MCU21.0117 OPW21.0199-Att 5 Stormwater · MCU21/0117
Table 3.1-Development Catchment Areas
Catchment Area (Ha) Run-off Coefficient
C1 0.0167 0.96
C2 0.0196 0.96
C3 0.0279 0.96
C4 0.0168 0.96
C5 0.0168 0.96
C6 0.0354 0.76
C7 0.0030 0.33
C8 0.0097 0.33
C9 0.0191 0.33
C10 0.0168 0.76
C11 0.0369 0.76
C12 0.0082 0.33
E2 0.0442 0.34
E3 0.0667 0.34
E4 0.0372 0.77
E5 0.0204 0.96
E6 0.0331 0.37
E7 0.0277 0.77
Using the modelling, a suitable pump-out rate for the development to discharge into Pearl
Street can be established for the 100-year storm event. It was determined that discharging
from the proposed development at a rate limited to 64L/s (including the discharge of
upstream catchments that are conveyed through the property), will ensure that the
discharge is able to be conveyed in the street drainage system with minimal impacts to the
upstream or downstream properties.
The modelling also demonstrates that the storage areas, comprised of the 4 x 5,000L
rainwater tanks (attenuation portion only), the bioretention areas and the pump-out storage
manhole provide sufficient capacity so that the internal drainage network is not exceeded
Page 9 of 33
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU21.0117 OPW21.0199-Att 5 Stormwater.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.