Original source · versioned page text
2021-08-16 General Committee Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Council continued to support the Noosa Biosphere Reserve Foundation which is continuing to
work closely with the community in developing signature projects that will maintain the balance
between people and the environment. NBRF continues to identify projects and seek funding that
are consistent with its objectives.
The Noosa River catchment maintained its A- rating in the 2020 Healthy Land and Water Report
Card, with the river also scoring a five-star economic and social benefit rating.
Council commenced work on a new Waste Strategy to guide responsible waste management
over the long term. Eleven additional methane extraction wells were installed in March 2021 and
further capping works are being undertaken to any methane escaping from the site. Options are
being explored to utilise methane for power generation on site.
Council supported Climate Week in March 2021 with over 20 events being held throughout the
shire.
1.2 Corporate Plan Theme 2: The Noosa Community
“Our community is connected, safe and happy and able to meet their potential”
Key achievements as we work towards our long term goal include:
Specific Operational Plan Priorities
Council continued implementation of Council’s Social Strategy including the Cultural Plan, Sport
and Active Recreation Plan and Health and Wellbeing Plan. Council endorsed a 2020/21 Action
Plan to progress implementation of the Cultural Plan.
Our Community Facilities (Noosa Aquatic Centre, Noosa Leisure Centre and The J) had difficult
trading conditions due to closures associated with the pandemic. Nevertheless, while open, they
continued to play an important role in the social fabric of our community and have performed well
given the COVID-19 context.
Planning approval was obtained and tenders let for the construction of the Hinterland Adventure
Playground at Cooroy. Construction has
started with the new all abilities playground
scheduled to open by the end of 2021.
Council sourced funding and assisted with
the construction of additional crisis housing
as part of the Shine Housing project.
A consultant was engaged to investigate the
needs and opportunities for a new Regional
Art Gallery including an examination of other
successful regional galleries. This work is
part of a long term strategy to establish a new
Regional Art Gallery for Noosa.
Council researched the best options for the replacement of our aging mobile library truck. A new
service model has been adopted that will provide more options for our community to access
library resources from locations other than Council’s two permanent libraries. The tender has
been let for the new mobile Library which will come into operation in 2021/22.
Master Plans for the Noosa District Sports Complex and the Cooroy Sports Complex were
adopted by Council last year and implementation is now underway. New lighting was installed
at the Noosa District complex and detailed design for internal roads completed and concept plans
for the well-being hub have been developed.
Page 82 of 92
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.