NOOSA COUNCIL IDAS Development Application Decision Notice                                                    4 of 9


11.    The development of the site shall be carried out in such a manner as to prevent dust and/or sand
       nuisance to residents and/or tenants in the vicinity of the development.

12.    Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00
       pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
       hours are approved by the Manager-Land Development or his nominee.

13.    All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
       Traffic Control Devices and Traffic Infrastructure (Roads) Act.

14.    Safe pedestrian access on Headland Drive and Eumundi Noosa Road shall be maintained at all times.
       Should footpath / road closures be necessary to carry out construction works, Council’s Construction
       Technical Officer (ph 0410 512 505) must be notified prior to the proposed closure.

15.    Sediment and erosion control measures must be in place prior to works commencing. If such measures
       are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if
       sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
       natural waterways. Although the sediment and erosion control measures have been approved on drawing
       No 07562-4A dated September 2007 by TOD Noosa, Council’s Manager – Land Development may
       request further controls to be installed should approved measures be inefficient.

16.    Certification of the completed works must be provided to Council by the supervising engineer.

17.    These works are also to be in compliance with the relevant conditions of Development Permit No.
       2006/2241.

18.    Pursuant to Section 3.5.21(5) of the Integrated Planning Act 1997, the Relevant Period is two (2) years
       from the day this permit takes effect (until 17 December 2009) during which time all conditions must have
       been complied with and the Plan of Survey lodged with the Council for endorsement.

19.    Notwithstanding that Council has checked the plans with due care, where it is found during construction
       that variations from Council's standards exist, then Council standards shall apply.
       Water and Sewerage

       The water & sewerage plans listed below are satisfactory:

       07562-2A – Sewer Reticulation and Water Supply Plan
       07562-3A – Sewer Longitudinal Section and Notes

This Decision Notice is issued subject to and conditional upon the relevant Approved Development
Permit having been granted to the applicant.

20.    A copy of the job specification is to be provided to Council’s Inspector within seven (7) days of the date of
       this Decision Notice, and prior to commencement of works.

21.    The names of any proposed contractors for works are to be submitted in writing, together with copies of
       current Public Liability and Workers Compensation Insurances together with certificates of currency for
       those policies, for consideration by the Assessment Manager seven (7) days prior to pre-start meetings
       and commencement of works.
       A separate letter will then be issued approving the contractor (or otherwise) for the works. No other
       contractor or subcontractor shall be engaged to carry out the works or any part of the works without the
       written approval of the Assessment Manager.

22.    Council’s Water & Sewerage Inspector shall be given (7) days notice of intention to commence works. A
       pre-start meeting shall be arranged prior to commencement of works by contacting Council’s Water &
       Sewerage Inspector, Mr Trevor Mourilyan, Ph. 0417 780 830. Inspector is only available for pre-start
       meetings, inspections and testing etc. between the hours of 6:30am to 4:00pm, Monday to Friday.
       Inspector will not be available outside these hours unless prior approval is obtained from the Water &
       Sewerage Capital Works Manager with any costs incurred by Council outside the hours nominated above,
       met by the Contractor/Developer. These costs will be in addition to normal inspection fees.

23.    Notwithstanding that Council has checked the plans with due care, where it is found during construction
       that variations exist with Council's standards, Council standards shall apply.




NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@e40c7ff4\@[email protected]

Used in these records

About this file

File size
36 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00002031.002 [As Published].pdf · 36 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.