -
www.thejettyspecialist.com.au Email [email protected]
Company
1509001:2000
UcNo.OEC104532
StInCIIrdf;Ausnllf,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
-I(
,.
~r-,Care/no
COMPLETION CERTIFICATE
NEW PONTOON,CATWALK & RESTRAINT PILES
AT LOT 157 (2)RUSSELL STREET, NOOSAVILLE
FOR DIRECTOR OF HARBOURS & MARINE
We, Cardrio (Qld) Pty Ltd, hereby certify that we have inspected the manufacturing process for
pontoons and catwalks manufactured and installed by the Jetty Specialist.
An inspection of the completed installation has been carried out and it is our opinion that the work
has been carried out generally in accordance with the approved drawings.
The piles installation for the job (attached) has been reviewed by us and we consider the piles to
have been correctly installed in accordance with the requirements of the design and the relevant
Australian Standard.
Therefore, it is our opinion that the pontoon, catwalk & piles have been correctly manufactured and
installed and will be structurally adequate for its intended usage of mooring a domestic pleasure
craft of the size and type indicated on the approved drawings .and comply with the "IDAS Code for
Development Applications for Prescribed Tidal Works".
After inspection, it is our opinion that the bed and banks of the waterway for a distance of 15
metres around the site of works is clear of all debris related to construction of the works.
Signed
Graem
forC r. 0 (Qld)Pty Ltd
11 May 2012
L:\B7900-05\Sub008\233~Director of Harbours & Marine\Word\Completion Certificate - DIRECTOR OR HARBOURS & MARINE.doc