Council archive · source document
Engineers Completion Certificate · OPW11/0409
-I(
,.
~r-,Care/no
COMPLETION CERTIFICATE
NEW PONTOON,CATWALK & RESTRAINT PILES
AT LOT 157 (2)RUSSELL STREET, NOOSAVILLE
FOR DIRECTOR OF HARBOURS & MARINE
We, Cardrio (Qld) Pty Ltd, hereby certify that we have inspected the manufacturing process for
pontoons and catwalks manufactured and installed by the Jetty Specialist.
An inspection of the completed installation has been carried out and it is our opinion that the work
has been carried out generally in accordance with the approved drawings.
The piles installation for the job (attached) has been reviewed by us and we consider the piles to
have been correctly installed in accordance with the requirements of the design and the relevant
Australian Standard.
Therefore, it is our opinion that the pontoon, catwalk & piles have been correctly manufactured and
installed and will be structurally adequate for its intended usage of mooring a domestic pleasure
craft of the size and type indicated on the approved drawings .and comply with the "IDAS Code for
Development Applications for Prescribed Tidal Works".
After inspection, it is our opinion that the bed and banks of the waterway for a distance of 15
metres around the site of works is clear of all debris related to construction of the works.
Signed
Graem
forC r. 0 (Qld)Pty Ltd
11 May 2012
L:\B7900-05\Sub008\233~Director of Harbours & Marine\Word\Completion Certificate - DIRECTOR OR HARBOURS & MARINE.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineers Completion CertificateRelated documentApplication case desk ↗
About this file
- File size
- 803 KB (small file)
- File type
No other editions are linked here.