Project Description                                                        2021-22     Carryover      Variation   Emergent         2021-22 Comments
                                                                              Original                                   Works         Revised
                                                                                Budget                                             Budget BR1

    Tewantin Poinciana Avenue Pathway                                            45,000       -45,000                                         0 Duplicate project proposed for removal. Forecast for 2022/23 ($150k budget)
    Park Rd Boardwalk Renewal - Temporary Path Removal                                                                    135,000       135,000 | Council resolution in April 2021 to remove the temporary footpath and remediate site
    Total Pathways & Boardwalks                                                2,770,500     648,272         20,000       135,000      3,573,772
Public Transport Infrastructure
    Shire Bus Shelter Disabled Compliant Program Annual - PTIAP                                                                                 Delays with completing all scheduled bus shelter replacements for 2020-21; to be undertaken in
                                                                                275,000        77,391                                   352,391 | 2021-22.
    Total Public Transport Infrastructure                                       275,000        77,391             0             0       352,391
Sealed Roads Network
    Shire Reseal & Rehabilitation Renewal Program Annual                       5,290,000      273,112                                  5,563,112 LRCI grant funded reseal works currently underway
    Tewantin Bypass Stage 1                                                    8,800,000      113,379                                  8,913,379
    Total Sealed Roads Network                                                14,090,000      386,491             0             0     14,476,491
Sports Ground and Facilities
    Cooroy Sports Complex Master Plan Implementation                             50,000                                                  50,000
    Total Sports Ground and Facilities                                           50,000             0             0             0        50,000
Stormwater Drainage
    Gympie Terrace Stormwater                                                   560,000        33,689                                   593,689
    Shire Bioretention Basin Renewals Program Annual                              75,000                                                 75,000
    Noosaville, Project Ave Stormwater Drainage Easement Upgrade                 152,324       63,982                                   216,306
    Sunrise Beach Sobraon Street Slope Stabilisation - W4Q &LRCI                      0      669.677                                    669.677
    Dath Henderson Culvert Repairs                                                                                        148,248       148,248 Emergent renewal works to culverts on Dath Henderson Road
    Noosaville Foreshore Park Stormwater Renewals                               200,000                                                 200,000
    Total Stormwater Drainage                                                   987,324       767,349             0       148,248      1,902,921
Transport and Infrastructure Management
    Whole of Shire Forward Planning & Design Program                            400,000                                                 400,000
    Tewantin, Hilton Tce & Emest St Intersection Upgrade                              0                      30,854                      30,854 Late Unitywater invoice received for mains relocation on on Hilton Terrace
    Transport Strategy, Walking & Cycling Strategy &CNLG Grant                        0        42.054                                    42.054
    Noosa Heads Bus Station Options Analysis and Concept Design                       0                                   200,000       200,000 | TMR contribution for planning works (50/50 TMR & council contribution)
    Tewantin Doonella St & Memorial Ave Intersection Upgrade                    275,000                                                 275,000
                                                                                                                                                Successful grant funding for planning works (50/50 grant & council contribution) to occur over 2021-
    Noosa Drive New Pathway Reef Hotel to Noosa Parade Planning & Design                                                  270,000       270,000 22 and 2022-23
    Total Transport and Infrastructure Management                               675,000        42,054        30,854       470,000      1,217,908
Waste Management
    500974 - Noosa Heads The
5	1	1	1	36	6	522	1942	97	22	96	Woods Bin Storage Enclosure 0      41,076                                    41,076 Completion of works delayed to 2021-22
    500976 - Masterplan Landfill SW Controls & Design                                 0        63,356                                    63,356 Multiyear project. Construction to commence 2021-22.
    510042 - Noosaville Eumundi Road Landfill Outbound Weighbridge              500,000        53,885                                   553,885 Multiyear project. Construction to commence 2021-22.
    510043 - Noosaville Eumundi Road Landfill Liner, Cell capping design       1,610,000       22,462                                  1,632,462) Multiyear project. Construction to commence 2021-22.
    510044 - Noosaville Eumundi Road Landfill Expansion of Resource Recov       250,000        18,727                                   268,727 Multiyear project. Construction to commence 2021-22.
    Total Waste Management                                                     2,360,000      199,506             0             0      2,559,506

                                                                                                                                                                                                               Page 52 of 92
Log in to download the original file

2021-08-16 General Committee Meeting Agenda(PDF, 8MB).pdf · 8.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.