Council archive · source document
MCU21.0117 OPW21.0199-Att 5 Stormwater · MCU21/0117
3. STORMWATER QUANTITY
3. 1. D I S C H A R G E T O P E A R L S T R E E T
As the existing site and upstream catchments currently drain overland into private property
to the north and east, and the proposal seeks to discharge the run-off to a new legal point
of discharge in Pearl Street, a comparison of the pre-development discharges to post-
development discharges at the point of discharge is not appropriate. To demonstrate the
impact to the receiving environment (system), an assessment of the existing street drainage
capacity in Pearl Street has been undertaken. This demonstrates that the receiving system
(the street table drain system) has the capacity to carry the 1% AEP storm event from its
contributing catchment (including the development site) to the sag point of Pearl Street to
drain to the trunk stormwater drainage line.
Based on contours of the locality, surface run-off generally drains to the northeast towards
the existing drainage channel in the environmental park to the north. The existing
contributing catchment is predominately comprised of residential properties, road and
verge strips. The area currently draining to the street drainage system (where the new
proposed legal point of discharge is located) is shown below in Figure 3.1 – Existing Street
Drainage Catchments.
Figure 3.1 – Existing Street Drainage Catchments.
The peak storm event for the 1% AEP was modelled using the Autodesk Storm and Sanitary
Analysis module, with the catchment hydrology configured in accordance with the Bureau
of Meteorology’s IFD curves for the locality, and a minimum time of concentration of 5
minutes for each catchment. All catchments for the proposed development and the internal
drainage network and storage areas have been modelled, along with the upstream and
downstream catchments within Pearl Street (estimated based on contour maps and site
inspections), and the street drainage characteristics to determine a maximum discharge
from the development. The catchment details for the proposed development site (Figure
2.6 – Proposed Catchments Plan.) are shown below in Table 3.1-Development Catchment
Areas.
Page 8 of 33
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU21.0117 OPW21.0199-Att 5 Stormwater.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.