08/0587 - MCU - Commercial Business Type 2 - Medical [As Published] · 132008.587
NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 19 Earthworks 52. 53. 54. 55. 56. Earthworks required on site shail be carried out in accordance with Section 3.8 of Council's Engineering Design Standards Manual and so as not to cause the additional ponding of water on any adjoining lands or the blockage of, or interference with, any natural watercourses. Excavation of the site and the construction of the proposed works shall not have any adverse affects on the stability of adjoining buildings and/or structures and/or services and/or lands. In this regard a Registered Professional Engineer Queensland shall supervise the excavation of the site and the construction of the new works to determine whether any additional measures are required to protect the stability of adjoining buildings and/or structures and/or services and/or lands. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences that border the development site. Fences that are affected shall be replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced shall be clearly shown on the plans submitted for Operational Works approval. The use of vibratory equipment of any kind is not permitted to be used (including vibrating rollers and the use of vibrating installation techniques for sheet piling and other construction vibrations caused by excavating, earthmoving or demolition machinery or other similar construction techniques) unless approved and supervised by a Certified Geotechnical Engineer. Under such circumstances the operator of such equipment shall at ail times comply with the directions of the Geotechnical engineer and the reasonable and lawful directions of Council officers. The proposed use of such equipment shall be detailed in any application for a Development Permit for Operational Works. Certification of the completed works must be provided to Council by the supervising engineer. The certification shall state that the completed works, including any on site infiltration, conform with all aspects of the design and that the completed works will not have any adverse affects on the stability of adjoining buildings and/or structures and/or services and/or lands. Site Stability 57. 58. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, determine the soil classification, establish whether any measures are required to protect the stability of adjoining buildings and/or structures and/or land, and make recommendations on the type of foundation system(s) best suited for the proposed development. The recommendations of this report shall be incorporated into the design and construction of the proposed development. Should the recommendations of the geotechnical report require any part of the works (including excavation, retaining structures, tie backs etc) to be temporarily or permanently constructed within any adjoining property a letter of authority from the adjoining property owner shall be submitted to Council prior to the issue of operational works approval. Construction Issues 59. 60. A Construction Management Plan (including a Traffic Management Plan) addressing all construction phases shall be prepared by a suitably qualified person and submitted to Council for approval prior to obtaining a Development Permit for Operational Works. The report should aim to address every foreseeable problem that is likely to occur during the construction process and include recommendation on how these can be overcome or minimised and shall also address parking for construction workers. To ensure construction is undertaken appropriately, the Construction Management Plan shall also include a section written by a Geotechnical engineer addressing the excavation and surrounding site support systems. A Condition Survey is to be carried out on adjoining buildings, structures and services prior to any excavation or construction works taking place on site. If distress already exists, a photographic survey shall be undertaken, the distress measured and a plan to monitor changes to distress shall be implemented. A copy of this report is to be submitted to Council within 5 business days of the survey and prior to construction work proceeding. This report will be held by Council until all work is completed and will be used for verification purpose and to ensure that all buildings, structures and services are left in at least the same state as before construction commenced. Erosion and Sediment Control 61. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. AOP2 ¢:\docume~t\aop2Vocals~1\temp\bcl technologies\easypdf Sh@bci@40076eb3\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0587 - MCU - Commercial Business Type 2 - Medical [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.