Skip to the record
The only place to find full transcripts.

Council archive · source document

08/0587 - MCU - Commercial Business Type 2 - Medical [As Published] · 132008.587

of 50

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

NOOSA COUNCIL IDAS Development Application Decision Notice 9 of 19

In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
to the Council for approval prior to obtaining a Development Permit for Operational Works.

Contributions Towards Council Infrastructure

 

 

 

 

 

 

 

 

 

 

62. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading
various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution
amounts under the current Council policies and requirements is outlined in the table below:

Contribution Required For: Amount:

PSP12 —- Public Open Space Contributions (Park) $2,103

PSP16 - Sewerage Headworks Contributions $30,062

PSP17 - Water Supply Headworks Contributions $7,955

PSP20 — Pathway Trunk Network Contributions $2,125

TOTAL Contribution Amount = $ 42,245

Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane

from June 2007 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the contributions
not be paid at the due time, Council shall call upon the trading bank guarantee in full.
Processing of bonds for security where specific Council approval has been given for the bonding of
contributions will incur an administration fee in accordance with Council’s Land Development Commercial
& Regulatory Fees at the time of lodgement.
In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled,
the trading bank guarantee will be returned.

General

63. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be submitted in
conjunction with an application for a Development Permit for Operational Works. To avoid conflict with
underground pipes or services, all existing and proposed services required by the development shall be
shown on the plans.

64, Any alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council.

65. The transportation of all materials to and from the site shall be undertaken in a manner such that no

particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
be covered to prevent materials including dust being windblown from the vehicle.

Environmental Health

66.

67.

68.

The developer must provide waste storage and disposal facilities in accordance with Planning Scheme
Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, including an
external imperviously paved area correctly sized for all refuse and recycling containers and suitably
screened from public places and neighbouring properties. A bin wash area is required with a cold-water
tap, hose and drain outlet connected to sewer, via a bucket trap. The drain outlet is to be designed to
prevent storm water entry to the sewerage system and this can be achieved with a nib wall 50mm high
and up to 700mm x 700mm wide (max 0.5m7?), or alternatively the waste area can be roofed, or any other
design approved by Council.

Street litterbins to a design approved by Council’s Environmental Health Section, shall be supplied and
installed at the developers expense at agreed locations, as well as Buttout Bins. Prior approval is
required from Council's Vector Control Officer by contacting 5449 5232.

A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No. 9 “Waste
Management Multi-Dwellings and Commercial and Industrial Premises”, must be submitted for the day-to-
day operation of the development and approved by Council's Health Section prior to issue of development
permit for operational works.

It is critical that waste areas are properly planned. A copy of Planning Scheme Policy No. 9 explaining
exactly how to predict waste quantities and design waste areas is available from Council and the web.
The Plan shall include the following information: -

° The types of waste that will be generated from the activities approved within the development.

AOP2 c:\docume~ 1\aop2Vocals~1\temp\bcl technologies\easypdf S\@bci@4007 6eb3\@[email protected]

 

Used in these records

About this file

File size
3.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0587 - MCU - Commercial Business Type 2 - Medical [As Published].pdf · 3.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.