Council archive · source document
MCU21.0117 OPW21.0199-Att 5 Stormwater · MCU21/0117
o ½ Pod C & Pod B roof run-off:
▪ 2x2 bed = 3.2 persons
▪ 2x3 bed = 4.6 persons
▪ 7.8 * 47L = 367L/day
o ½ Pod A roof run-off:
▪ 2x2 bed = 3.2 persons
▪ 3.2 * 47L = 150.4L/day
- External Reuse
o 75% of the pervious area in proximity to the tank will be irrigated at
548mm/year
o ½ Pod C roof run-off
▪ 0.75 * 110m² * 0.548 = 45kL/year
o ½ Pod C & Pod B roof run-off
▪ 0.75 * 162m² * 0.548 = 67kL/year
o ½ Pod A roof run-off
▪ 0.75 * 15m² * 0.548 = 6kL/year
4.2.1.1. Pit Inserts
All grated inlet pits within the development are to be fitted with Ecosol Litter baskets with
200µm filter Bags. These have been certified by the manufacturer as having the pollutant
removal efficiencies shown in Figure 4.5 - Ecosol Litter Basket Pollutant Removal Efficiencies.
The inserts are modelled using generic treatment nodes, with a high flow bypass of 53L/s
and concentration-based capture efficiency set in accordance with manufacturers
guidelines. Refer to Appendix D Ecosol Litter Basket Technical Specification for further
details on the devices.
Page 16 of 33
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU21.0117 OPW21.0199-Att 5 Stormwater.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.