Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Annex 8 - Safety in Design Report V1

Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).

of 13

Page text shows just the words. Original shows the document exactly as it was published.

          1.2.1 Principles
Integrated                    This assessment is undertaken during the design phase of the project, but
                              addresses risks expected to be encountered throughout the life of the project.
Structured & Comprehensive This report has been presented in a structured and comprehensive way and
                           should be reviewed and implemented in a similar manner.
Customised                    The assessment is specific to a single unique project. It should not be utilised on
                              other similar projects without review and adaptation as required.
Inclusive                     This report is to be provided to relevant stakeholders during the design process to
                              ensure awareness and facilitate discussion. Feedback is welcome.
Dynamic                       This report is a living document. It is the responsibility of the Client, Contractor
                              and future stakeholders to update the risk register as required during future stages
                              of work and in response to other changes that might affect the safety risk
                              assessment.
Best available information    This report is based on historical and current information as well as future
                              expectations. It considers limitations and uncertainties associated with such
                              information and expectations.
Human & Cultural Factors      Human behaviour and Australian culture have been considered when undertaking
                              this risk assessment.
Continual Improvement         ICM is committed to continual improvement.




          1.2.2 Framework
This report should form part of the client’s risk management framework.




          1.2.3 Process
Scope                         This report relates to health and safety risks associated with this project throughout
                              its life cycle.
Context                       A description of the project is provided in section Error! Reference source not
                              found.




                                                                                                                    2
Log in to download the original file

Annex 8 - Safety in Design Report V1.pdf · 769 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.