a. , AN. ,
_
168 FLINDERS STREET EAST in
TOWNSVILLE OLO 4870 ‘
PO BOX 1984 7
TOWNSVILLE OLO 4810 ‘
P (07) 4727 0100
F (07) 47270156 or
emanate _ [email protected] 1S |
LEGAL
Our Ref: PRC:KMG:080471:0325.01
Your Ref: 2008/1704 a
25 March 2009 aS A ON
(=) RECEIVED |
Sunshine Coast Regional Council 3,0 MAR 2009 3
Planning and Development Services 3
PO Box 141 SCcRC
TEWANTIN QLD 4565 — Tewantin
Attention: Denis Wallace Corey
Development: 30 Noosa Parade, by Strand Gardens Pty Ltd ACN 010 334 031 as
trustee (Strand Gardens)
Development Application: Operational Works Application for Prescribed Tidal Works
(Development Application)
Lot 14 Crown Plan N21842 (Land)
We act for Strand Gardens.
Response to Information Request
Enclosed is Strand Gardens, Response to the Information Request issued by the Sunshine
Coast Regional Council (Council) on the 15 January 2009.
This response follows the order of matters raised in the Information Request.
This response is provided in accordance with section 3.3.8(1 )(a)' of the Integrated Planning
Act 1997 (IPA).
Assessment of Application
To avoid any doubt, we advise that Strand Gardens will not be providing any further ;
information in relation to the Information Request, accordingly this letter also serves as a t
notice under section 3.3.8(1)(c)? of the IPA. . af
In this regard, Strand Gardens request that the Council now proceed with the assessment of i: ;
the Development Application. sof
' 3.3.8 (1) If the applicant receives an information request from the assessment manager or a concurrence agency (the mo
requesting authority), the applicant must respond by giving the requesting authority—
(2) all of the information requested:
3.3.8(1) If the applicant receives an information request from the assessment manager or a concurrence agency (the
requesting authority), the applicant must respond by giving the requesting authority—
(c) a notice—
{i) stating that the applicant does not intend to supply any of the information requested; and
(ii) asking the requesting authority to proceed with the assessment of the application.
. j
; aSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of sections 2 to 55 (of 114)
Section 2
Sunshine Coast Regional Council Emanaie Legal i oi
Planning and Development Services 25 March 2009 ={=
Attention: Denise Wallace Page 2 i my
PRC:KMG:08047 1:0325.01
Should you wish to discuss the foregoing, please do not hesitate to contact Peter Cardiff at
your convenience.
Yours faithfuily
Writer: Peter Cardiff
Direct: 47270100
Email: [email protected]
sa
ye
:
“
aSection 3
mea —
TOWNSVILLE QLD 4810 FA a)
Strand Gardens Pty Ltd
ACN 010 334 031 as trustee
Response to Information Request
Development Application for
Operational Works for Prescribed Tidal
Works
30 Noosa Parade, Noosa Heads
Lot 14 on Crown Plan N2184e
PRC:KMG:080471Section 4
168 Flinders Street East -
TOWNSVILLE QLD 4810 .
TOWNSVILLE QLD 4810 Ha *
PO BOX 1984 ood)
emanate P (07) 4727 0100 i
LEGAL F (07) 4727 0150
E [email protected] .
‘@ os
STRAND GARDENS PTY LTD
ACN 010 334 031 AS TRUSTEE
, 3
RESPONSE TO INFORMATION REQUEST
@ DEVELOPMENT APPLICATION FOR OPERATIONAL WORKS FOR le * “
PRESCRIBED TIDAL WORKS gh
30 NOOSA PARADE, NOOSA a
LOT 14 CROWN PLAN N21842 : t -
. OUR REF: PRC:KMG:080471 . 7 |
, 25 March 2009 0
, , *. .
"} oe . . * o . , +Section 5
scores BB
TABLE OF CONTENTS PO
TABLE OF CONTENTS oy
A. DEFINITIONS 2
B. BACKGROUND 3
C. SUNSHINE COAST REGIONAL COUNCIL REQUIREMENTS 4
1. AMENDMENT TO PLANS 4
2. ASSESSMENT AGAINST REVELANT SPECFIC OUTCOMES 6
@ 3. ENGINEERING CERTIFICATION 56
4. CONFIGURATION 57
APPENDICIES
APPENDIX ONE: MARITIME SAFETY QUEENSLAND APPROVAL .
APPENDIX TWO ENVIRONMENTAL PROTECTION AGENCY APPROVAL : _ ”
APPENDIXC THREE CORRESPONDENCE FROM SUNSHINE COAST REGIONAL cee
: COUNCIL a
APPENDIX FOUR INFORMATION REQUEST — SUNSHINE COAST REGIONAL ;
@ COUNCIL %
APPENDIX FIVE VISUAL AMENITY REPORT - LVO ARCHITECTURE -
APPENDIX SIX ORIGINAL DEVELOPMENT PLANS
| APPEDIX SEVEN UPDATED DEVELOPMENT PLANS
oe APPENDIX EIGHT ENGINEERING CERTIFCATION a
eo © smanate ae : Page 1
LEBAL Response to Information Request . , a -
A ‘ ? o : - \Section 6
. P, “Fa ye a
| Eh |
DEFINITIONS Poh i
A. DEFINITIONS |
In this Response to the Information Request unless otherwise provided or unless the subject
matter is inconsistent therewith the expressions following (whether appearing with or without
capital letters) shall have the meanings hereinafter respectively assigned to them.
“Council” means Sunshine Coast Regional Council;
“Development” means the proposed Prescribed Tidal Works -— Transport 5 — Domenstic
Marine Use (Jetty);
“Development Application” means the Development Application. Submitted to Council in
November 2008, Council reference: 2008/1704;
“EPA” means Environmental! Protection Agency;
® “IPA” means /ntegrated Planning Act 1997; ,
“Land” means the property at 30 Noosa Road, Noosa Heads more formally known as, Lot
14 on N21842 title reference: 15798246;
“MSQ” means Maritime Safety Queensland;
“Planning Scheme” means the Noosa Planning Scheme: The Noosa Plan;
“Policy” means Noosa Planning Scheme Policy 4 - Domestic Marine Uses outside of the
Noosa Waters Estate; -
“Response to Information Request” means this document and any schedules, - be
appendixes or attachments herewith; and ,
“Strand Gardens” means Strand Gardens Pty Ltd ACN 010 334 031 as Trustee, the , :
applicant for the Development Application and the registered owner of the Land.
@ -
+
4
: TT >a og
eh ws Page2
nd emanate Response to Information Request _ “eg
bo, a _*. OsSection 7
ot! ,
BACKGROUND Ber 4
B. BACKGROUND :
° Maritime Safety Queensland as concurrence agency for the Development -
Application, issued Water Allocation Area approval for the prescribed tidal works on
15 October 2008 a copy is attached at APPENDIX ONE;
° EPA as concurrence agency for the Development Application issued a Resources
Entitlement on 21 Novemeber 2008 a copy is attached at APPENDIX TWO;
° Strand Gardens lodged the Development Application with Council on 28 November
2008;
° Council issued an Acknowledgement Notice on 12 December 2008; mo
° The following agencies were identified in the Acknowledgement Notice as a referral ,
@ agency for the Development Application: ,
° EPA as concurrence agency — requiring Resource Entitlement Approval a
° MSQ as concurrence agency - requiring Water Allocation Area Approval : a
sgl,
° Council confirmed via electronic correspondence (email) that referral was not
necessary on the 17 December 2008 as both agencies had responded in advance, a ?
copy of the email is attached at APPENDIX THREE; ae
e Council issued an Information Request on 15 January 2009, a copy is attached at ”
APPENDIX FOUR; eel
ee
This document is in response to Council’s Information Request. we a
ot,
The document is set up so that each request is reproduced in italics with a response aa .
immediately following each request item. tay
e . A
-
. ay ;
‘ ‘ d,
, 2
© a cee Page 3 oy
emanate Me _. Response to Information Request aeSection 8
ote |
RESPONSE TO INFORMATION REQUEST Fo ,
i
C. SUNSHINE COAST REGIONAL COUNCIL REQUIREMENTS
1. AMENDMENT TO PLANS
1, The proposal in its current form is considered excessive in the size, visual bulk and
number of structures proposed and is unlikely to be supported. Please submit amended
plans indicating:
1.7, Removal of the regatta stairs which are not considered necessary to provide
access to a vessel, given that a separate jetty/pontoon is sought.
1.2. A reduction in the size of the pontoon to comply with Council's Planning
Scheme Policy PSP4 - Domestic Marine Uses Outside of Noose [email protected]. An amended jetty structure indicating either: .
a.
1.3.1. Provision of a standard gangway to provide access to the pontoon to ngs
reduce the visual bulk of the sfructures; or ~
1.3.2. A fixed timber jetty complying with Council's Planning Scheme Policy
PSP4 - Domestic Marine Uses Outside of Noose Waters Estate and
deleting the pontoon structure; or -
1.3.3, A reduction in the level of the jetty platform to the minimum required above
HAT and the provision of only a single stair access at the jetty head / ” -
pontoon.
1.4. Materials and colours of all structures.
@ 7.5. Elevations of the proposed structures indicating the various HAT, LAT, MHWS and .
MLWS levels, *
1.6. Please indicate on the plans that all sections of the existing structure located in the
river frontage of the subject property, both above and below water level, have been
removed or will be removed as part of these works.
4
RESPONSE ae
; 1. Strand Gardens does not accept that the proposal is excessive, this is a contempory :
Oo standard of boat mooring that would be expected for a dwelling of this quality and it will
not be changed to something comparable to a backwater facility.
The appropriateness of the facility is confirmed in the Visual Impact Report prepared
i: by LVO Architecture at APPENDIX FIVE. y
, 1.1 The regatta stairs allow safe access to the water over the rock face, and is in nee
: © ; aa Page4 ss " *
emanate ae ". Response to Information Request arySection 9
[8] :
RESPONSE TO INFORMATION REQUEST Pah
keeping with the standard of the dwelling being built by Strand Gardens. ,
Originally Strand Gardens wanted wider regatta stairs (refer to plan at -
APPENDIX SIX). However during discussions with MSQ they were reduced to ;
sit neatly behind the pontoon.
4.2/1.3 itis noted in the LVO Report at APPENDIX FIVE that in Strand Gardens case
a policy compliant 5 meter x 3 meter pontoon which was connected to the
shoreline by a narrow ramped gangway did not provide a development that
was “at a scale and nature complementary and respectful to their
surroundings”. A compliant pontoon would be 5m x 3m (ie. 15m? in area) the
proposal is for a 8m x 2m pontoon (ie. 16m*). Strand Garden suggest the
difference in scale is negligible. Further it is noted if one of the stairs which
link the walkway to the pontoon was to be removed from the proposal, the
asymmetrical result would not complement either the scale or the symmetry of
the house and the surrounding built form. [email protected] Strand Gardens submits that materials and colours of the prescribed tidal a
works will be complementary to its surroundings, refer to Development Plans - be
at APPENDIX SEVEN. LS vs
1.5/1.6 The updated plans at APPENDIX SEVEN indicate the various HAT, LAT, Hoy —
MHWA AND MLWS levels as well as illustrating the location of the previous as a
structure and confirming its removal.
2
: © Page 5 ‘38
emanate - Response to Information Request oe es
oe . ” 2 oe eye oF .
og ” : - te .*Section 10
fag! :
RESPONSE TO INFORMATION REQUEST FA "oy
2. ASSESSMENT AGAINST REVELANT SPECFIC OUTCOMES
Please provide an assessment of the proposed structures with regard to the relevant specific ,
outcomes of Schedule 4a - IDAS Code for development applications for prescribed tidal work
of the Coastal Protection and Management Regulation 2003.
RESPONSE
The following is an assessment against Schedule 4a. We note the proposal is in teh Noosa
River and not in a canal.
$01.1 Prescribed tidal work | PS1.1 The design and | PS1.1 Strand Gardens
in a canal and for a construction of the submits that proposed
© private purpose is prescribed tidal work jetty’ pontoon is not
compatible with its is consistent with located in a_ canal,
location, having regard the following therefore SO1.1 is not
to the following— standards— applicable.
(a) the character and: (a) subject to
amenity of the paragraph (c),
work's immediate prescribed tidal
surroundings and work does not
the locality within extend past
which the work is the side
located; boundary or
; extended side
(b) if the relevant boundary of the
planning scheme lot connected
states the to the work;
desired
character or {b) subject to
amenity for the paragraph (c),
work's prescribed tidal
. immediate work is not
oO surroundings or roofed;
re cea witin |e) a relevant
is located—the P Nome
stated desired seneme .
character or standard IS
amenity more stringent oo,
than the
standard oN
mentioned — in .
paragraph (a) 4
or (b}—the .
relevant
planning
scheme
standard, to
the extent it is
more stringent
than the
, standard
4 mentioned __in -
. TTT / « .
© te oy °° Page 6 7
emanate Response to Information Request : ‘-Section 11
Le
RESPONSE TO INFORMATION REQUEST Pa ;
paragraph (a)
or (b);
(d) any other
relevant
planning
scheme
standard that is
not inconsistent
with the
standards
mentioned in
paragraphs
(a) to (c).
oO $01.2 Prescribed tidal work | PS1.2 The design and | PS1.2 Strand Gardens
in a canal and for a construction of the submits the prescribed
non-private purpose prescribed tidal work tidal works are not for .
is compatible with its is consistent . with commercial purposes
location, having the following therefore S$O1.2 is it
regard to the standards— not applicable.
following— (a) subject to
(a) the character and paragraph (c),
amenity of the prescribed tidal
work's immediate work used for
surroundings and a commercial
the locality within purpose does
which the work is not extend
located; past the side
. boundary or
(b) Nanning rerevant extended side
states the boundary of the
. lot connected
desired
to the
character or work:
O amenity for the , .
work's {b) subject to
immediate paragraph (c),
surroundings or prescribed tidal
the locality within work is not .
which the work roofed unless it
is located—the is the main ~
stated desired access to .
character or land; .
amenity. (c) if a relevant Sy
planning
scheme
standard is
more stringent
than the
standard
mentioned in
paragraph (a)
or {b}—the
relevant ‘
ou © ., . : , z Page 7 ds
r : emanate _ Response to Information Request “4
. LEGAL : a has a , oeSection 12
a .
[rt .
RESPONSE TO INFORMATION REQUEST gatag .
planning
scheme
standard, to the
extent it is
more stringent
than the
standard
stated in
paragraph (a)
or (b);
(d) any other
relevant
planning , ;
scheme .
standard that ,
is not
o inconsistent gg
with the Pas
standards io
_ mentioned in *
paragraphs
(a) to (c).
$02.1 Prescribed tidal work | PS2.1 The design and | PS2.1 Strand Gardens
not in a canal and for construction of the submits the proposed
a private purpose is prescribed tidal work jety/ pontoon.
compatible with its is consistent with
location, having the following
regard to the standards— (a) Does not ;
following— (a) subject to encroach past ee oS
(a) the character and paragraph ({e), s! de bo nd en e
amenity of the prescribed tidal side boundary,
work's work does not (b) The proposed 3
. immediate extend past the work will not be “ee
© surroundings side boundary roofed ‘ea
and the locality or extended my
within which the side boundary (c) The — proposed re
work is located; of the lot structures are in 7
connected to accordance with a
(b) if the relevant the work: relevant planning ea
planning scheme , scheme + dn Ss
states the (b) subject to standards Tan,
; desired paragraph (e), mentioned in (a) “2%
oo character or prescribed tidal and (b). ga,
mo amenity for the work is the moa
i * work's only work of Strand Gardens further *
e immediate its type along submis nal hae
- surroundings or the edge of been sb one 4 t as
the locality within the tidal water M J aineg from
which the work fronting the lot oan efor C
' is located—the connected to
te stated desired the work; APPENDIX ONE).
character or ;
: (c) subject to .
LO amenity. paragraph (e), “"
_ © me . " Page 8 ee
“. + ,emanate "+ Response to Information Request se
~— LEGAL Co ies ‘ 3 “ . i+ oy a : “4 :Section 13
;
oy “
RESPONSE TO INFORMATION REQUEST Fa by,
Oy
7
prescribed '
tidal work that 4
is a boardwalk 3
or
independent
deck is not
roofed;
(cd) subject to
paragraph (e),
prescribed tidal
work other
than a
boardwalk or
deck is not
roofed unless it
@ is the main
access to
land; oi.
(e) if a relevant ae
planning wae
scheme we?
standard is .
more stringent
than the .
standard “oe
mentioned in one
paragraph (a), we
(b), (c) or at
(d} the as
relevant Nes
planning ae
scheme we
standard, to is
the extent it is
y more stringent 7
@ than the
standard
mentioned in
paragraph (a),
(b), (c) or (d);
(f) any other ;
relevant i!
planning *
scheme a
standard that
is not
inconsistent
with the
standards
mentioned in .
paragraphs é
(a) to (e).
‘
ee “4
~ © | . “ee Co PageQ kg
DO emanate , .Response to Information Request we eg
. LEGAL Bo - . : ob - ot
es Ae . po. 7Section 14
, 1 “sy . i
¢
CA %
RESPONSE TO INFORMATION REQUEST getay ;
$02.2 Prescribed tidal work | PS2.2 The design and | PS2.2 Strand Gardens .
not in a canal and for construction of the submits the prescribed "
a non-private prescribed tidal tidal works is _ for
purpose is work is consistent private purposes
compatible with its with the following therefore SO2.2 is it
location, having standards— not applicable.
folowing the (a) subject to
paragraph (c),
(a) the character prescribed
and = amenity tidal work
of the work's used for a
immediate commercial
surroundings purpose does
and the locality not extend
within which the past the side
© work is located; boundary or :
. extended side woos
(b) if the relevant boundary of es OD og
planning the lot Sed
scheme states. connected to DT TS
the desired the ce
character or .
: work;
amenity for the
work's (b) subject to
immediate paragraph (c),
surroundings or prescribed
the locality tidal work
within which the used for a
work is commercial a
located—the purpose is not cat
stated desired roofed unless "
character or it is the main ane
amenity. access to a
. land; *y
@ (c) if a relevant
planning *
scheme .
standard is
more stringent
than the
standard .
mentioned _ in .
paragraph (a) q
or (b)—the :
relevant "
planning #
scheme ‘
standard, to
the extent the
standard is
more stringent
than the
standard “
mentioned — in
paragraph (a “4
© : : , } - ; , : .
a rr yy Page10 .- 2
emanate “* 4 & Response to Information Request 9 ioe
LEGAL ee OR te oe Low
ee. “ aot - pe . wtSection 15
. . 4
rte
RESPONSE TO INFORMATION REQUEST PAE i
or (b); 7
(d) any other
relevant
planning
scheme
standard that
is not
inconsistent
with the
standards
mentioned in
paragraphs
(a) to (c).
Oo $03.1 Prescribed tidal work | PS3.1 The height, scale | PS3.1 Strand Gardens
is of a height, scale and size of the submits that — the a
and size to ensure prescribed tidal work proposed jetty and oe
the work is is consistent with regatta stairs = are sy
compatible with the each relevant compatible with the ous f
character and planning scheme setting and character a
amenity of its standard. of the locality
oard to ne For further justification
following— refer to Visual Amenity
Report at APPENDIX
{a) the height, scale FIVE.
and size of the o
natural features rh
of the work's ee
immediate a
surroundings and ae
the locality tt
within which the -
work is located; *
oO (b) the height, scale .
and size of the
existing
buildings or
other structures
in. the work's
immediate
surroundings and F
the locality
within which the
work is located;
(c) if the relevant
planning scheme
states the
desired height,
scale or size of é
buildings or j
other structures ‘
in the work's :
immediate :
© , ee oe Page 11 ,'
emanate ., Response.to Information Request Beate,
eo REGAL ew gle vem gy ro re: - ae me,
ms ‘ i So weeSection 16
Pojed |
RESPONSE TO INFORMATION REQUEST th
surroundings or
the locality within
which the work
is located—the
stated desired
height, scale or
size.
$04.1 The materials used | PS4.1 The materials used | PS4.1 Strand Gardens
for, and the colours for, and colours of, submits the materials,
of, prescribed _ tidal the prescribed tidal and colours of, the
work are compatible work are consistent prescribed tidal work will
with the character with each relevant be sympathetic. of the
and amenity of the planning scheme surrounding area and
work's location, standard. will be in accordance
oO having regard to the with relevant planning
following— scheme standard.
(a) the natural Refer to LVO Report at
features of the APPENDIX FIVE.
work's .
immediate
surroundings
and the locality
within — which
the work is
located;
(b) the existing
buildings or
other -
structures in 7
the work's ‘
immediate
surroundings
O and the
! locality within
which the
work is
located;
(c) if the relevant
planning
scheme states ,
the desired if
materials to be wo
used for, or
desired
colours of,
buildings — or
other
structures in
the work's
immediate
surroundings
or the locaili .
eee wo .
- ©: a ae De Page12 ~ ©
mo emanate + Response to Information Request ersSection 17
2 - r x
- - 6
th BS
RESPONSE TO INFORMATION REQUEST FAA de
.
within which
the work is ;
located—the
stated desired
materials or
colours
$05.1 Lighting, other than | PS5.1 The lighting for the | PS5.1 Strand Gardens
an aid to navigation, prescribed tidal submits that while no
for prescribed tidal work, other than an lighting is proposed at
work is installed in a aid to navigation, is this juncture if any is
way to ensure the consistent with the installed it will be in
security and safe following accordance with
use of the work standards— AS4282 The Control of
without causing the Obtrusive Effects
© significant adverse (a) subject h to of Outdoor Lighting..
effects on the amenity vehting (c),
ep ighting for .
of the locality within prescribed tidal Soe
wre the work. is work is hooded ar
and directed “od
downwards; ‘
(b) subject to
paragraph (c),
each __ lighting
standard, to the
extent relevant;
(c) if a relevant
planning oh
scheme 3
standard is ”
more _ stringent ‘.
than the a
. standard
@ mentioned in as
paragraph (a) ©
or (b)—the
relevant
planning
scheme
standard, to Oo
the extent the
standard is
more stringent ‘
than the .
standard
mentioned — in
paragraph (a)
or (b);
(d) any other
relevant
planning a
scheme “le
standard _ that i
ae —.wooeem eae
i © oe : . Page 13 oS
emanate 7 Response to Information Request aSection 18
Paice
RESPONSE TO INFORMATION REQUEST Fach -
is not
inconsistent ‘
with the ,
standards
mentioned — in
paragraphs
(a) to (c).
$06.1 A sign’ erected or | PS6.1 A sign erected or | PS6.1 Strand Gardens
otherwise placed in otherwise placed in submits no signage is
position for position for prescribed proposed.
prescribed tidal work, tidal work, other than
other than a_ sign a sign erected or
erected or placed for placed for safety
safety reasons or reasons or under an
O under an Act— Act, is consistent
(a) is compatible with with ne _ folowing .
the character and .
amenity of the (a) subject to
work's immediate paragraph (c),
surroundings and a sign erected
the locality within or placed in
which the work position for
is located; and identifying
{b) is not a dominant presonbed tidal
feature of the work, or the
owner of the
work, unless the ;
: - work, is the
dominance is for . as
only sign . |
safety reasons erected or
placed in
position for _
identifying the
work or owner; ,
O {b) subject to
paragraph (c),
a sign erected
or otherwise
placed in
position for
prescribed _ tidal ‘
work is :
integrated into J
oy the design and
oo construction of
the work;
(c) if a relevant
a planning
scheme
standard is more
stingent — than
the standard
mentioned in ,
: os oe. ." + wo Page 14 a
emanate - Response to Information Request” 9 mo,
LEGAL oof : Boga COSection 19
3 -
TE]
RESPONSE TO INFORMATION REQUEST Foch . €
~_
paragraph (a}—
the relevant ,
planning :
scheme
standard, to the
extent it is more
stringent than
the standard
mentioned — in
paragraph (a):
(d) any other
relevant
planning
scheme
standard that is
O not ;
inconsistent
with the . ”
standards we
mentioned in . a
paragraphs ‘
(a), (b) and (c).
$07.1 Excavation and filling | PS7.1 The earthwork and | PS7.1 Strand Gardens oes
for prescribed tidal filling for the submits no excavation a,
work— prescribed tidal work or filling is involved ve
. is consistent with orate
(a) or carried ne each relevant , of
extent o © planning scheme Sos
reasonably standard ny
necessary for a
the work; and te
(b) does not have a :
OQ significant
adverse effect
on-
(i) the natural
features of
the tidal y
water under, .
¢ within or an
over which oe
Meet the work is awe
os located: or
i (ii) the level of
the surface
of the land
under the
tidal water
: under, within
co or over &
7 . which _ the “
. Thy
/ at : oo . . soe age . a
a ‘emanate me Response to Information Request. -- 3 oo vt
Lote, LEGAL , Mg i ne,
: tea ¢ etm PF ae oy We
ek ~ ee , Pee mo,Section 20
i tag ° 2s
Paice
RESPONSE TO INFORMATION REQUEST Foch :
work is 7
located, or 7
any .
foreshores
near the
work.
, $07.2 The location of | PS7.2 The vegetation in | PS7.2 Strand Gardens
prescribed tidal work the tidal water, submits no vegetation
ensures vegetation under within or over has to be cleared for
is cleared or which the prescribed the works to proceed.
disturbed only to the tidal work is
extent reasonably located, or on land
necessary for the under the _ tidal
work. water, is cleared or
O disturbed in a way
consistent with i
each relevant oy,
planning scheme on
' Standard. ae!
$07.3 Any vegetation | PS7.3 Vegetation affected | PS7.3 Refer to PS7.2.
damaged, destroyed by the prescribed
or removed by tidal work is dealt
prescribed tidal work with in a way
under, within or consistent with the
over tidal water following Vo
other than an standards--- ™
artificial waterway, is . gba
replaced with (a) subject h By u
aporoprate reece,
vegetation. 9
damaged,
7 destroyed or .
O removed by
prescribed
tidal work is
replaced with
native
vegetation for
the _ locality ‘
within which +
the work is .
located, to the :
extent it is ‘3
reasonably
practicable to
, replace the
vegetation
. with native
vegetation;
(b) if a relevant
planning ~
© Me Page 16 a
emanate Response to Information Request. 9 oo
LEGAL gp OT CsSection 21
to a4
RESPONSE TO INFORMATION REQUEST Face ¢
|
scheme
standard is ’
more stringent
than the
standard
mentioned in
paragraph
(a} the
relevant
planning
scheme
standard, to
the extent it is
more stringent
than the
standard
oO mentioned — in '
, paragraph (a); an
{c) any other - ve
relevant Re git
planning .
scheme
standard that
is not
inconsistent
with the
standards
mentioned in
paragraphs
(a) and (b).
$08.1 Prescribed tidal work | PS8.1 The design and | PS8.1 Strand Gardens
does not have a construction of the submits the design and
significant adverse prescribed tidal work construction of the
oO effect on the is consistent with the prescribed tidal work .
availability of public following will not have an
access to foreshores, standards— adverse impact on
including public . public access to the
access proposed in (a) subject . foreshore as there is
the relevant planning Paregren i ) no current __ public
scheme. Oo does rot access only private 7
involve the access for the’ 2
, . adjoining residence. ee
: erection or . “~
placement of fon oe
° any __ physical ele.
: barrier feos
, preventing
existing access, oe
along a public °
accessway, to -.
the foreshores .
near the work;
: b) if a relevant
7 ©. - ee re : Pace 17 Set
. - “emanate - Response-to Information Request 9 4
LEGAL oa +> a ost eve Be oe seSection 22
AG 4
RESPONSE TO INFORMATION REQUEST PAE
planning ¢
scheme .
standard is more
stringent than
the — standard
mentioned in
paragraph (a}—
the relevant
planning
scheme
standard, to the
extent it is more
stringent than
the standard
mentioned — in
. paragraph (a);
oO (c) any other
relevant “
planning eo
scheme —
standard that is .
not
inconsistent
with the
standards
mentioned — in
paragraphs (a)
and (b). :
$09.1 The location and design | PS9.1 Public access to | PS9.1 Refer to PS8.1. ;
of prescribed tidal work foreshores near the
does not adversely prescribed tidal work
affect the safety of is consistent with
members of the public each relevant
O accessing the planning scheme .
foreshores. standard,
$010.1 Prescribed tidal work | PS10.1 The design and|PS10.1 Strand Gardens
does not adversely construction of the submits that the
affect navigable prescribed tidal work prescribed tidal work is
access to, or is consistent with located within the
navigable egress the following Water Allocation Area,
from, any non-tidal standards- approved by Maritime .
: work lot. (a) subject to Safety 1 Queens‘and ;
‘ paragraph (b), if and wi not affect
the lot navigable access.
connected to
prescribed _ tidal
work (the
connected fot)
adjoins a non-
tidal work lot,
the work does
not extend past
. -* © oo Page18 ...*
emanate a Response to Information Request 9 ~ 7
. mee aSection 23
ett |
RESPONSE TO INFORMATION REQUEST aaleg
the connected °
lot's side
boundary, or
extended side
boundary,
adjoining the
non-tidal work
lot;
(b) if a relevant
planning ,
scheme
standard is
more _ stringent of
than the
standard
a mentioned — in
O Paragraph
(a}the
relevant . .
planning coors
scheme te
standard, to .
the extent it is
more stringent
than the
standard
mentioned = in
paragraph (a).
$011.1 Prescribed tidal work | PS11.1.— The infrastructure for | PS11.1 = Strand Gardens ae
has appropriate prescribed tidal work submits the prescribed mo
infrastructure, is consistent with tidal work is for private Ty
including, in each relevant use and will include —
particular, road planning scheme the appropriate
O access, parking standard. infrastructure relevant ws
facilities, sewerage to the scale and size of fit
services and water the prescribed _ tidal .
services, having work in accordance
regard to— with the relevant
(a) the nature and panning scheme
scale of the work; ‘
and ‘a
{b) the number of a
people that may :
' be on or at the
work at any time;
and
(c) the number of
vehicles that may
be on or moored
at the work at
any time; and
© Te : Page 19
vO, emanate ‘Response to Information Request etSection 24
ae ‘
Peto
RESPONSE TO INFORMATION REQUEST Fac
(d) the protection of
any foreshores
near the work and
the vegetation
and marine
plants on the
foreshores.
$012.1. Prescribed tidal work} PS12.4 The design and |PS12.1 Strand Gardens
is designed and construction of the submits the prescribed.
constructed in a way prescribed tidal work tidal work has . been:
to ensure it is is consistent with designed and will be
structurally sound, the following constructed in}.
having regard to the standards— accordance with: .
O following— (a) subject to (a) relevant
(a) relevant paragraph engineering
engineering (b), each standards; a
standards; Australian (b) the location of _ 7.
(b) the location Standard the work;
of the work: relevant to the , Le
; design or (c) the purpose for
(c) the purpose for construction of which the work is
which the work is structures, to to be used;
to be used; ne : extent (d) the impact of
. equirements . .
(d) the impact of stated in. the flooding, tidal!
flooding, tidal Standard apply influences and
influences and to the design or hydrodynamic r
heya construction of changes; and x
enanges. prescribed (e) relevant planning ‘
tidal scheme
work; standards.
(b) if a relevant Refer to APPENDIX -
© planning EIGHT for Engineering .
scheme Certificate for the
standard is proposed
more _ stringent jetty/pontoon.
than any
standard
mentioned — in .
paragraph ”
(a} the
t relevant
planning
scheme .
standard, to
the extent it is
more stringent
. than the
standard
mentioned in
paragraph (a).
os Oo - os ot : Page20 -+: :
emanate ,* °° *Response to information Request. - 9 : an
LEGAL a. oy bee Sop gs oN ate
. : “ r ro : . ” &
te . aSection 25
ta gee - . . “¢ a - . ie Soya
+ ee
th ‘vs
RESPONSE TO INFORMATION REQUEST Fach *
$012.2 Prescribed tidal work | PS12.2 The design andj; PS12.2 Strand Gardens c
does not adversely construction of the submits the design and
affect the structural prescribed tidal work construction of the
integrity of any is consistent with |. prescribed tidal work
existing revetment or the following will not adversely affect
seawall or another standards— the structural integrity
existing structure. (a) subject to of any existing
revetment or seawall or
paragraph (b), any other — existin
prescribed : 9
: structure.in
tidal work, accordance with the
including any .
relevant planning
shore scheme standard
abutment, ,
piling or other
e} sre d It is noted the design
with the of the proposed works "
work- has _incorporated the -
existing stone st
(i) does - not reventment wall refer{| ~~ «,
place an to engineering ;
additional certificate — at ‘
load on APPENDIX EIGHT
any and plans at
existing APPENDIX SEVEN.
revetment
; or seawall
or another
existing
structure; 4
(ii) can be “
, structurall '
y a
@ supported ag
by an oh
existing 4
revetment
or
seawall
or
another
existing
' structure; -
_* (b) if a relevant
i planning °
scheme :
standard is
more stringent
than the
standard
mentioned — in
paragraph 4
a}—the ae
>
“ #
” _. r mes eon, : . oe : ia « ade -
emanate |; Response to Information Request 9 . ee!
y LEGAL | st vo . a & oO eo, ‘, 5Section 26
~
a
Ete .
RESPONSE TO INFORMATION REQUEST Fier a
: 4.
f 1
6
relevant -y
planning ‘
scheme
standard, to
the extent it is
more stringent
than the
standard
mentioned in
paragraph (a).
$012.3 Prescribed tidal work | PS12.3. The design and|PS12.3 Strand Gardens | . se
is designed and construction of the submits the design and | .- ~~
constructed in a way prescribed tidal work construction of the | _
to ensure it does not is consistent with the prescribed tidal work} °° >
} adversely affect the following will not adversely ae
stability of the bed standards— affect the stability of | ~"°“F
and banks of an ; the bed and banks of | 8%
tidal water. Y (a) subject to the Noosa River. Loe ard
paragraph (b), ..
prescribed tidal oy
work does not =
cause, by
changing the
flow of water,
the removal of,
or disturbance ‘
to, the :
sediment on , i
i. the bed and
: . banks of any a
tidal water; . m
(b) if a relevant -
; planning i
@ scheme wb. .
standard is Le
more stringent “ah meg
than the i vi
standard ; te
mentioned in ot i “ad
paragraph | “ st
(a}—the hes oe
relevant - . a
planning Sy pe I
. scheme moots
: standard, to co Tp Ng
, the extent it is Soe eyo
more stringent . ' wie
’ than the re
standard Tag
mentioned — in wt
paragraph (a). 3
- me iL
: _—— * ie , * *
©. - . Page 22 s 4
emanate Response to Information Request 4 # ta g
LEGAL . a oe
Jo oT. . wo. - oaSection 27
a
RESPONSE TO INFORMATION REQUEST FE Hh]
|
$012.4 Prescribed tidal work | PS12.4 The design and|PS12.4 = Strand Gardens ¥
is designed and construction of the submits that Australian *
constructed using prescribed tidal work Standard relevant to the ‘
materials having a is consistent with the materials, will be :
long life in marine following followed, or measures
environments, standards— will be taken to treat
having regard to their . materials used, for the
ability to resist the (a) subject h A jetty/ pontoon, to the
following— ea (0), extent the requirements
each stated in the Australian
(a) attack by Australian Standard appl
marine Standard . pply to
organisms; relevant to the jetty/pontoon that _'S
' materials _ that located in a marine
(b) corrosion; should be used, environment.
{c) deterioration or the
OQ resulting from measures that
abrasion or should be
immersion in taken to treat
seawater. materials "
used, for
structures, to
the extent the
requirements
stated in the
Standard apply
to structures
located in a
marine .
environment; va
(b) if a relevant “
planning ook
scheme .
standard is ‘
more _ stringent “
O than the a
standard ~
mentioned in
paragraph
(a}—the
relevant
planning
" scheme .
standard, _to oy
a the extent it is s
more stringent
than the
mL standard
mentioned in
paragraph (a).
$012.5 Prescribed tidal work | PS12.5 The design andj} PS12.5 Strand Gardens
is designed and construction of the submits that the
constructed in a wa prescribed tidal work prescribed tidal works
F
— © oe Page 23 ga
emanate _:" Response to Information Request 9 yo
LEGAL we ge ve og eo, Aye
- 4 £ . ia . . ~ whSection 28
a
Lott
RESPONSE TO INFORMATION REQUEST Fah re
to ensure it does not is consistent with will not affect an a
adversely affect the the following existing stormwater
operation or standards— outlet as there is no .
maintenance of any . existing stormwater
existing stormwater (a) subject h to outlet located near the
outlet. veccule (c), proposed works.
moored at
prescribed tidal
work do not
impede the
discharge of
stormwater;
{b) subject to
paragraph {c),
prescribed tidal
0 work does not
~ restrict access
to any ;
stormwater s
outlet;
{c) if a relevant
planning
scheme
standard is
more stringent
than the
standard
mentioned — in
paragraph (a) ae
or (b}—the boas
relevant ae
planning
scheme “we
standard, to the ve
oO extent it is
more stringent
than the
standard
mentioned in
paragraph (a)
or (b).
: $012.6 Prescribed tidal work | PS12.6 The design and|PS12.6 Strand Gardens a
os is designed and construction of the submits the prescribed .
.. constructed in a way prescribed tidal work tidal work will be
eo to ensure it does not is consistent with constructed in a way to
7 adversely affect the the following ensure no adverse
water quality of any standards— affect on the water
. tidal water, including, : quality of any tidal
in particular, as a (a) subject h Ae water will occur. The
result of— echo (6), following standards will
(a) release, into the Australian be complied with:
tidal water, of Standard e Relevant Australian
- materials used relevant to the standard; or
© _ we Doo me Page24 =, a
emanate ". Response to Information Request re
; LEGAL wt poe . oe ee
. * ne a « fo swe |Section 29
Ln aa r
RESPONSE TO INFORMATION REQUEST Fach .
:
in the design or Rel PI . +
construction of construction of * Relvanat Planning t
the work; or structures Scheme standard.
. under, within or
(b) disturbance to over tidal water,
the sediment on to the extent
the bed and
banks of the the .
tidal water; or requirements
’ stated in the
(c) exposure to Standard
acid sulphate are
soils. directed at
maintaining the
water quality of
tidal water;
O (b) if a relevant
planning
scheme
standard is
more stringent *
than the
standard
mentioned — in
paragraph
(a}the
relevant
planning
scheme
standard, to :
the extent it is oo
more stringent .
than the -
standard .
mentioned — in .:
O paragraph (a).
$012.7 ‘Prescribed tidal work | PS12.7_ The design and }PS12.7 Strand Gardens
is designed and construction of the submits prescribed
constructed in a way prescribed tidal work tida! work has been
to ensure it is safe is consistent with designed especially for
for persons standing the following the Land and been
or walking on the standards— certified by an s
. work. . appropriately certified vat
. (a) arora h fc) engineer to ensure Jf
me grap f safety for all persons .
any Stat during and after
ook on which construction (refer to
: a person may Engineer Certificate at
APPENDIX EIGHT)
stand or walk
. is-
(i) not
slippery 7
;_and
se © aed , Page25 —° # +
emanate - . * Response to Information Request
a ye * . *,Section 30
2
Fejna |
RESPONSE TO INFORMATION REQUEST PAE «
{ii) does not “
have any ;
feature !
that may
cause the
person to
trip or fall;
{b) subject to
paragraph (c),
any part of
prescribed
tidal work that
is unsafe for
persons
standing or
© walking on the
work is
surrounded by we
adequate 7 %,
barriers to ;
deter persons
from entering
the part;
(c) if a relevant
planning
scheme
standard is
more stringent "
than the 7
standard ve
mentioned — in s
paragraph (a) “
or (b)—the °
. relevant %y
© planning ..
scheme
standard, to
the extent it is
more stringent
than the
standard ;
mentioned — in :
paragraph (a) .
or (b). .
$012.8 Appropriate PS12.8 The design and|PS12.8 Strand Gardens
measures are taken construction of the submits the prescribed
for prescribed tidal prescribed tidal work tidal work is for private
work for a non- is consistent with use, therefore $012.8
private purpose to the following is not applicable.
ensure an standards—
unsupportable live . ;
r . (a) subject to
. load is not applied to paragraph (b), :
mo, © - 0. kg oO sO, . Page 26 ae OES
oe emanate . _, . ” Response to Information Request Sf
: LEGAL ee coe POM bas ” wet
. ° on . ‘loos ’ oeSection 31
Pajed ,
RESPONSE TO INFORMATION REQUEST FA tes
”
the work by persons prescribed tidal “y
or vehicles. work has 4
erected or “
placed in <
position on or
near the work,
a sign that-
(i) is visible ,
at all
times; "
and
(ii) states the
maximum
live load
that may
e be
applied to
the work, oo,
in terms of t
the
maximum
number of
persons
that may
be on the
work at :
any given «
time or te
the “ot
maximum a
° number om
: of iy
vehicles a
of a
particular .
@ type that 4
may be
on or
moored at
the work
at any
given °
: time; al
< (b) if a relevant a)
; planning :
a scheme :
: standard is
; more stringent
than the
standard
mentioned in
paragraph
(a}—the
relevant :
: -O. | a Page 27 wt
. ty emanate ' Response to Information Request S sod
. , ti 4 . a age oeSection 32
nn
PAG _
RESPONSE TO INFORMATION REQUEST FACE .
+
planning 42
scheme ‘s
standard, to .
the extent it is
more stringent
than the
standard
mentioned in
paragraph (a).
$012.9 Prescribed tidal | PS12.9 The design and|PS12.9 Strand Gardens
work, other than a construction of the submits the prescribed
boardwalk or an prescribed tidal work tidal work is for a
independent deck is consistent with jetty/pontoon not for
for a private purpose, each relevant non-maritime purposes
O is designed and planning scheme or in a canal $012.9
constructed in a way standard. does not apply. a
that ensures the use
of tidal water in a ‘
canal for a non- ;
maritime purpose is ‘
minimised.
$012.10 Prescribed tidal work | PS12.10 s 6(2) solution) PS12.10 Strand Gardens
that is a boardwalk or submits the prescribed
an independent deck The design and tidal work is not for a
: construction of the »
and for a_ private boardwalk or deck is boardwalk or an 2
purpose, is designed consistent with the independent deck, ‘
and - constructed in a followin therefore $012.10 is 48
way that ensures the stan dards not applicable. 4
use of tidal water in a t
canal for a non- (a) subject to 4
maritime purpose is paragraph (c), -
O minimised a boardwalk or ri
independent .
deck does not
extend more
than 3m from the
. waterfront
boundary of the
lot connected to 4
the boardwalk or ‘
(b) subject to ;
, paragraph (c),
' a_ boardwalk or
, independent .
deck is at least
3m inside of the
side boundary or
extended side
boundary of the
: Iot_connected to :
; o Lae Page28
emanate Response to Information Request oo
LEGAL : We. ge oYoc, 7 To,
ve e+e - tkSection 33
RESPONSE TO INFORMATION REQUEST ae
te - ¥ ts :
the boardwalk or ‘
{c) if a relevant
planning
scheme
standard is more
stingent than
the standard
mentioned in
paragraph (a) or
(b)}—the
relevant
planning
scheme
standard, to the
@ extent it is more
‘ stringent than
the standard -_
mentioned in
paragraph {a)
or (b).
$013.1 Prescribed tidal work | PS13.1 — (s 6(2) solution) PS$13.1 Strand Gardens
that is a private boat . submits that the
ramp or private slip re eof ane prescribed tidal work
way is designed and boat ramp or slip does not involve the
constructed in a way way is consistent construction of a boat
to ensure it is with the following ramp or private slip
structurally sound standards way, therefore SO13.1
‘while also ensuring is not applicable. oe
the top of each wall (a) subject to
at the edge of the paragraph (c),
boat ramp or slip way the walls at the .
is level with the edge of a boat
@ surface of the land ramp or slip “a
on which the boat way penetrate
ramp or slip way is into the earth at
located. least 600mm
below the
surface of the
land on which
the boat ramp ‘
or slip way is .
located;
4 (b) subject to
paragraph (c),
" the surface of a
boat ramp or
slip way is no
more than
200mm above
the
surface of the land
© y . - ot Page 29 "ae,
emanate Response to Information Request a, 8
LEGAL yo pe toro.
57 . rao, "Section 34
Tae, :
RESPONSE TO INFORMATION REQUEST geley :
on which it is .
located;
{c) if a relevant
planning
scheme
standard is
more stringent
than the
standard
mentioned in
paragraph (a)
or (b}—~the
relevant
planning
scheme
@ standard, to the
: extent it is
more stringent
than the wey
standard .
mentioned — in
paragraph (a)
or {b).
$013.2 Prescribed tidal work | PS13.2 —_ (s 6(2) solution) PS13.2. Refer to SO13.1.
that is a private boat .
ramp or private slip ee ne oF ang
way is designed and boat ramp or slip i
constructed in a way . . “
way is consistent . . .
to ensure the safe with the followin oe
movement of vehicles tandards— 9 oft
or persons over the s "4
boat ramp or slip (a) subject to nr
way. paragraph (d), . .
@ the upper "
surface of a
boat ramp or
slip way has a
width of no
less than i
3.6m; 3
(b) subject to BS
paragraph (qd), .
the whole a*
upper surface ros
of a boat ramp
or slip way is ,
treated to
prevent it from
becoming
slippery by .
using any of re
the following *
methods- .
© - Page 30. eet
emanate Response to Information Request cnr
LEGAL Se t woSection 35
' . .
Ltt:
RESPONSE TO INFORMATION REQUEST PAE :
i
(i) forming iy
grooves ik
over the ‘
surface, “9
as close 4
as 8
possible to 2
40mm 7
wide, i
20mm :
deep and
, 150mm
apart, and
at an
angle as
@ close as
possible to
70° to the o
centre-line es
of the boat py
ramp = or ‘o8
slip way:
(ii) covering
the
surface .
with a
substance sone
ordinarily _
used on 4:
slippery ‘5
surfaces ae
to prevent _*
skidding; te
(iii) making, weil
@ through a “1
physical
act, the
surface
coarse
before it :
sets, .
including, -.
. for ¥
example,
, by raking
> the
surface;
(c} subject to
paragraph (qd),
the upper
Surface of a
boat ramp or
slip way for *
, ©. be - my Sy Page 31 te a
emanate -Response to Information Request we
LEGAL ye \ FoR yt
= : . ; . Mos
” . eee, “ oakSection 36
fu
Pet:
RESPONSE TO INFORMATION REQUEST FRE ~
y r . . ee
*
which a winch
is not used to
hoist or haul ;
vessels onto ‘4
the boat ramp
or slip way is at
a gradient of
not steeper
than-
(i) if the
surface is
treated by
using a
method
mentione
@ d in
paragrap
h (b){i) or :
(ii)-1:8; or “
(ii) otherwi .
se-
41:10;
(d) if a relevant
planning
scheme
standard is
more stringent
than the
standard
mentioned — in vt
paragraph (a),
(b) or (c}—the .
relevant :
planning
@ scheme
standard, to
the extent it is
more stringent
than the
. standard
mentioned — in
YC paragraph (a), “
- (b) or (c).
5
ey $014.1 Prescribed tidal work | PS14.1. The design and | PS14.1 Strand Gardens
that is a bridge does construction of the submits the prescribed
not adversely affect bridge, including tidal work is not for the
-* existing public use of any abutment construction of a
any tidal water, connected with the bridge, therefore
: including, for bridge, is consistent $014.1 is not
example, use of the with the following applicable.
: tidal water for standards— .
canoeing, swimming :
oy © . Se ” Page 32 i
oo, emanate | . .. *Response to:Information Request my
‘ LEGAL * woe rr. foo oe ‘ tof
3. fH OS, mw 3 a aSection 37
a af
to “4
RESPONSE TO INFORMATION REQUEST Fach -
5
oF oe recreational (a) subject to 8
. paragraph (b),
the clearance
levels under a
bridge are high
enough to
allow
continued
public use of
any tidal water ooo
over which it is tat
constructed; fo
(b) if a relevant
planning .,
scheme ;
@ standard is ~ sit
more _ stringent et
than the Sy TS
standard ow eth
mentioned in -
paragraph :
(a}the
relevant
planning
scheme
standard, to
the extent it is
more stringent
than the ”
standard
mentioned in Oy
paragraph (a). ae
@ $014.2 Prescribed tidal work | PS14.2. The design and|PS14.2 Refer toSO14.1. ;
that is a bridge does construction of the ra
not adversely affect bridge is consistent
the flow of water with the following
under the bridge. standards—
(a) subject to
paragraph '
(b}— 7
(i) if a bridge ‘4
“ can be -
. adequately
os, supported
. without
a erecting or
placing a
; foundation
support in .
: tidal :
water—no
. dl
. 7
“ © =: . Yop. Oe Ts Page 33 ne
: emanate oe Re inn Ras -
’ ‘UegaL t,o whe im ‘Response to Information Request — ot
a a ae rr aSection 38
ory r
; ob
re} .
RESPONSE TO INFORMATION REQUEST Fach cal
4
J
foundation aoe
support to ve :
support the “ . :
bridge _is t
erected or oy
placed in
the tidal
water; or <
(ii) otherwise—
only the
minimum
number of
foundation
supports
required to
@ support the
bridge is :
used; oe 4
(b) if a relevant oe
planning CN
scheme °
standard is
more stringent
than the
standard
mentioned _ in
paragraph
(a}—the of
relevant .
planning Lo
scheme ta
standard, to oo
the extent it is _
more stringent oy
@ than the "ty
standard sO
mentioned — in
paragraph (a).
$015.1 Prescribed tidal work | PS15.1 —_ (s 6(2) solution) PS15.1 Refer to SO12.10.
that is a boardwalk The design and .
or an independent construction of the 3
deck and for a private boardwalk or deck is
*e . purpose is designed consistent with the
and constructed in a following
way to ensure it is standards—
able to support its
intended loads, (a) subject to
having regard to its paragraph
relevant loading (d), a ,
matters boardwalk or
independent a
deck a
7 Oe A. ne Page 34. tng
emanate. Response to Information Request os
LEGAL . : ne a . .
' 2, : Se, .Section 39
¥ . , ; .
Pett ——
RESPONSE TO INFORMATION REQUEST FEE
-
accessible to ‘r
vehicular traffic
is able to
support at
least a_ live
load of 3.0kPa
plus an axle
load of 101N;
{b) subject to
paragraph
({d), a
boardwalk — or
independent
deck that is not
accessible to
@ vehicular traffic
and that is for
individual! use is a
able to support Sy -
at least a live ra
load of Me,
2.0kPa; ik
(c} subject to
paragraph
(d), a
boardwalk — or
independent
deck that is not
accessible to ,
vehicular _ traffic
and that is for 2
group use is a
able to support Lon
at least a live
@ load of “ot
3.0kPa; ”
(d) if a relevant
planning
scheme
standard is
more _ stringent
than the ;
standard %
mentioned — in -
* paragraph (a), :
(b) or (c)~the ~
relevant
planning
scheme
standard, to
the extent it is
more stringent :
than the .
standard _—
° - ©! -. , ee, Page 35 oo
SOF emanate 1» Response to Information Request SBT
LEGAL - * i wea tn
ed . ~~ + ijSection 40
HI "
RESPONSE TO INFORMATION REQUEST FAA
mentioned — in
paragraph (a),
(b) or (c).
$015.2 Prescribed tidal work | PS15.2 _(s 6(2) solution) PS15.2 Refer to $012.10.
thats a The design of
boardwalk or an construction of the
independent deck boardwalk or deck is
and for a non-private consistent with the
purpose is designed following
and constructed in a standards—
way to {a) subject to
ensure it is able to paragraph (c),
—_ support its a boardwalk
@ intended loads, nde endent .
having regard to its dock. . ~
relevant loading | _- accessible to oe nO
matters. vehicular traffic 7
is able to
support at
least the
following-
(i) a distributed
live load of
5.01cPa;
(ii) a —_
concentrate a
d live load of a
4.5kN; oo
(iii)the load of bo
‘ the largest Pk
@ vehicle
capable of .
being on
the
boardwalk
or deck;
(b) subject to 3
paragraph (c), aN
a boardwalk or ob.
independent
. deck not
. accessible to
vehicular traffic
; is able to
support at
least the
following- .
i) a distributed
©. +... ' Fo Co Page36 eae
emanate . * Response to Information Request ° mo
ioe ra] ; - . so,
Ye . * . * . 4 beeSection 41
Ere] *
RESPONSE TO INFORMATION REQUEST Fach *
live load of ;
5.0kPa; ‘
(ii) a
concentrate
d live load of
4.5kN;
(c) if a relevant
planning
scheme
standard is
more stringent
than the
standard
mentioned — in
' paragraph (a)
@ or (b)the
relevant
planning
scheme ,
standard, to the
extent it is
more stringent
than the
standard
mentioned _ in
paragraph (a)
or (b).
$015.3 Prescribed tidal work | PS15.3. The design and|PS15.3 Refer to $012.10. *,
that is a boardwalk or construction of the "
an independent deck boardwalk or deck is
does not prevent or consistent with the
hinder remedial work following
© being undertaken on standards—
any bank of tidal water .
or for any existing (a) subject h to
retaining -wall, (b), a
revetment or seawall boardwalk or
or another existing independent
structure. deck either—
(i) can be a
; easily .
dismantled
and
reassemble
d; or
(ii) does not
restrict the
movement
of
machinery
ordinaril
. © ‘ - ode ‘ “ a a Pa e 37 f .
emanate ~*~. Response to Information Request 9 :
. LEGAL a re - .
* - . . Any .Section 42
t" » ¢ ” : .
ran :
RESPONSE TO INFORMATION REQUEST FUP “
.
used for 7
remedial '
work to any
bank of tidal ~
water or
any existing
retaining
wall,
revetment ;
or seawall
or other
existing
structure;
(b) if a relevant
planning
e scheme
standard is
more stringent
than the 7
standard
mentioned in
paragraph
(a)—the
relevant
planning
scheme
standard, to the
extent it is more :
stringent than
the standard 2
$016.1 Prescribed tidal work | PS16.1 = (s 6(2) solution) PS16.1 Strand Gardens
that is a jetty or pier ‘ submits the prescribed
and: for a_ private rn re of an tidal work has been
@ purpose is designed ‘etty or pier is designed in :
and constructed in a , ons stent with the accordance with
way to ensure it is following engineering standards
able to support its standards— and will support the
intended loads, intended loads as
having regard to its (a) subject to defined by the
relevant loading paragraph (d), appropriate standard
matters. a jetty or pier {refer to Engineering
accessible to Certificate at ;
vehicular _ traffic APPENDIX EIGHT). os.
is able to
support at least
a live load of
3.01(17a plus
an axle load of
101N;
{b) subject to
paragraph (qd),
a jetty or pier
that is not
© ao re Page .38 ag
. emanate — _ Response to Information Request stg ow Re
LEGAL . i Pe tg . ah,
. ” a * _ ° Pa ‘ - aSection 43
"ee ae Tae eM ae
a a
Fajod .
RESPONSE TO INFORMATION REQUEST Foch ;
>
.
accessible to ¥
vehicular rt
traffic and that -
is for individual
use is able to
support at least
a live load of
2.01cPa;
(c) subject to
paragraph (qd), oR
a jetty or pier : Lge
that is not Sa
accessible to ea
vehicular ; ‘
traffic and that
oO is for group
use is able to gg
support at least oe
a live load of # ete ek
3.0kPa; aera
7 sot hy
(d) if a relevant ee
planning ,
scheme
standard is
more — stringent
than the
standard
mentioned — in
paragraph (a),
(b) or (c}—the . os
relevant See
: planning 4a. #
scheme rcs
standard, to od
the extent it is an
O more stringent a ME
than the | eRe .
standard .
mentioned — in
paragraph (a),
(b) or (c). '
$016.2 Prescribed tidal work | PS16.2 = (s 6(2) solution) PS16.2 Strand Gardens |
, that is a jetty or pier . submits the prescribed 8
mo and for a non-private The tr assign f ane tidal work is not for +t
aa purpose is designed cons “ on or e commercial use, a,
and constructed in a Oo WY stent end the therefore SO16.2_ is
way to ensure it is following not applicable.
able to support its standards—
; intended loads,
; having regard to its (a) subject to
. relevant loading paragraph (c),
! matters. a jetty or pier ;
_- accessible __ to a
: : A ote
4 ©: yuu yt ‘A . Page39 °°. sx
. emanate _- Response to Information Request a
oo CEGAL Log mg oe - 2 O
' * ‘ fCSection 44
- ” ¢ oa . .
Pte 4
RESPONSE TO INFORMATION REQUEST FIED a)
ws
r,
vehicular traffic }
is able to te
support at :
least the
following-
(i) a distributed
live load of
5.0kPa;
(ii)a oo,
concentrate . ke
d live load of oe.
4.5KN; a * -
{iii)the toad of oo
the largest
@ vehicle Hg
capable of “at
being on or ge
moored at - ;
the jetty or oh
pier;
(b) subject to
paragraph (c),
a jetty or pier
not accessible
to —_- vehicular
traffic is able to
support at least Pr
the following- rer
(i) a distributed eo
live toad of Ny
5.0kPa; ae
(ii) a Op
@ concentrate vo
d live load of eg
4.5kN;
(c) if a relevant
planning
scheme
standard is ie
more stringent -
, than the &
* standard *
mentioned in a
paragraph (a)
or (b}—the
relevant
planning
scheme
standard, to the
extent it is .
more stringent fa
© oy Page 40 oS
emanate | -, Response to Information Request (ae Ae
; LEGAL © Bg i ne +
oo : ‘ a oy Le _* wk . ay .%Section 45
a
r
RESPONSE TO INFORMATION REQUEST Fac ’
|
than the ‘
standard om
mentioned = in
paragraph (a)
or (b).
$016.3 Prescribed tidal work | PS16.3. The design and|PS16.3 Strand Garden submits
that is a jetty or a pier constuction of the the prescribed _ tidal
is designed and jetty or pier is work has been
constructed in a way consistent with the designed and certified
to ensure it remains following by an appropriately
above water at all standards— qualified engineer so
times. . that the jetty is above
(a) subject h to the water on highest
@ (b), either. astronomical tide.
(i) the level of
the deck of .
a jetty or ‘
pier is at
least
300mm
above the
water at
highest
astronomic
al tide; or
(ii) piles or
other 4
markers
indicate the .
presence of cos
the jetty or ‘
pier when it 4
© is ”
inundated; -
(b) if a relevant
planning
scheme
standard is
more stringent '
_ than the
standard m
: mentioned — in
paragraph
(a}the
relevant
planning
scheme
standard, to
the extent it is
more stringent ;
than the :
. 4
”
; ° © . Page 41 .
emanate Response to Information Request a
LEGAL . ‘ : co
_ ‘hodSection 46
. a s:
Gl .
RESPONSE TO INFORMATION REQUEST FEE
standard .
mentioned in
paragraph (a).
$016.4 Prescribed tidal work | PS16.4 = (s 6(2) solution) PS16.4 Strand Gardens
that is a jetty or pier . submits the prescribed
and for a_ private ree ee ot ane tidal work has been
purpose is designed ‘etty or ier is designed to
and constructed in a ‘ orsistent oon the complement the
way to ensure it is of following adjacent house whilst
a size suitable for standards— being mindfall of the
maritime use while amount of tidal water
still minimising the (a) subject to occupied.
amount of _ tidal paragraph (b), It is noted the jetty
O water occupied by it. ances siatty width is 1.5m wide and
or pier have a does not exceed the
width of at recommended 3m in|. i
the policy . So EG
least 900mm / sot es
and not more Refer to MSQ approval oA a
than 3m; at APPENDIX ONE. “3
(b) if a_ relevant
planning
scheme
standard is
more _ stringent
than the
standard
mentioned — in
paragraph
(a}—the
relevant
planning
scheme a
O standard, to oS
the extent it is .
more stringent
than the
standard
mentioned in
paragraph (a).
7 $017.1 The design and |PS17.1 (s6(2)solution) PS17.1 = Strand Gardens 7
. construction of The design and submits the prescribed :
prescribed tidal work construction of the tidal work is not for a
that is a pipeline, or ineli pipeline or any
another nd Ine d OF underground _ service,
underground service S consistent with therefore SOQ17.1 is
used instead of a the followin not applicable.
pipeline, does not g
adversely affect the standards—
ability of vessels to .
be anchored near the (a) subject to
© co Page 42 oS
emanate Response to Information Request batSection 47
aR ;
RESPONSE TO INFORMATION REQUEST getag
work. paragraph (b),
a pipeline or
other
underground
service is
installed at
least 1.2m
below the
surface of land,
after it is
installed;
(b) if a relevant
planning
scheme
standard is
@ more _ stringent
than the ;
standard mo
mentioned — in oak
paragraph oT
(a}-the Yo
relevant ee
planning oN
scheme .
standard, _to
the extent it is
more stringent
than the
standard
mentioned — in
paragraph (a).
$018.1 Prescribed tidal work | PS18.1 — (s 6(2) solution) PS18.1 Strand Gardens
that is a pontoon, for . submits the prescribed 4
@ a private purpose, wee eee ot ane tidal work for a -
and not used only for ontoon is consistent pontoon has been 4
rowing, is designed th the followi designed to support
and constructed in a stan dar. ic owing the intended loads
way to ensure it is being for private use.
able to support its (a) subject to
intended loads, paragraph (c), .
having regard to its a pontoon for we
relevant loading individual use is ay
matters. able to support -
a at least a live -
: load of 1.5kPa;
(b} subject to
paragraph (e),
a pontoon for
group use is
able to support
at least a live
load of
2.0kPa; "
© moa, rr Page 43 é
emanate .. * Response to Information Request re
a ee otSection 48
| te
a :
ett “4
RESPONSE TO INFORMATION REQUEST och x
ae
(c) if a relevant x
planning
scheme
standard is
more stringent
than the
standard
mentioned — in
paragraph (a)
or (b}—the
relevant
planning
scheme
standard, to the
extent it is
© more stringent
than the
standard
mentioned in
paragraph (a)
or (b).
$018.2 Prescribed tidal work | PS18.2 —_ (s 6(2) solution) PS$18.2 = Strand Gardens
that is a pontoon, for . submits the prescribed
a non-private purpose, ne ae of ane tidal works for a
and not used only for ontoon is consistent pontoon is for private
rowing, is designed th the _followi use, therefore $018.2
and constructed in a wl e following is not applicable.
; a: standards—
way to ensure it is ’
able to support its (a) subject to
intended loads, paragraph (c), a -
having regard to its pontoon open ;
relevant loading for use by the
matters. general public
O or used for a ‘
commercial!
purpose is able
to support at
least the
following-
(i) a distributed
live load of .
301(1°a
(ii) a *
concentrated
live load of
4.5kN;
(b) subject to
paragraph (c), a
, pontoon — other
than a pontoon
mentioned —_ in
TT re
© - be So Page44 2.
emanate . _ Response to Information Request (a
LEGAL , “os .. an eo OW
Lo #. a .Section 49
fog
a
aa .
RESPONSE TO INFORMATION REQUEST Fa
paragraph (a)
is able to .
support at
least the
following-
(i} a distributed
live load of
2.0kPa;
(i) a
concentrated
live load of
4.5kN;
(c) if a relevant
planning
@ scheme
: standard is e an
more — stringent peer gy
than the s Ror g
standard Poo ge
mentioned — in - se
paragraph (a) or *
(b)}—-the
relevant
planning
scheme
standard, to the
extent it is more
stringent than .
the standard ek
mentioned — in a
paragraph (a) Sai
or (b). ty
® $018.3 Prescribed tidal work | PS18.3 _ (s 6(2) solution) PS18.3 Strand Gardens 2
that is a pontoon and . submits the prescribed 7
used only for rowing The ao ane tidal work for a
is designed and . . pontoon is not soley
: pontoon is consistent .
constructed in a way with the following for rowing, therefore
to ensure— standards— $018.3 is not
ao: applicable.
(a) it 5 able to (a) subject to
Suppo its 7
+ intended loads, paragraph ic. ,
having regard to walkway of a *
its relevant pontoon used
loading matters; only for rowing
and is able to
(b) it is safe for support at least
persons —_ using a live load of
the pontoon to 3.0kPa;
launch and .
retrieve rowing (b) the floatation
vessels. unit of a
© oe Page 45 “
emanate “. .Response to Information Request .
LEGAL | nyiet oye ba, Lath:
- a og oe . ae
tea i,Section 50
Prey a
RESPONSE TO INFORMATION REQUEST FAC
|
pontoon used .
only for rowing
is able to
support at
least a_ live
load of
1.5kPa;
(c) if a relevant
planning
scheme
standard is
more stringent
than the
standard
mentioned — in
paragraph (a)
@ or (b} the
relevant ’ a,
planning omen: —
scheme De a
standard, to the eo
extent it is 7
more stringent
than the
standard
mentioned in
paragraph (a)
or (b)
$018.4 Prescribed tidal | PS18.4 = (s 6(2) solution) PS18.4 Strand Gardens
work that is a : submits access to the
pontoon is designed re rect of ane pontoon is via_ stairs
and constructed in a : . {refer to APPENDIX
pontoon is consistent
way to ensure any with the following SEVEN)
@ load applied to the standards— a
pontoon by a person of
or thing on the (a) subject to The pontoon has been /
pontoon does not paragraph (f), designed and will be
cause the pontoon to a pontoon's constructed so that the an
tip over or tilt to a access pontoon
degree causing the walkway accommodates the ote
person or thing to fall extends at intended loads and Try
off the pontoon. least 500rnm ensures stability | 9 fo...
onto the through its floatation an
pontoon's device to avoid any ato
floatation unit; tilting that may cause 7
. persons or material to
(5) areaph to fall off the pontoon.
(f), a
pontoon's
access
walkway is .
constructed :
with a material Oe
© . Page 46 . 7. OF
emanate - Response to Information Request Qoot,
LEGAL wee e- ot ‘. aosSection 51
Ltr. ,
RESPONSE TO INFORMATION REQUEST Fach
|
that has a
non-slippery
surface;
(c) for a pontoon
used only for
rowing—
subject to
paragraph {(f),
at least 75mm
of the height
of the
pontoon's
floatation unit
remains
above the
water over
@ which it is ;
constructed if a ;
distributed live ev
load is applied
to half of the
surface of the
pontoon's
floatation unit
and all of the
surface of the
pontoon's
access
walkways;
(d) for a pontoon ie
other than a oy .
pontoon ey
mentioned — in uh
, paragraph a 4 ‘
“ (c)}—subject ak “
@ to paragraph :
(f), the top oF ae
surface of the ys
pontoon's as 5
floatation unit mo
remains tn j
above the a
water over tt
‘ which it is - gee
constructed _ if oe
: a__ distributed Ty
live load of oo
1.5kPa is
applied to half
of the surface
of the
pontoon's
floatation unit
and all of the
surface of the a
© Page 47 2
. , emanate Response to Information Request oy gene
. a vo . ‘ 7 Miagt
Reo ° . . “ .f . * aeSection 52
AG ‘
RESPONSE TO INFORMATION REQUEST Fac
pontoon's
access
walkways;
(e) subject to
paragraph (f),
the whole base
of the pontoon's
floatation —_ unit
remains in
contact with
the water over
which it is
constructed at
all times and
tits no more
than 15° at
@ any time; ; .
(f) if a relevant Ss
planning Set
scheme ct
standard is .
more stringent
than the
standard
mentioned _ in
paragraph (a),
(b), {c), (d) or
(e} the
relevant
planning
- scheme 4
standard, to a.
the extent it is a
more stringent r
than the aay
. @ standard a
mentioned in my
paragraph (a), . op
(b), (c), (d) or an
(e). “om [
. $018.5 Prescribed tidal work | PS18.5 The design and|PS18.5 Strand Gardens er
that is a pontoon is construction of the submits the prescribed af
designed and pontoon is consistent tidal work for a] — —
constructed in a way with the — following pontoon has been a
to ensure it remains standards— designed accordingly
above the water at . so that it remains no
all times. (a) subject h to less than 300mm above
(ib). the the water at high water
' \ mark at all times (refer
pontoons to APPENDIX SEVEN)
abutment is
located no less
than 300mm .
© Page 48 wot
emanate Response to:Information Request SAS
. . nae oh 3Section 53
Fajet
RESPONSE TO INFORMATION REQUEST FACr _ 3
above the water .
at high water
mark;
(b) if a relevant
planning
scheme
standard is
more stringent
than the
standard
mentioned — in
paragraph
(a}—the
relevant
planning .
scheme .
O standard, to tt
the extent it is ee ae
more stringent oe
than the pa oe
standard Oe
mentioned — in * os hy
paragraph (a).
$018.6 Prescribed tidal work | PS18.6 The design and |PS18.6 Strand Gardens
that is a pontoon is construction of the submits the prescribed
designed and pontoon is consistent tidal work for a
constructed in a way with the following pontoon has been
to ensure the standards— designed to ensure
pontoon's floatation that the floatation unit
unit will rise and fall 8) Or tod ner rises and falls with the
to allow for changes Ocaled In an changes in tidal water
in tidal water levels area prone to levels
flooding— ,
subject to ; "
O paragraph (c), o
the pontoon's
floatation unit
” is moored by
piles;
(b) for a pontoon
other than a a
pontoon rd
mentioned — in
paragraph :
(a)—subject to
paragraph (c),
the pontoon's
floatation unit
is-
(i) attached,
through the 2
pontoon’'s n,
system _ for *
CC 0 Io Pa 8
© . oo ne ,Page4Q 2 84
. . oeMmanate. . | .- ~:. Response to Information Request Lo ee,
REGAL oS - oe rot mR
Dee . Toe an - - "Ley moe, 7 coe +, I ‘tsSection 54
AR
RESPONSE TO INFORMATION REQUEST gatag
mooring the
unit, to
concrete
anchors in
the bank
landward
of the
pontoon; or
(ii) moored
by piles; 6 ;
(c) if a relevant oat
planning so
scheme
standard is
more. stringent
@ than the
standard ty
mentioned — in WO ats
paragraph (a) et
or (b)}—the relevant we TY
planning scheme ‘a aed
standard, to the 4
extent it is more Ah
stringent than the
standard mentioned
in paragraph (a) or
(b).
$019.1 Prescribed tidal | PS19.1 = (s 6(2) solution) PS19.1 Strand Gardens
work that is a The design and submits the prescribed
retaining wall, construction of the tidal work is not for a .
revetment or retaining wall retaining wall
seawall, is designed revetment or seawall revetment or seawall, .*
@ and constructed in a is consistent with therefore SO19.1_ is -
way to ensure it is the following not applicable. *
able to support its standards— TH,
intended loads,
having regard to its (a) subject to
relevant loading paragraph (b), a
. matters retaining wall,
s revetment — or
seawall is able ra
to support at ,
least a 7
distributed live
load of 3.0kPa;
, (b) if a relevant
planning
scheme
standard is .
more stringent os
than the 2
“A
. oo
ss ——S SS 2 a
© Page 50 — AF
emanate . Response to Information Request OG
oy ® Coo woe : a,Section 55
TEE
RESPONSE TO INFORMATION REQUEST jatag
RR . a . : . ~ Po om. .
standard
mentioned — in
paragraph
(a}—the
relevant
planning
scheme
standard, to
the extent it is
more stringent
than the
standard
mentioned in
paragraph (a).
@ $019.2 Prescribed tidal | PS19.2 —_(s 6(2) solution) PS19.2 Refer to SO19.1.
wor that is i The design and
fe vet ent en construction of the a
: . retaining wall, ee
seawall, is designed revetment or seawall Be
and constructed in a is consistent with mt
way to ensure it can the following
withstand— standards—
(a) any tendency of (a) subject to
Sliding. avd or paragraph (c), a
’ retaining wall,
(b) any other effects revetment or
of waves of seawall has a
changes in water factor of safety :
levels on the of no less than a
retaining wall, 1.5;
revetment or (b) subject to a
seawal. paragraph (c), a
@ retaining wall, fm
revetment = or ae
seawall is able =
to withstand
the effect of
waves, or
waves and
water levels,
resulting from
: a storm or ‘
other natural ;
event of a
magnitude
that has a 2%
or lower
probability — of
occurring — in
any calendar
year;
c) if a_ relevant
© . Page 51 ng
emanate » Response to Information Request re
: "3 a - cf. ~~The text continues on section 56.