Table 1: Safety Risk Register
RISK IDENTIFICATION RISK ASSESSMENT RISK EVALUATION RISK TREATMENT RESIDUAL RISK EVALUATION
Risk Name Causes Consequences Controls to be implemented to reduce risk Control
Owner
Accepted / Not
Consequence
Consequence
Residual Risk
Likelihood
Likelihood
Risk
CONSTRUCTION PHASE
Works near water Falling into water from Drowning Works limited to depths shallower than 1m below MLWS at most sites (2m below MLWS max) Designer
barge or tender
Suitable plant and equipment that is in good repair and compliant with relevant legislation. Contractor
Excavator toppling into
Accepted
water from barge Excavator to be secured to the deck or alternate acceptable arrangements.
D
H
E
E
5
5
Walking or swimming in Site-specific Safety Plan implemented for proposed methodology and plant
water to inspect works Personnel to be aware of site conditions, including tidal cycles, water depths, current speed,
wind chop and vessel wake.
Diving Diving Diving Accident Diving not expected to be required. Separate safety assessment to be undertaken if Contractor
Accepted
Drowning proposed.
N/A
N/A
M
D
5
5
Powered mobile plant Excavator (barge- Injury or death Restoration Zones consider public usage as part of their selection. Sites are largely TNC
mounted) or similar. to personnel inaccessible by land, but works are within public waterways.
Injury or death Suitable plant and equipment that is in good repair and compliant with relevant legislation. Designer
to public
Experienced and licenced operators.
Accepted
Personnel to be trained in procedures.
D
H
E
E
5
5
Suitable PPE.
Site-specific Safety Plan to address these risks for specific plant and equipment.
Personnel nominated as a spotter for public persons in close proximity to the site.
For sites where land-based access is available, safety fencing is to be installed.
Electrical Excavator impact with Excavator Restoration modules at Tewantin site located minimum 20m from existing overhead power Designer
overhead power cable impact cable. Existing infrastructure to be considered when designing Phase 2 works.
(Tewantin) Injury or death
Accepted
Excavator impact with Contractor to locate services and infrastructure on site prior to start of work. This is to include Contractor
a Dial B4U Dig search, liaising with relevant agencies as required and physical location of
M
C
H
D
5
5
exposed submarine
cable during placement services and infrastructure on site.
Anchoring impacting on Site-specific Safety Plan implemented suitable for proposed methodology and plant.
submarine cable