Original source · versioned page text
RFI - 250624 - 3 Allambi Rise - DA RFI response
Very large file (100 MB): the original may take a few minutes to open or download. The page text below is quick to read.
H G F E D C B A
1300 3300 1800 3170 1140 4900 650
site boundary
site boundary
1 1 1 1 1 1
100.11 400.04 400.03 400.02 400.01 400.00
roof
mts01
RL56.450
mts01 mts01
tsh01
con01 soffit - L2
RL54.150
NGL + 8.0m
L2 ecf01
w04 L2 L2 L02 3 Storey Weatherboard
d01 d03 w05 & Block House
2 Storey Weatherboard bal01
& Block House
upper level - L2
RL51.450
con01
con01 gls01
L02 L1 L1
d05 d09 d10
gls01 gls01
middle level - L1
RL48.125
NGL + 2.0m
stn01 bal02 tbs01
L00
d51
NGL
existing RGL lower level - L0
RL44.800
1 western elevation 01
1 : 100
general notes general items legend
RL 60.200 spot level L1 (level) window code. refer to window component code. 20 step up code. note step line
1. all works to be carried out in accordance with the general construction 6. levels and services locations for civil works may vary from those shown -
notes in coversheets of this package. verify all levels and services locations prior to commencement of tos = top of step w01 (window ref) elevations + door/window dp01 (refer material code for similar) occurs on low side of level
2. all works to be carried out in accordance with the DA (if required) and BA construction. bos = bottom of step hardware schedules lvl lvl - 20 mm change
including drawings & conditions. 7. concrete profile and blockwork setout is provided on 220 (series) of RL = lvl at point (AHD typ)
3. handrails are required to all stairways where a change of level of drawings, refer to these for setout. licensed surveyor to establish grids.
RL xx.xxx top of wall (surface) level door/gate code. refer to window ceiling code hose cock. refer serivces
1000mm or greater occurs as per BCA 2013 Part 3.9.2.4. where discrepancies occur the 220 series drawings are to take L1 (level)
d01 elevations + door/window 2700 * heights are relative to assocaited schedule. client to confirm
4. where boundary locations are not clear, the builder shall arrange for precedent. (door/gate ref) height* hc
hardware schedules Ipb01 finish** finished floor locations
survey to locate the boundaries and complete an identification survey 8. Trees and landscaping shown on DA drawings (elevations and sections)
* refer finishes schedule
prior to setting out the new work. are indicative only. SSL xx.xxx structural slab level
5. contours shown are existing and do not represent finished levels. 9. Footings shown on DA drawings (elevations and sections) are indicative
only. material code. refer finishes J0.1 joinery code. refer to cabinetry (cos) check on site
Ipb01 Ipb01 schedule (typical). elevations on 820 (series) and (mir) mirrored detail
FFL xx.xxx finished floor level (refer also to sanitary/ applicances/
level joinery
details on 830 (series) drawings (sim) similar detail
reference
lighting/services as appropriate) (part) partial detial
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0453
F 29/05/2025 windows and doors 3 Allambi Rise, - elevation drawings SD 300.03 I SCALE As indicated
G 30/05/2025 energy efficiency Noosa Heads QLD 4567
A3
western elevation 01
H 02/06/2025 hydraulic coordination
I 24/06/2025 DA RFI response
schematic design 1:1 @
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.