Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Noosa River DMP V1

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

     OPERATION

           OPERATIONAL PLANNING AND CONTROL
The Contractor will establish, implement, control and maintain the processes needed to meet environmental
management system requirements and to implement the actions identified in Section 5.
Environmental requirements are to be clearly communicated to subcontractors and external providers as
appropriate.




           EMERGENCY PREPAREDNESS AND RESPONSE
                 Oil Spill
An oil spill management plan is to be prepared by the Contractor and implemented throughout the works.


                 Incident Reporting

Any marine incidents are to be reported by the Contractor as required by the relevant legislation.




27
Log in to download the original file

Noosa River DMP V1.pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.