2021-08-16 General Committee Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 51 of 92
Noosa Depot Roof Replacment 5000 5,000 Carryover of final invoice costs for depot works completed in 2020/21
Tewantin Emergency Generator 5000800
Total Corporate Buildings 15,000 5,000 0 0 20,000
Trails Master Plan and Implementation Plan 55S ____ 68,553) Multiyear project. Planning underunderway. Construction scheduled for 2021-22.
Trail 5 Upgrade 1,440,725 193440, ~~ | ~~~, _ 4,634,165) Multiyear project. Planning underunderway. Construction scheduled for 2021-22.
Total Environmental Assets, Bushland, Tracks and Trails 1,440,725 258,993 0 0 1,699,718
Shire Gravel Resheeting Annual Program 41000000 410,000)
Total Gravel Road Network 410,000 0 0 0 410,000
Boreen Point Campground Upgrade Works - U&R at -30171, 70000 39,829 U&R grant funded project under construction, with grant time extension approved.
Total Holiday Parks 0 (30,171) 70,000 0 39,829
Whole of Shire Mobile Library Service Solution 346916 696,916 Vehicle on order, with procurement underway for kiosks
New Regional Art Gallery Pre-Feasibility Study 125,000) 925000
Total Libraries & Galleries 475,000 346,916 0 0 821,916
Noosa Hinterland Priority Playground 421248, = | ~—————s«|_—s« 4,160,752) Multiyear project. Construction works underway. Scheduled for completion December.
Sunshine Beach Skate Park New Shade Structure - U&R ee) 130137, 0 130,137 |U&R funded project about to commence construction, with grant time extension approved.
Lake Cooroibah Foreshore - CatD2019 500008 50,000 Fire Recovery Grant Project (Cat D). Not yet commenced.
Replace Shade Shelters at Noosa Banks - CatD 2019 18,821) | 13,821 | Fire Recovery Grant Project (Cat D). Not yet commenced.
Sunshine Beach Metal Skate Ramp Renewal 380,000,500
Total Parks & Playgrounds 4,932,000 -227,290 0 0 4,704,710
Noosa Heads Noosa Parade Road Corridor Upgrade - Design «2,000,000 -152833,— 1,847,167 | Multiyear project. Planning underunderway. Construction scheduled for 2021-22 to 2022-23.
Cooroy Maple Street Raised Pedestrian Crossing - LGGSP 316,000 567407, = = ss 883,407 Multiyear project. Construction works underway. Scheduled for completion Q2.
Tewantin, Hilton Terrace CNLGGP & Ivory Palms ee) 69909 20,000, += =~—~—~—_ 89,909 Commencement of works delayed, with $20k variation identified.
Noosaville Sea Eagle Drive & Shire Drive Pathway Upgrades ee) 176418, 176,418 | Works underway, with reseal work to be finalised in Q1 2021-22 to finish project.
Peregian Beach Boardwalk - U&R en) 32371, 32,371 U&R funded project under construction, with grant time extension approved.
Noosa Heads First Point-Picture Point Lighting Renewal 80,0000) 80,000
Sunshine Beach Belmore Terrace Pathway Renewal 100,000) 100,000
Castaways Beach Flagship Ct Missing Pathway Link Expansion 000) 00
Cooroy Maple St Pathway Overtander Av to Bruce Hwy 190.0000 190,000)
Cooroy Tewantin Rd Missing Pathway Link 80,500) 80,500
Noosaville Bluebell Ct Missing Pathway Link 13,000) 13,00
Pomona Stan Topper Park Pathway Link 92,000) 92,000
Tewantin Tinaroo Place Missing Pathway Link 12,000) 92000
Page 51 of 92See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.