Noosa River DMP V1
Figure 16. Munna Point foreshore, northern side / Weyba Creek entrance.
Objective: To minimise impacts of the works on items of cultural or heritage significance.
Issues: No impacts expected.
Performance Criteria: No disturbance of cultural heritage items.
Control Measures:
Responsible
Control Measures
Party
1. If items are identified that potentially have cultural significance, immediately notify Traditional Owners and Contractor
seek advice.
2. Dredging and nourishment activities at Munna Point Caravan Park to be undertaken in a manner that Contractor
minimises impacts on visual and recreational aesthetics during the works.
3. Public access to be maintained to the foreshore during the works. Contractor
4. On completion, nourishment to form a natural profile and not present safety hazards to users. Contractor
Monitoring: Monitoring is to be undertaken in accordance with Table 4.
WASTE
Dredged sediments are not considered to be waste.
The dredging activity generates wastes, including general rubbish and hazardous wastes.
Objective: To minimise impact of waste generated by the dredging works.
Issues: Release of waste to receiving waters.
25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.