Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Noosa River DMP V1

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Performance Criteria: No loss of waste overboard. No unsuitable disposal of waste.


Control Measures:

                                                                                                                     Responsible
                                                   Control Measures
                                                                                                                        Party
 1.   No garbage to be thrown overboard or into the environment. Materials and equipment is to be secured to       Contractor
      prevent accidental loss overboard, particularly during inclement weather. If garbage accidently ends up in
      the water, it is to be retrieved.
 2.   Waste bins are to have secure lids, be appropriately sized and be disposed of regularly to a suitable        Contractor
      facility onshore. Waste to be recycled where possible.
 3.   Hazardous wastes must be stored in an appropriate and secure manner with collection and transport by a       Contractor
      licenced Contractor.
 4.   On completion of the works, inspect and remove any waste generated as a result of the works.                 Contractor
 5.   Refueling to be undertaken at an approved facility or in calm waters with the vessel moored alongside a      Contractor
      suitable area under the supervision of the Engineer.
 6.   Oil spill management plan to be implemented. Management Plan to be located on board. Staff are to be         Contractor
      suitably trained. Suitable oil spill control stations to be located onboard.
 7.   Suitable amenities to be provided onshore.                                                                   Contractor
 8.   Major repair and maintenance not to be undertaken on site.                                                   Contractor


Monitoring: Monitoring is to be undertaken in accordance with Table 4.




26
Log in to download the original file

Noosa River DMP V1.pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.