Original source · versioned page text
RFI - 250624 - 3 Allambi Rise - DA RFI response
Very large file (100 MB): the original may take a few minutes to open or download. The page text below is quick to read.
14 13 12 11 10
1880 4000 3590 3060
site boundary
1 1 1 1
400.05 400.07 400.06 400.08
Environmental Management and Conservation easement
roof
RL56.450
tsh01
tsh01
gls01 soffit - L2
con01
con01 RL54.150
stn01
gls01 gls01
gls01
ewl01 L2 ecf01 L2
L2 d03
L2 d01
w03
w04
ewl01
bal01
upper level - L2
RL51.450
con01
gls01 gls01 stn01 gls01
gls01 ewl01 L02 L1
L1 L1 L1 con01
L1 L1 d05 d09
w02 w03 w04 w05 w06 L1 L1 NGL + 8.0m
w07b w08
gls01 gls01
middle level - L1
RL48.125
stn01
bal02 bal02
stn01
existing RGL
lower level - L0
RL44.800
NGL + 2.0m
NGL
1 northern elevation
1 : 100
general notes general items legend
RL 60.200 spot level L1 (level) window code. refer to window component code. 20 step up code. note step line
1. all works to be carried out in accordance with the general construction 6. levels and services locations for civil works may vary from those shown -
notes in coversheets of this package. verify all levels and services locations prior to commencement of tos = top of step w01 (window ref) elevations + door/window dp01 (refer material code for similar) occurs on low side of level
2. all works to be carried out in accordance with the DA (if required) and BA construction. bos = bottom of step hardware schedules lvl lvl - 20 mm change
including drawings & conditions. 7. concrete profile and blockwork setout is provided on 220 (series) of RL = lvl at point (AHD typ)
3. handrails are required to all stairways where a change of level of drawings, refer to these for setout. licensed surveyor to establish grids.
RL xx.xxx top of wall (surface) level door/gate code. refer to window ceiling code hose cock. refer serivces
1000mm or greater occurs as per BCA 2013 Part 3.9.2.4. where discrepancies occur the 220 series drawings are to take L1 (level)
d01 elevations + door/window 2700 * heights are relative to assocaited schedule. client to confirm
4. where boundary locations are not clear, the builder shall arrange for precedent. (door/gate ref) height* hc
hardware schedules Ipb01 finish** finished floor locations
survey to locate the boundaries and complete an identification survey 8. Trees and landscaping shown on DA drawings (elevations and sections)
* refer finishes schedule
prior to setting out the new work. are indicative only. SSL xx.xxx structural slab level
5. contours shown are existing and do not represent finished levels. 9. Footings shown on DA drawings (elevations and sections) are indicative
only. material code. refer finishes J0.1 joinery code. refer to cabinetry (cos) check on site
Ipb01 Ipb01 schedule (typical). elevations on 820 (series) and (mir) mirrored detail
FFL xx.xxx finished floor level (refer also to sanitary/ applicances/
level joinery
details on 830 (series) drawings (sim) similar detail
reference
lighting/services as appropriate) (part) partial detial
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0453
F 29/05/2025 windows and doors 3 Allambi Rise, - elevation drawings SD 300.02 I SCALE As indicated
G 30/05/2025 energy efficiency Noosa Heads QLD 4567
A3
northern elevation
H 02/06/2025 hydraulic coordination
I 24/06/2025 DA RFI response
schematic design 1:1 @
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.