GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
1.1 Corporate Plan Theme 1: The Noosa Environment
“Our environment is protected and enhanced and is valued by the community”
Key achievements as we work towards our long term goal include:
Specific Operational Plan Priorities
The Noosa Environment Strategy was adopted by Council in 2019 and implementation is well
underway. The first report on progress on implementation actions was provided to Council in
September 2020.
Council developed a draft Climate Change Response Plan and community consultation was
undertaken in relation to that plan. The final plan is proposed to be considered for adoption by
Council in August 2021.
Council established, in conjunction with Marine Safety Queensland (MSQ) the Noosa River
Stakeholder Advisory Committee. This committee has broad representation across the various
stakeholder groups for the Noosa River and is providing advice to both Council and MSQ on river
management issues.
Council entered into a new 4 year Partnership Agreement with the Noosa Biosphere Reserve
Foundation. A project that came to fruition in 2020/21 was the NBRF initiated project to develop
a new master plan for the hinterland tracks and trails. This has resulted in initial funding of $1.6M
from the State government to initiate its implementation with a focus on Pomona/Cooran.
Council worked with key partners to continue to transition the Yurol and Ringtail forestry areas
to National Park. The first 350 ha has been dedicated as National Park and final harvesting of
pine and hardwood forests is ahead of schedule. Tree planting at Ringtail has already occurred
via community tree planting days with over 25,000 trees planted. Negotiations are also underway
with a large not for profit organisation to join the project and undertake major restoration works.
Council has continued to reduce its carbon footprint
while aiming to achieve a zero net carbon emissions by
2026. This including installing more solar panels on
Council facilities.
The three-year partnership between Noosa Council
and The Nature Conservancy continues with the aim of
starting to restore the lost oyster habitat that once
formed the basis of the Noosa River ecosystem
ultimately improving biodiversity in the river.
Engineering and bathymetric work is complete.
Other Initiatives to enable Council to achieve its goal for this theme
Council continued to provide a Land for Wildlife incentive scheme providing free trees, training,
and contractor support to eligible properties. There are currently 360 Land for Wildlife members
with a total of 513 separate land parcels in this valuable voluntary conservation program.
Through the Environment Levy, Council purchased a significant parcel of land at Lake Flat Road,
Boreen Point for conservation. The 100 hectare property contains important wetlands and koala
habitat.
Council adopted the Noosa Bushland Reserve Strategic Management Plan and the Noosa
Bushland Reserve Strategic Fire Management Plan. These two plans outline how we will better
manage our bushland reserves and in particular, how we will manage fire risk in our Council
bushland reserves.
Page 81 of 92
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.