001A333D.001

of 114

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

a.                                                             ,                    AN.                    ,
                                                                                        _
               168 FLINDERS STREET EAST                                                    in
               TOWNSVILLE OLO 4870                                                          ‘
               PO BOX 1984                                                                   7
               TOWNSVILLE OLO 4810                                                            ‘
               P (07) 4727 0100
               F (07) 47270156                                                                          or
 emanate _       [email protected]                                                                  1S    |
       LEGAL
            Our Ref:  PRC:KMG:080471:0325.01
            Your Ref: 2008/1704                                                       a
            25 March 2009                                                         aS A           ON
                                                                          (=) RECEIVED |
            Sunshine Coast Regional Council                                         3,0 MAR 2009     3
            Planning and Development Services                                                            3
            PO Box 141                                                                SCcRC
            TEWANTIN QLD 4565                                                      —  Tewantin
            Attention: Denis Wallace                                            Corey

             Development: 30 Noosa Parade, by Strand Gardens Pty Ltd ACN 010 334 031 as
            trustee (Strand Gardens)
             Development Application: Operational Works Application for Prescribed Tidal Works
             (Development Application)
             Lot 14 Crown Plan N21842 (Land)

             We act for Strand Gardens.
             Response to Information Request
             Enclosed is Strand Gardens, Response to the Information Request issued by the Sunshine
             Coast Regional Council (Council) on the 15 January 2009.
             This response follows the order of matters raised in the Information Request.
             This response is provided in accordance with section 3.3.8(1 )(a)' of the Integrated Planning
             Act 1997 (IPA).
             Assessment of Application
             To avoid any doubt, we advise that Strand Gardens will not be providing any further                    ;
             information in relation to the Information Request, accordingly this letter also serves as a           t
             notice under section 3.3.8(1)(c)? of the IPA.                   .                                    af
             In this regard, Strand Gardens request that the Council now proceed with the assessment of           i: ;
             the Development Application.                                                                         sof

             ' 3.3.8 (1) If the applicant receives an information request from the assessment manager or a concurrence agency (the mo
             requesting authority), the applicant must respond by giving the requesting authority—
             (2) all of the information requested:
               3.3.8(1) If the applicant receives an information request from the assessment manager or a concurrence agency (the
             requesting authority), the applicant must respond by giving the requesting authority—
              (c) a notice—
             {i) stating that the applicant does not intend to supply any of the information requested; and
             (ii) asking the requesting authority to proceed with the assessment of the application.
                                                                        .                                           j
                                                                                      ;                             a
Full text of sections 2 to 55 (of 114)

Section 2

Sunshine Coast Regional Council                                          Emanaie Legal    i oi
Planning and Development Services                                        25 March 2009     ={=
Attention: Denise Wallace                                                       Page 2    i my
PRC:KMG:08047 1:0325.01

Should you wish to discuss the foregoing, please do not hesitate to contact Peter Cardiff at
your convenience.
Yours faithfuily

Writer:  Peter Cardiff
Direct:  47270100
Email:   [email protected]

                                                                                                        sa
                                                                                                       ye
                                                                                                       :
                                                                                                       “

                                                                                                        a

Section 3

mea     —
        TOWNSVILLE QLD 4810          FA a)

                  Strand Gardens Pty Ltd
              ACN 010 334 031 as trustee

        Response to Information Request

             Development Application for
   Operational Works for Prescribed Tidal
                                  Works

          30 Noosa Parade, Noosa Heads
             Lot 14 on Crown Plan N2184e

                                 PRC:KMG:080471

Section 4

168 Flinders Street East                                                   -
                             TOWNSVILLE QLD 4810                                                         .
                             TOWNSVILLE QLD 4810                                          Ha             *
                             PO BOX 1984                                                   ood)
           emanate           P (07) 4727 0100                                                             i
                   LEGAL     F (07) 4727 0150
                             E [email protected]                                            .

  ‘@                                                                                                os

                                       STRAND GARDENS PTY LTD
                                      ACN 010 334 031 AS TRUSTEE
                                                  ,                                                      3
                                  RESPONSE TO INFORMATION REQUEST

   @                  DEVELOPMENT APPLICATION FOR OPERATIONAL WORKS FOR                        le * “
                                       PRESCRIBED TIDAL WORKS                                       gh

                                       30 NOOSA PARADE, NOOSA                                          a
                                       LOT 14 CROWN PLAN N21842                                       : t -
.                                          OUR REF: PRC:KMG:080471                                    . 7 |
   ,                                            25 March 2009                                            0

,       ,                                                                                             *. .

                                                 "} oe . . *  o . ,                                       +

Section 5

scores BB
                                                   TABLE OF CONTENTS  PO
         TABLE OF CONTENTS                                                      oy
         A.   DEFINITIONS                                              2
         B.   BACKGROUND                                                3
         C.   SUNSHINE COAST REGIONAL COUNCIL REQUIREMENTS             4
         1.   AMENDMENT TO PLANS                                       4
         2.   ASSESSMENT AGAINST REVELANT SPECFIC OUTCOMES              6
  @      3.   ENGINEERING CERTIFICATION                               56
         4.   CONFIGURATION                                           57

         APPENDICIES

         APPENDIX ONE:       MARITIME SAFETY QUEENSLAND APPROVAL                .
         APPENDIX TWO        ENVIRONMENTAL PROTECTION AGENCY APPROVAL          : _ ”
         APPENDIXC THREE     CORRESPONDENCE FROM SUNSHINE COAST REGIONAL      cee
                      :      COUNCIL                                             a
         APPENDIX FOUR        INFORMATION REQUEST — SUNSHINE COAST REGIONAL      ;
   @                         COUNCIL                                             %
          APPENDIX FIVE       VISUAL AMENITY REPORT - LVO ARCHITECTURE            -
          APPENDIX SIX       ORIGINAL DEVELOPMENT PLANS
|         APPEDIX SEVEN       UPDATED DEVELOPMENT PLANS
oe        APPENDIX EIGHT      ENGINEERING CERTIFCATION                           a

   eo     © smanate                        ae    :                  Page 1
               LEBAL          Response to Information Request .   ,  a           -
                                               A ‘            ?   o : -          \

Section 6

.      P,     “Fa    ye                                      a

                                                              |                              Eh              |
                                                                             DEFINITIONS    Poh               i

            A.     DEFINITIONS                                                                                |
            In this Response to the Information Request unless otherwise provided or unless the subject
            matter is inconsistent therewith the expressions following (whether appearing with or without
            capital letters) shall have the meanings hereinafter respectively assigned to them.
            “Council” means Sunshine Coast Regional Council;
            “Development” means the proposed Prescribed Tidal Works -— Transport 5 — Domenstic
            Marine Use (Jetty);
            “Development Application” means the Development Application. Submitted to Council in
            November 2008, Council reference: 2008/1704;
            “EPA” means Environmental! Protection Agency;
   ®        “IPA” means /ntegrated Planning Act 1997;                                    ,
            “Land” means the property at 30 Noosa Road, Noosa Heads more formally known as, Lot
            14 on N21842 title reference: 15798246;
            “MSQ” means Maritime Safety Queensland;
            “Planning Scheme” means the Noosa Planning Scheme: The Noosa Plan;
            “Policy” means Noosa Planning Scheme Policy 4 - Domestic Marine Uses outside of the
            Noosa Waters Estate;                                                                             -
            “Response to Information      Request”   means this document and any schedules,            -  be
            appendixes or attachments herewith; and                                                         ,
            “Strand Gardens” means Strand Gardens Pty Ltd ACN 010 334 031 as Trustee, the              ,      :
            applicant for the Development Application and the registered owner of the Land.
   @                                                                                                       -

                                                                                                            +

                                                                                                             4

:                    TT                               >a                                              og
 eh                                                   ws                                   Page2
      nd       emanate                  Response to Information Request                          _     “eg
bo,                    a                            _*.                                                    Os

Section 7

ot!              ,
                                                                         BACKGROUND        Ber              4

         B.     BACKGROUND                                                                                 :
         °      Maritime  Safety  Queensland   as  concurrence   agency  for  the  Development            -
                Application, issued Water Allocation Area approval for the prescribed tidal works on
                15 October 2008 a copy is attached at APPENDIX ONE;
         °      EPA as concurrence agency for the Development Application issued a Resources
                Entitlement on 21 Novemeber 2008 a copy is attached at APPENDIX TWO;
         °      Strand Gardens lodged the Development Application with Council on 28 November
                2008;
         °      Council issued an Acknowledgement Notice on 12 December 2008;                         mo
         °      The following agencies were identified in the Acknowledgement Notice as a referral    ,
@               agency for the Development Application:                                                    ,
                °      EPA as concurrence agency — requiring Resource Entitlement Approval              a
                °      MSQ as concurrence agency - requiring Water Allocation Area Approval           :  a
                                                                                                        sgl,
         °      Council confirmed via electronic correspondence (email) that referral was not
                necessary on the 17 December 2008 as both agencies had responded in advance, a             ?
                copy of the email is attached at APPENDIX THREE;                                          ae
         e      Council issued an Information Request on 15 January 2009, a copy is attached at          ”
                APPENDIX FOUR;                                                                         eel
                                                                                                      ee
         This document is in response to Council’s Information Request.                               we   a
                                                                                                        ot,
         The document is set up so that each request is reproduced in italics with a response          aa .
          immediately following each request item.                                                      tay
e                                                                                                    .   A

                                                                                                         -
                                                                                                        . ay ;

                                                                                                       ‘ ‘ d,

,                                                                                                          2

          ©           a                 cee                                              Page 3        oy
            emanate       Me       _. Response to Information Request                                   ae

Section 8

ote                |
                                                        RESPONSE TO INFORMATION REQUEST             Fo                 ,
                                                                                                                        i
             C.     SUNSHINE COAST REGIONAL COUNCIL REQUIREMENTS
             1.      AMENDMENT TO PLANS

              1,   The proposal in its current form is considered excessive in the size, visual bulk and
                   number of structures proposed and is unlikely to be supported. Please submit amended
                   plans indicating:
                   1.7,     Removal of the regatta stairs which are not considered necessary to provide
                            access to a vessel, given that a separate jetty/pontoon is sought.
                   1.2.     A reduction in the size of the pontoon to comply with Council's Planning
                            Scheme Policy PSP4 - Domestic Marine Uses Outside of Noose [email protected].     An amended jetty structure indicating either:                                              .
                                                                                                                   a.
                            1.3.1.   Provision of a standard gangway to provide access to the pontoon to              ngs
                                     reduce the visual bulk of the sfructures; or                                     ~
                            1.3.2.   A fixed timber jetty complying with Council's Planning Scheme Policy
                                     PSP4 - Domestic Marine Uses Outside of Noose Waters Estate and
                                     deleting the pontoon structure; or                                                -
                            1.3.3,   A reduction in the level of the jetty platform to the minimum required above
                                     HAT and the provision of only a single stair access at the jetty head /          ” -
                                     pontoon.
                    1.4.     Materials and colours of all structures.
    @               7.5.     Elevations of the proposed structures indicating the various HAT, LAT, MHWS and           .
                            MLWS levels,                                                                              *
                    1.6.     Please indicate on the plans that all sections of the existing structure located in the
                            river frontage of the subject property, both above and below water level, have been
                            removed or will be removed as part of these works.
                                                                                                                       4
              RESPONSE                                                                                                ae
      ;       1.    Strand Gardens does not accept that the proposal is excessive, this is a contempory                :
   Oo               standard of boat mooring that would be expected for a dwelling of this quality and it will
                    not be changed to something comparable to a backwater facility.
                    The appropriateness of the facility is confirmed in the Visual Impact Report prepared
i:                  by LVO Architecture at APPENDIX FIVE.                                                              y
   ,                1.1      The regatta stairs allow safe access to the water over the rock face, and is in        nee

      :       ©        ;                  aa                                                        Page4       ss  " *
                 emanate        ae       ". Response to Information Request                                        ary

Section 9

[8]              :
                                                       RESPONSE TO INFORMATION REQUEST            Pah

                           keeping with the standard of the dwelling being built by Strand Gardens.                ,
                           Originally Strand Gardens wanted wider regatta stairs (refer to plan at                 -
                           APPENDIX SIX). However during discussions with MSQ they were reduced to                  ;
                           sit neatly behind the pontoon.
                   4.2/1.3 itis noted in the LVO Report at APPENDIX FIVE that in Strand Gardens case
                           a policy compliant 5 meter x 3 meter pontoon which was connected to the
                           shoreline by a narrow ramped gangway did not provide a development that
                           was   “at a  scale and nature     complementary and respectful to their
                           surroundings”. A compliant pontoon would be 5m x 3m (ie. 15m? in area) the
                           proposal is for a 8m x 2m pontoon (ie. 16m*). Strand Garden suggest the
                           difference in scale is negligible. Further it is noted if one of the stairs which
                           link the walkway to the pontoon was to be removed from the proposal, the
                           asymmetrical result would not complement either the scale or the symmetry of
                           the house and the surrounding built form.                                [email protected]     Strand Gardens submits that materials and colours of the prescribed tidal             a
                           works will be complementary to its surroundings, refer to Development Plans        -  be
                           at APPENDIX SEVEN.                                                                   LS vs
                   1.5/1.6 The updated plans at APPENDIX SEVEN indicate the various HAT, LAT,            Hoy —
                           MHWA AND MLWS levels as well as illustrating the location of the previous           as a
                           structure and confirming its removal.

                                                                                                                 2

:            ©                                                                                  Page 5        ‘38
                emanate       -           Response to Information Request                                     oe   es
                               oe                    .   ” 2 oe eye                                             oF .
                             og ”                         :  -    te                                             .*

Section 10

fag!               :
                                                           RESPONSE TO INFORMATION REQUEST                 FA                "oy

           2.       ASSESSMENT AGAINST REVELANT SPECFIC OUTCOMES

            Please provide an assessment of the proposed structures with regard to the relevant specific                       ,
            outcomes of Schedule 4a - IDAS Code for development applications for prescribed tidal work
            of the Coastal Protection and Management Regulation 2003.
            RESPONSE
            The following is an assessment against Schedule 4a. We note the proposal is in teh Noosa
            River and not in a canal.

            $01.1      Prescribed tidal work | PS1.1     The    design   and | PS1.1      Strand         Gardens
                       in a canal and for a              construction of the               submits that proposed
  ©                    private  purpose   is             prescribed tidal work            jetty’ pontoon   is  not
                       compatible   with  its            is  consistent  with              located  in  a_  canal,
                       location, having regard           the        following              therefore SO1.1 is not
                       to the following—                 standards—                        applicable.
                       (a)  the character and:           (a)  subject      to
                            amenity  of  the                  paragraph   (c),
                            work's immediate                  prescribed tidal
                            surroundings and                  work does not
                            the locality within               extend     past
                            which the work is                 the        side
                            located;                          boundary     or
                            ;                                 extended side
                        (b) if the relevant                   boundary of the
                            planning scheme                   lot  connected
                           states       the                   to the work;
                            desired
                            character     or             {b)  subject      to
                            amenity for the                   paragraph   (c),
                           work's                             prescribed tidal
  .                         immediate                         work    is  not
   oO                       surroundings  or                  roofed;
                            re cea    witin              |e)   a relevant
                            is  located—the                    P Nome
                            stated   desired                  seneme        .
                            character     or                  standard      IS
                            amenity                            more stringent                                                 oo,
                                                              than        the
                                                               standard                                                     oN
                                                               mentioned — in                                                  .
                                                               paragraph   (a)                                                4
                                                               or     (b}—the                                                  .
                                                               relevant
                                                               planning
                                                               scheme
                                                               standard,   to
                                                               the extent it is
                                                               more stringent
                                                               than       the
     ,                                                         standard
4                                                              mentioned    __in                                               -
      .        TTT                                                                                                       /  « .
             ©                                te        oy        °°                                      Page 6             7
                emanate                      Response to Information Request                                          :      ‘-

Section 11

Le
                                                               RESPONSE TO INFORMATION REQUEST                  Pa                 ;

                                                                  paragraph    (a)
                                                                  or (b);
                                                             (d)  any       other
                                                                  relevant
                                                                  planning
                                                                  scheme
                                                                  standard that is
                                                                  not inconsistent
                                                                  with        the
                                                                  standards
                                                                  mentioned     in
                                                                  paragraphs
                                                                  (a) to (c).

    oO         $01.2       Prescribed tidal work | PS1.2     The    design    and | PS1.2      Strand         Gardens
                           in a canal and for a              construction of the               submits the prescribed
                           non-private purpose               prescribed tidal work             tidal works are not for               .
                           is compatible with its            is  consistent . with             commercial    purposes
                          location,      having              the        following              therefore S$O1.2 is it
                           regard     to    the              standards—                        not applicable.
                         following—                          (a)  subject       to
                           (a) the character and                  paragraph   (c),
                               amenity   of  the                  prescribed tidal
                               work's immediate                   work used for
                               surroundings and                   a   commercial
                               the locality within                purpose does
                               which the work is                  not      extend
                               located;                           past the side
                               .                                  boundary     or
                           (b) Nanning rerevant                   extended side
                              states        the                   boundary of the
                                   .                              lot  connected
                               desired
                                                                  to          the
                               character     or                   work:
    O                          amenity for the                              ,                                                        .
                              work's                         {b)  subject       to
                               immediate                           paragraph   (c),
                               surroundings   or                   prescribed tidal
                               the locality within                work    is   not                                                   .
                               which the work                      roofed unless it
                               is   located—the                    is  the  main                                              ~
                               stated    desired                  access        to                                             .
                               character     or                    land;                                                           .
                               amenity.                      (c)   if a relevant                                                Sy
                                                                   planning
                                                                   scheme
                                                                   standard     is
                                                                   more stringent
                                                                   than       the
                                                                   standard
                                                                   mentioned    in
                                                                   paragraph   (a)
                                                                   or    {b}—the
                                                                   relevant                                                         ‘

       ou      ©                          .,      .       :                ,      z                            Page 7             ds
 r     :          emanate                   _   Response to Information Request                                                    “4
.                       LEGAL          :               a has                  a      ,                                       oe

Section 12

a                                                                                                                    .
                                                                                                               [rt                .
                                                              RESPONSE TO INFORMATION REQUEST                 gatag                .

                                                                  planning
                                                                 scheme
                                                                 standard, to the
                                                                 extent    it  is
                                                                  more stringent
                                                                 than        the
                                                                  standard
                                                                  stated       in
                                                                  paragraph   (a)
                                                                  or (b);
                                                            (d)   any       other
                                                                  relevant
                                                                  planning                                                 ,        ;
                                                                  scheme                                                 .
                                                                  standard   that                                                 ,
                                                                  is         not
    o                                                             inconsistent                                                   gg
                                                                 with        the                                                 Pas
                                                                  standards                                                      io
                                                               _  mentioned    in                                                  *
                                                                  paragraphs
                                                                  (a) to (c).

               $02.1      Prescribed tidal work | PS2.1     The    design    and | PS2.1      Strand         Gardens
                          not in a canal and for            construction of the               submits the proposed
                          a private purpose is              prescribed tidal work             jety/ pontoon.
                          compatible   with  its            is  consistent   with
                          location,      having             the         following
                          regard     to     the             standards—                        (a)  Does           not              ;
                          following—                        (a)   subject      to                  encroach past ee             oS
                          (a)  the character and                  paragraph  ({e),                 s! de bo nd en e
                               amenity  of  the                   prescribed tidal                 side  boundary,
                               work's                             work does not               (b)  The      proposed              3
        .                      immediate                          extend past the                  work will not be              “ee
    ©                          surroundings                       side boundary                    roofed                     ‘ea
                               and  the  locality                 or   extended                                                my
                               within which the                   side  boundary              (c)  The — proposed                 re
                               work is located;                   of    the   lot                  structures are in             7
                                                                  connected    to                  accordance with           a
                          (b)  if  the  relevant                  the work:                        relevant planning          ea
                               planning scheme                            ,                        scheme                   + dn Ss
                              states        the              (b)  subject      to                  standards                 Tan,
;                              desired                            paragraph  (e),                   mentioned in (a)        “2%
oo                             character     or                   prescribed tidal                 and (b).                   ga,
mo                             amenity for the                    work   is   the                                             moa
 i *                           work's                             only  work   of            Strand Gardens further                *
 e                             immediate                          its type along              submis nal         hae
-                              surroundings  or                   the  edge    of            been sb one 4 t as
                               the locality within                the tidal water             M        J aineg    from
                               which the work                     fronting the lot            oan          efor     C
    '                          is  located—the                    connected    to
te                             stated   desired                   the work;                   APPENDIX ONE).
                               character      or                      ;
                                     :                       (c)  subject      to                                                  .
LO                             amenity.                           paragraph   (e),                                                “"

             _ ©                           me                             .      "                           Page 8              ee
  “.          +  ,emanate           "+          Response to Information Request                                            se
             ~—         LEGAL      Co  ies ‘  3 “ .   i+  oy a          :       “4                                                 :

Section 13

;
                                                                                                               oy               “
                                                            RESPONSE TO INFORMATION REQUEST                  Fa                  by,
                                                                                                                                  Oy

                                                                                                                                   7
                                                                prescribed                                                        '
                                                                tidal work that                                                   4
                                                                is a boardwalk                                                    3
                                                                or
                                                                independent
                                                                deck    is  not
                                                                roofed;
                                                          (cd)  subject      to
                                                                paragraph   (e),
                                                                prescribed tidal
                                                                work      other
                                                                than          a
                                                                boardwalk    or
                                                                deck    is  not
                                                                roofed unless it
 @                                                              is  the   main
                                                                access       to
                                                                land;                                                            oi.
                                                           (e)  if a   relevant                                               ae
                                                                planning                                                       wae
                                                                scheme                                                          we?
                                                                standard      is                                              .
                                                                more   stringent
                                                                than        the                                                  .
                                                                standard                                                        “oe
                                                                mentioned     in                                                one
                                                                paragraph (a),                                                 we
                                                                (b),   (c)   or                                              at
                                                                (d} the                                                     as
                                                                relevant                                                     Nes
                                                                planning                                                         ae
                                                                scheme                                                          we
                                                                standard,     to                                                  is
                                                                the extent it is
     y                                                          more stringent                                                   7
 @                                                              than        the
                                                                standard
                                                                mentioned     in
                                                                paragraph (a),
                                                                (b), (c) or (d);
                                                           (f)  any        other                                                  ;
                                                                relevant                                                          i!
                                                                planning                                                           *
                                                                scheme                                                            a
                                                                standard    that
                                                                is          not
                                                                inconsistent
                                                                with        the
                                                                standards
                                                                mentioned     in                                                   .
                                                                 paragraphs                                                        é
                                                                (a) to (e).
                                                                                                                                  ‘

                        ee                                                                                                      “4
     ~       ©           |             .      “ee             Co                                             PageQ             kg
DO              emanate                    , .Response to Information Request                                    we             eg
    .                 LEGAL         Bo               -     .        :            ob                                         -   ot
                                                es Ae           .       po.                                                        7

Section 14

,                             1      “sy                                              . i

                                                                                                                              ¢
                                                                                                          CA                  %
                                                         RESPONSE TO INFORMATION REQUEST                 getay               ;

          $02.2       Prescribed tidal work | PS2.2    The    design    and | PS2.2      Strand         Gardens                .
                      not in a canal and for            construction of the              submits the prescribed                "
                      a        non-private              prescribed     tidal             tidal  works    is _ for
                      purpose            is            work   is consistent              private       purposes
                      compatible with   its            with  the   following             therefore SO2.2 is it
                      location,     having              standards—                       not applicable.
                      folowing        the               (a)  subject      to
                                                             paragraph (c),
                      (a) the   character                    prescribed
                          and = amenity                      tidal     work
                          of   the  work's                   used    for  a
                          immediate                          commercial
                          surroundings                       purpose does
                          and the locality                   not     extend
                          within which the                   past the side
©                         work is located;                   boundary     or                                            :
                           .                                 extended side                                         woos
                      (b) if the relevant                    boundary     of                                        es     OD og
                          planning                          the          lot                                        Sed
                          scheme states.                     connected    to                                       DT      TS
                          the      desired                   the                                                   ce
                          character     or                              .
                                :                            work;
                          amenity for the
                         work's                         (b)  subject      to
                          immediate                          paragraph (c),
                          surroundings or                    prescribed
                          the       locality                 tidal     work
                          within which the                   used    for   a
                          work           is                  commercial                                                       a
                          located—the                        purpose is not                                                cat
                          stated    desired                  roofed  unless                                                  "
                          character     or                   it is the main                                                 ane
                          amenity.                           access       to                                                 a
                                       .                     land;                                                           *y
@                                                       (c)  if a   relevant
                                                             planning                                                         *
                                                             scheme                                                            .
                                                             standard     is
                                                             more stringent
                                                             than        the
                                                             standard                                                          .
                                                             mentioned _ in                                                    .
                                                             paragraph   (a)                                                  q
                                                             or     (b)—the                                                    :
                                                             relevant                                                         "
                                                             planning                                                         #
                                                             scheme                                                            ‘
                                                             standard,    to
                                                             the extent the
                                                             standard      is
                                                             more stringent
                                                             than        the
                                                             standard                                                         “
                                                             mentioned — in
                                                              paragraph   (a                                                 “4
           ©      :                     : , }       -          ;                                                         , :  .
                                                a    rr                   yy                           Page10     .-        2
              emanate            “*   4  & Response to Information Request                                9              ioe
                   LEGAL       ee                 OR          te oe                                                  Low
                                   ee.           “        aot       -    pe     .                                            wt

Section 15

.         .                                                                                 4

                                                                                                            rte
                                                          RESPONSE TO INFORMATION REQUEST                   PAE                 i

                                                             or (b);                                                           7
                                                        (d)  any       other
                                                             relevant
                                                             planning
                                                             scheme
                                                             standard that
                                                             is          not
                                                             inconsistent
                                                            with         the
                                                             standards
                                                             mentioned     in
                                                             paragraphs
                                                             (a) to (c).

Oo        $03.1      Prescribed tidal work | PS3.1      The   height,  scale | PS3.1      Strand         Gardens
                     is of a height, scale              and   size   of  the              submits     that — the              a
                     and size to ensure                 prescribed tidal work             proposed     jetty  and            oe
                     the     work        is             is  consistent  with              regatta    stairs = are       sy
                     compatible with the                each        relevant              compatible    with   the     ous     f
                     character         and              planning    scheme                setting and character               a
                     amenity     of    its              standard.                         of the locality
                      oard      to ne                                                     For further justification
                     following—                                                           refer to Visual Amenity
                                                                                          Report at APPENDIX
                     {a)  the height, scale                                               FIVE.
                          and size of the                                                                                      o
                          natural features                                                                                    rh
                          of  the   work's                                                                                     ee
                          immediate                                                                                           a
                          surroundings and                                                                                   ae
                          the       locality                                                                                    tt
                          within which the                                                                                     -
                          work is located;                                                                                     *
 oO                  (b)  the height, scale                                                                                    .
                          and size of the
                          existing
                          buildings     or
                          other structures
                          in. the   work's
                          immediate
                          surroundings and                                                                                     F
                          the       locality
                          within which the
                          work is located;
                      (c)  if the  relevant
                          planning scheme
                          states        the
                          desired   height,
                          scale or size of                                                                                      é
                         buildings       or                                                                                     j
                          other structures                                                                                      ‘
                          in   the  work's                                                                                      :
                          immediate                                                                                            :

          ©              ,                     ee                      oe                               Page 11             ,'
             emanate                     ., Response.to Information Request                                               Beate,
              eo   REGAL   ew               gle vem     gy ro re:                                               -           ae me,
                          ms            ‘         i         So                                                               wee

Section 16

Pojed               |
                                                              RESPONSE TO INFORMATION REQUEST                    th

                               surroundings  or
                               the locality within
                               which the work
                               is  located—the
                               stated   desired
                               height, scale or
                               size.

               $04.1      The materials used | PS4.1         The materials used | PS4.1        Strand         Gardens
                          for, and the colours              for, and colours of,               submits the materials,
                          of,  prescribed _ tidal            the prescribed tidal              and   colours of,    the
                          work are compatible                work are consistent               prescribed tidal work will
                          with  the   character              with each relevant                be sympathetic. of the
                          and amenity of the                 planning    scheme                surrounding   area  and
                         work's        location,             standard.                         will be in accordance
     oO                   having regard to the                                                 with relevant planning
                          following—                                                           scheme standard.
                          (a)   the     natural                                                Refer to LVO Report at
                                features of the                                                APPENDIX FIVE.
                               work's                                                                                                .
                                immediate
                                surroundings
                                and the locality
                                within — which
                                the   work   is
                                 located;
                          (b)    the   existing
                                 buildings   or
                                 other                                                                                             -
                                 structures  in                                                                                     7
                                 the    work's                                                                                      ‘
                                 immediate
                                 surroundings
    O                            and        the
        !                        locality within
                                which       the
                                 work        is
                                 located;
                           (c)   if the relevant
                                 planning
                                 scheme states                                                                                       ,
                                 the    desired                                                                                      if
                                 materials to be                                                                                  wo
                                 used   for, or
                                 desired
                                 colours    of,
                                 buildings — or
                                 other
                                 structures   in
                                 the     work's
                                 immediate
                                 surroundings
                                 or the locaili                                                                                     .

                                                                eee                                                               wo .
-              ©:                         a        ae              De                                        Page12      ~   ©
   mo             emanate                     + Response to Information Request                                             ers

Section 17

2                                  -     r                                                     x
                                           -                               -                                                     6

                                                                                                                th                BS
                                                              RESPONSE TO INFORMATION REQUEST                  FAA                 de

                                                                                                                                    .
                                within  which
                                the  work    is                                                                                     ;
                                located—the
                                stated desired
                                materials   or
                                colours

              $05.1       Lighting, other than | PS5.1      The lighting for the | PS5.1      Strand         Gardens
                          an aid to navigation,             prescribed      tidal             submits that while no
                          for prescribed   tidal            work, other than an               lighting is proposed at
                          work is installed in a            aid to navigation, is             this juncture if any is
                          way to ensure the                 consistent with the               installed it will be in
                          security  and   safe              following                         accordance          with
                          use   of  the   work              standards—                        AS4282 The Control of
                         without       causing                                                the  Obtrusive   Effects
   ©                      significant  adverse              (a)   subject  h to               of Outdoor Lighting..
                          effects on the amenity                  vehting   (c),
                                           ep                     ighting     for                                             .
                          of the locality within                  prescribed tidal                                           Soe
                         wre     the  work. is                   work is hooded                                               ar
                                                                  and    directed                                                 “od
                                                                  downwards;                                                      ‘
                                                            (b)   subject      to
                                                                  paragraph   (c),
                                                                  each __ lighting
                                                                  standard, to the
                                                                  extent relevant;
                                                            (c)   if a   relevant
                                                                  planning                                                         oh
                                                                  scheme                                                           3
                                                                  standard     is                                                   ”
                                                                  more _ stringent                                                 ‘.
                                                                  than        the                                                   a
      .                                                           standard
    @                                                             mentioned    in                                                  as
                                                                  paragraph   (a)                                                  ©
                                                                  or    (b)—the
                                                                  relevant
                                                                  planning
                                                                  scheme
                                                                  standard,    to                                                   Oo
                                                                  the extent the
                                                                  standard     is
                                                                  more stringent                                                   ‘
                                                                  than        the                                                   .
                                                                  standard
                                                                  mentioned — in
                                                                  paragraph   (a)
                                                                  or (b);
                                                             (d)  any       other
                                                                  relevant
                                                                  planning                                                          a
                                                                  scheme                                                         “le
                                                                  standard _ that                                                  i
ae         —.wooeem                                                                                                            eae
i              ©                                      oe           :             .                           Page 13            oS
                  emanate           7          Response to Information Request                                                  a

Section 18

Paice
                                                                RESPONSE TO INFORMATION REQUEST                  Fach                 -

                                                                   is          not
                                                                   inconsistent                                                        ‘
                                                                   with        the                                                    ,
                                                                   standards
                                                                   mentioned — in
                                                                   paragraphs
                                                                   (a) to (c).

               $06.1       A   sign’ erected  or | PS6.1      A sign   erected   or | PS6.1      Strand         Gardens
                           otherwise  placed   in             otherwise placed in                submits no signage is
                           position           for             position for prescribed            proposed.
                           prescribed tidal work,             tidal work, other than
                           other  than   a_ sign              a  sign  erected   or
                           erected or placed for              placed   for   safety
                           safety   reasons    or             reasons or under an
     O                     under an Act—                      Act,   is  consistent
                           (a)  is compatible with            with   ne _ folowing                                                    .
                                the character and                        .
                                amenity of the                 (a)  subject      to
                                work's immediate                    paragraph (c),
                                surroundings and                    a sign erected
                               the locality within                  or  placed   in
                                which the work                      position    for
                                is located; and                     identifying
                           {b)  is not a dominant                 presonbed tidal
                                feature  of   the                   work,  or   the
                                                                    owner   of  the
                                work, unless the                            ;
                                    :      -                        work,   is  the
                                dominance is for                               .                                                      as
                                                                    only      sign                                                  . |
                                safety reasons                      erected      or
                                                                    placed       in
                                                                    position    for                                                   _
                                                                    identifying the
                                                                    work or owner;                                                     ,
     O                                                         {b)  subject      to
                                                                    paragraph   (c),
                                                                    a sign erected
                                                                    or   otherwise
                                                                    placed       in
                                                                   position      for
                                                                    prescribed _ tidal                                                 ‘
                                                                   work          is                                                    :
                                                                    integrated into                                                 J
 oy                                                                 the design and
oo                                                                  construction of
                                                                    the work;
                                                               (c)  if a  relevant
a                                                                   planning
                                                                    scheme
                                                                    standard is more
                                                                    stingent — than
                                                                   the     standard
                                                                    mentioned     in                                                   ,

                     :                    os              oe.       ."      +      wo                          Page 14             a
                   emanate              -         Response to Information Request”                                9           mo,
                         LEGAL     oof            :    Boga                                                                 CO

Section 19

3   -

                                                                                                                TE]
                                                              RESPONSE TO INFORMATION REQUEST                  Foch            .   €
                                                                                                                                ~_

                                                                  paragraph (a}—
                                                                 the     relevant                                                  ,
                                                                 planning                                                           :
                                                                  scheme
                                                                  standard, to the
                                                                  extent it is more
                                                                  stringent than
                                                                  the   standard
                                                                  mentioned — in
                                                                  paragraph (a):
                                                             (d)  any      other
                                                                  relevant
                                                                  planning
                                                                  scheme
                                                                  standard that is
    O                                                             not                                                              ;
                                                                  inconsistent
                                                                 with         the                                         .       ”
                                                                  standards                                                    we
                                                                  mentioned    in                                        .       a
                                                                  paragraphs                                                       ‘
                                                                  (a), (b) and (c).

               $07.1       Excavation and filling | PS7.1   The earthwork and | PS7.1         Strand         Gardens              oes
                          for  prescribed  tidal            filling   for    the              submits no excavation              a,
                          work—                              prescribed tidal work            or filling is involved              ve
                               .                             is  consistent  with                                              orate
                         (a)   or carried    ne              each        relevant                                              ,  of
                               extent  o      ©              planning    scheme                                                Sos
                               reasonably                    standard                                                           ny
                               necessary     for                                                                                a
                               the work; and                                                                                      te
                           (b) does not have a                                                                                     :
      OQ                      significant
                               adverse    effect
                               on-
                               (i)  the  natural
                                    features  of
                                    the     tidal                                                                                  y
                                    water under,                                                                                   .
 ¢                                 within     or                                                                                 an
                                    over which                                                                                  oe
Meet                                the work is                                                                                 awe
os                                  located: or
i                              (ii) the level of
                                    the surface
                                    of the land
                                    under   the
                                    tidal  water
   :                                under, within
co                                  or      over                                                                                  &
 7             .                    which _ the                                                                                   “
                   .                                                                                                           Thy

   /                                   at                    : oo     .    .        soe                       age     .      a
  a              ‘emanate            me         Response to Information Request. --                            3     oo       vt
Lote,                    LEGAL        ,                     Mg                                                               i ne,
                :                      tea ¢                   etm     PF ae oy                                                 We
                                       ek                   ~  ee         ,    Pee                                            mo,

Section 20

i                                  tag        °                                          2s

                                                                                                            Paice
                                                            RESPONSE TO INFORMATION REQUEST                Foch                :

                                 work       is                                                                                 7
                                  located, or                                                                                  7
                                  any                                                                                         .
                                  foreshores
                                  near    the
                                  work.

 ,            $07.2      The     location   of | PS7.2    The   vegetation  in | PS7.2     Strand        Gardens
                         prescribed tidal work            the    tidal  water,             submits no vegetation
                         ensures   vegetation             under within or over             has to be cleared for
                         is    cleared     or             which the prescribed             the works to proceed.
                         disturbed only to the            tidal    work     is
                         extent    reasonably             located, or on land
                         necessary   for  the             under    the _ tidal
                        work.                             water, is cleared or
    O                                                     disturbed in a way
                                                          consistent     with                                                 i
                                                          each        relevant                                                oy,
                                                          planning    scheme                                              on
                                                        ' Standard.                                                          ae!

              $07.3      Any       vegetation | PS7.3     Vegetation affected | PS7.3      Refer to PS7.2.
                         damaged, destroyed               by   the  prescribed
                         or    removed     by             tidal work is dealt
                         prescribed tidal work            with   in   a   way
                         under,    within  or             consistent with the
                         over    tidal  water             following                                                           Vo
                         other     than    an              standards---                                                        ™
                         artificial waterway, is                   .                                                           gba
                         replaced        with              (a)  subject h   By                                               u
                         aporoprate                             reece,
                         vegetation.                              9
                                                                damaged,
      7                                                         destroyed   or                                                 .
    O                                                           removed     by
                                                                prescribed
                                                                tidal work   is
                                                                replaced with
                                                                native
                                                                vegetation for
                                                                the _ locality                                                 ‘
                                                                within  which                                                  +
                                                                the  work    is                                                .
                                                                located, to the                                                :
                                                                extent   it  is                                                ‘3
                                                                reasonably
                                                                practicable to
  ,                                                             replace    the
                                                                vegetation
.                                                              with     native
                                                                vegetation;
                                                           (b)  if a relevant
                                                                planning                                                      ~

               ©                                     Me                                                  Page 16             a
                  emanate                      Response to Information Request.                             9            oo
                        LEGAL                        gp             OT                                           Cs

Section 21

to               a4
                                                              RESPONSE TO INFORMATION REQUEST                 Face                 ¢

                                                                                                                                   |
                                                                  scheme
                                                                  standard     is                                                  ’
                                                                  more stringent
                                                                  than        the
                                                                  standard
                                                                  mentioned    in
                                                                  paragraph
                                                                  (a} the
                                                                  relevant
                                                                  planning
                                                                  scheme
                                                                  standard,    to
                                                                  the extent it is
                                                                  more stringent
                                                                  than       the
                                                                  standard
      oO                                                          mentioned — in                                                    '
        ,                                                         paragraph (a);                                               an
                                                             {c)  any       other                                             -  ve
                                                                  relevant                                                Re     git
                                                                  planning                                                         .
                                                                  scheme
                                                                  standard that
                                                                  is         not
                                                                  inconsistent
                                                                 with        the
                                                                  standards
                                                                  mentioned    in
                                                                  paragraphs
                                                                  (a) and (b).

               $08.1       Prescribed tidal work | PS8.1     The    design   and | PS8.1      Strand         Gardens
                           does   not  have   a              construction of the              submits the design and
                           significant  adverse              prescribed tidal work            construction   of   the
     oO                    effect    on     the              is consistent with the           prescribed   tidal work               .
                           availability of public            following                        will   not   have    an
                           access to foreshores,             standards—                       adverse    impact    on
                           including      public                     .                        public access to    the
                           access  proposed   in             (a)  subject      .              foreshore as there is
                           the relevant planning                 Paregren    i )              no     current __ public
                           scheme.                                Oo does rot                 access    only   private     7
                                                                  involve     the             access      for     the’ 2
,                                                                      .                      adjoining residence.     ee
:                                                                 erection     or                                  .       “~
                                                                  placement    of                                     fon   oe
°                                                                 any __ physical                                    ele.
:                                                                barrier                                              feos
  ,                                                               preventing
                                                                  existing access,                                      oe
                                                                  along a public                                          °
                                                                  accessway,   to                                      -.
                                                                  the foreshores                                         .
                                                                  near the work;
:                                                             b)  if a   relevant

  7            ©.                    -             ee       re                  :                           Pace 17     Set
   .         -     “emanate                   - Response-to Information Request                                9                 4
                         LEGAL                oa   +>     a ost       eve Be                                                oe se

Section 22

AG                4
                                                             RESPONSE TO INFORMATION REQUEST                PAE

                                                                planning                                                        ¢
                                                                scheme                                                           .
                                                                standard is more
                                                                stringent  than
                                                                the — standard
                                                                mentioned    in
                                                                paragraph (a}—
                                                                the     relevant
                                                                planning
                                                                scheme
                                                                standard, to the
                                                                extent it is more
                                                                stringent than
                                                                the   standard
                                                                mentioned — in
     .                                                          paragraph (a);
     oO                                                    (c)  any       other
                                                                relevant                                                         “
                                                                planning                                             eo
                                                                scheme                                                       —
                                                                standard that is                                                .
                                                                not
                                                                inconsistent
                                                                with        the
                                                                standards
                                                                mentioned — in
                                                                paragraphs (a)
                                                                and (b).                                                         :

               $09.1     The location and design | PS9.1   Public   access   to | PS9.1     Refer to PS8.1.                      ;
                         of prescribed tidal work          foreshores near the
                          does  not  adversely             prescribed tidal work
                          affect the safety of             is  consistent  with
                          members of the public            each         relevant
    O                     accessing        the             planning     scheme                                                  .
                          foreshores.                      standard,
               $010.1     Prescribed tidal work | PS10.1   The    design   and|PS10.1       Strand         Gardens
                          does not adversely               construction of the              submits     that    the
                         affect      navigable             prescribed tidal work             prescribed tidal work is
                          access     to,    or             is  consistent  with             located    within   the
                          navigable    egress              the        following             Water Allocation Area,
                          from, any non-tidal              standards-                       approved by Maritime              .
:                         work lot.                        (a)  subject      to             Safety 1 Queens‘and                 ;
‘                                                                paragraph (b), if          and    wi   not   affect
                                                                the          lot             navigable access.
                                                                 connected   to
                                                                 prescribed _ tidal
                                                                work       (the
                                                                 connected fot)
                                                                 adjoins a non-
                                                                 tidal work lot,
                                                                 the work does
                                                                 not extend past

 .      -*     ©                                 oo                                                       Page18           ...*
                  emanate              a       Response to Information Request                               9              ~ 7
                      .              mee                            a

Section 23

ett  |
                                                              RESPONSE TO INFORMATION REQUEST                  aaleg

                                                                 the   connected                                                   °
                                                                 lot's      side
                                                                 boundary,    or
                                                                 extended side
                                                                 boundary,
                                                                 adjoining   the
                                                                 non-tidal work
                                                                 lot;
                                                            (b)  if  a  relevant
                                                                 planning                                                           ,
                                                                 scheme
                                                                 standard      is
                                                                 more _ stringent                                      of
                                                                 than        the
                                                                 standard
    a                                                            mentioned — in
    O                                                            Paragraph
                                                                 (a}the
                                                                 relevant                                                 .    .
                                                                 planning                                                 coors
                                                                 scheme                                                          te
                                                                 standard,    to                                                   .
                                                                 the extent it is
                                                                 more stringent
                                                                 than        the
                                                                 standard
                                                                  mentioned = in
                                                                  paragraph (a).

               $011.1     Prescribed tidal work | PS11.1.—  The infrastructure for | PS11.1 = Strand         Gardens           ae
                          has       appropriate             prescribed tidal work             submits the prescribed           mo
                          infrastructure,                   is  consistent  with              tidal work is for private          Ty
                          including,         in             each         relevant             use and    will include            —
                          particular,     road              planning    scheme                the         appropriate
    O                     access,       parking             standard.                         infrastructure relevant          ws
                          facilities, sewerage                                                to the scale and size of            fit
                          services and    water                                               the   prescribed _ tidal             .
                          services,      having                                               work   in   accordance
                          regard to—                                                         with     the    relevant
                          (a)  the  nature  and                                               panning        scheme
                              scale of the work;                                                       ‘
                               and                                                                                                ‘a
                          {b)  the number of                                                                                       a
                               people that may                                                                                     :
'                              be on or at the
                               work at any time;
                               and
                          (c)  the  number   of
                               vehicles that may
                               be on or moored
                               at the work at
                               any time; and

               ©                        Te                         :                                        Page 19
      vO,         emanate                      ‘Response to Information Request                                             et

Section 24

ae                                                                                                             ‘
                                                                                                               Peto
                                                              RESPONSE TO INFORMATION REQUEST                 Fac

                          (d)  the protection of
                              any    foreshores
                              near the work and
                              the    vegetation
                              and       marine
                               plants  on   the
                              foreshores.

               $012.1.    Prescribed tidal work} PS12.4     The    design   and    |PS12.1    Strand         Gardens
                          is   designed    and              construction of the               submits the prescribed.
                          constructed in a way              prescribed tidal work             tidal work   has . been:
                          to   ensure    it  is             is  consistent  with              designed and will be
                          structurally  sound,              the        following              constructed           in}.
                          having regard to the              standards—                        accordance with:         .
    O                    following—                         (a)  subject      to              (a)  relevant
                          (a)  relevant                          paragraph                         engineering
                               engineering                       (b),      each                    standards;                     a
                               standards;                        Australian                   (b)  the location of          _    7.
                          (b)  the    location                   Standard                          the work;
                               of the work:                      relevant to the                             ,                    Le
                                           ;                     design       or              (c)  the   purpose   for
                          (c)  the purpose for                   construction  of                  which the work is
                               which the work is                  structures,  to                  to be used;
                               to be used;                       ne :     extent              (d)  the    impact    of
                                     .                            equirements                           .         .
                          (d)  the   impact  of                   stated  in. the                 flooding,      tidal!
                              flooding,    tidal                  Standard apply                   influences     and
                               influences   and                   to the design or                 hydrodynamic                    r
                               heya                               construction of                  changes; and                    x
                               enanges.                          prescribed                   (e)  relevant planning               ‘
                                                                  tidal                            scheme
                                                                  work;                            standards.
                                                            (b)   if a  relevant              Refer   to  APPENDIX                 -
    ©                                                             planning                    EIGHT for Engineering                 .
                                                                  scheme                      Certificate   for   the
                                                                  standard     is             proposed
                                                                  more _ stringent            jetty/pontoon.
                                                                 than        any
                                                                  standard
                                                                  mentioned — in                                                   .
                                                                  paragraph                                                        ”
                                                                  (a} the
 t                                                                relevant
                                                                  planning
                                                                  scheme                                                          .
                                                                  standard,    to
                                                                  the extent it is
                                                                  more stringent
.                                                                 than       the
                                                                  standard
                                                                  mentioned    in
                                                                  paragraph (a).

 os          Oo                                - os             ot      :                                   Page20      -+:     :
                  emanate           ,*    °°   *Response to information Request. -                             9     :      an
                        LEGAL      a.         oy  bee           Sop     gs        oN                                         ate
                                   .  :                    “    r   ro    :   .  ”                                                &
                                    te       .                      a

Section 25

ta gee - .               .      “¢ a   -   .                                          ie  Soya
                                                                                                                               + ee

                                                                                                                 th             ‘vs
                                                              RESPONSE TO INFORMATION REQUEST                 Fach                 *

               $012.2     Prescribed tidal work | PS12.2    The    design    andj; PS12.2     Strand         Gardens               c
                          does   not  adversely             construction of the               submits the design and
                          affect the structural             prescribed tidal work             construction   of   the
                          integrity   of    any             is  consistent   with |.          prescribed   tidal work
                          existing revetment or             the         following             will not adversely affect
                          seawall   or  another             standards—                        the structural  integrity
                          existing structure.                (a)  subject      to             of     any      existing
                                                                                              revetment or seawall or
                                                                  paragraph (b),              any    other — existin
                                                                  prescribed                            :           9
                                                                   :                          structure.in
                                                                 tidal     work,              accordance    with  the
                                                                  including  any                                   .
                                                                                              relevant       planning
                                                                  shore                       scheme standard
                                                                  abutment,                                     ,
                                                                  piling or other
     e}                                                           sre d                       It is noted the design
                                                                 with        the             of the proposed works                 "
                                                                  work-                       has _incorporated   the              -
                                                                                              existing          stone        st
                                                                  (i)  does - not             reventment wall    refer{|  ~~  «,
                                                                       place  an              to          engineering              ;
                                                                       additional             certificate —        at              ‘
                                                                       load   on              APPENDIX         EIGHT
                                                                       any                    and      plans        at
                                                                      existing                APPENDIX SEVEN.
                                                                       revetment
                         ;                                             or seawall
                                                                       or another
                                                                      existing
                                                                       structure;                                                  4
                                                                  (ii) can     be                                                  “
                                                            ,          structurall                                                '
                                                                       y                                                           a
     @                                                                 supported                                                 ag
                                                                       by     an                                                 oh
                                                                       existing                                                    4
                                                                       revetment
                                                                       or
                                                                       seawall
                                                                       or
                                                                       another
                                                                       existing
  '                                                                    structure;                                                 -
_*                                                           (b)  if  a  relevant
 i                                                                planning                                                         °
                                                                  scheme                                                            :
                                                                  standard      is
                                                                  more stringent
                                                                  than        the
                                                                  standard
                                                                   mentioned — in
                                                                   paragraph                                                       4
                                                                   a}—the                                                         ae
                                                                                                                                   >
   “                                                                                                                            #
  ”        _.                   r          mes   eon,    :  .    oe  : ia   «                                 ade             -
                  emanate           |;           Response to Information Request                               9       .    ee!
                       y LEGAL   | st            vo      .    a       &       oO                                     eo,    ‘, 5

Section 26

~
    a
                                                                                                            Ete               .
                                                           RESPONSE TO INFORMATION REQUEST                  Fier              a
                                                                                                                               : 4.
                                                                                                                               f 1
                                                                                                                              6
                                                               relevant                                                       -y
                                                               planning                                                         ‘
                                                               scheme
                                                               standard,    to
                                                               the extent it is
                                                               more stringent
                                                               than       the
                                                               standard
                                                               mentioned    in
                                                               paragraph (a).

             $012.3     Prescribed tidal work | PS12.3.   The   design    and|PS12.3       Strand        Gardens | . se
                        is   designed    and              construction of the              submits the design and | .- ~~
                        constructed in a way              prescribed tidal work            construction   of   the |     _
                        to ensure it does not             is consistent with the           prescribed  tidal work}   °°    >
   }                    adversely affect the              following                        will   not   adversely         ae
                        stability of the bed              standards—                       affect the stability of  |  ~"°“F
                        and   banks of   an                        ;                       the bed and banks of |         8%
                        tidal water.        Y             (a)  subject      to             the Noosa River.         Loe      ard
                                                               paragraph   (b),                                         ..
                                                               prescribed tidal                                           oy
                                                               work does not                                                   =
                                                               cause,       by
                                                               changing    the
                                                               flow of water,
                                                               the removal of,
                                                               or disturbance                                                   ‘
                                                               to,         the                                                  :
                                                               sediment    on                                 ,                 i
               i.                                              the   bed  and
                                 :        .                    banks of any                                   a
                                                               tidal water;                                   . m
                                                          (b)  if  a  relevant                                   -
  ;                                                            planning                                        i
   @                                                           scheme                                          wb.         .
                                                               standard      is                                          Le
                                                                more  stringent                               “ah       meg
                                                               than        the                                 i          vi
                                                                standard                                        ;          te
                                                                mentioned   in                                ot          i “ad
                                                                paragraph                                       |         “ st
                                                                (a}—the                                       hes         oe
                                                                relevant                                      -       .     a
                                                                planning                                     Sy   pe          I
.                                                               scheme                                         moots
  :                                                             standard,   to                              co    Tp Ng
   ,                                                            the extent it is                            Soe        eyo
                                                                more stringent                            .     '          wie
  ’                                                             than       the                                              re
                                                                standard                                                   Tag
                                                                mentioned — in                                             wt
                                                                paragraph (a).                                                3
  -                                                                                                                        me iL

  :          _——                                                                                                     * ie , * *
              ©.        -                                       .                                        Page 22       s    4
                 emanate                      Response to Information Request                               4           # ta g
                       LEGAL               .            a                                                              oe
                                          Jo      oT.      .    wo.     -                                                oa

Section 27

a
                                                               RESPONSE TO INFORMATION REQUEST                 FE   Hh]

                                                                                                                                   |
               $012.4     Prescribed tidal work | PS12.4     The    design   and|PS12.4 = Strand              Gardens               ¥
                          is   designed     and              construction of the               submits that Australian              *
                         constructed      using              prescribed tidal work             Standard relevant to the              ‘
                          materials  having   a              is consistent with the           materials,      will   be              :
                          long life in  marine               following                         followed, or measures
                          environments,                      standards—                        will be taken to treat
                          having regard to their                      .                        materials used, for the
                          ability to resist the              (a)  subject   h  A               jetty/ pontoon,  to the
                          following—                              ea          (0),             extent the requirements
                                                                  each                         stated in the Australian
                          (a) attack         by                  Australian                    Standard     appl
                               marine                             Standard                     .             pply    to
                               organisms;                         relevant to the              jetty/pontoon  that _'S
                                           '                      materials _ that             located   in  a  marine
                           (b) corrosion;                         should be used,              environment.
                           {c) deterioration                      or           the
     OQ                        resulting   from                    measures that
                               abrasion       or                   should      be
                               immersion      in                  taken to treat
                               seawater.                          materials                                                  "
                                                                   used,       for
                                                                   structures,  to
                                                                   the extent the
                                                                   requirements
                                                                   stated  in the
                                                                   Standard apply
                                                                   to   structures
                                                                   located  in  a
                                                                   marine                                                          .
                                                                   environment;                                                   va
                                                             (b)   if a   relevant                                                 “
                                                                   planning                                                      ook
                                                                   scheme                                                           .
                                                                   standard     is                                                   ‘
                                                                   more _ stringent                                                  “
     O                                                             than        the                                                 a
                                                                   standard                                                        ~
                                                                   mentioned    in
                                                                   paragraph
                                                                   (a}—the
                                                                   relevant
                                                                   planning
"                                                                  scheme                                                            .
                                                                   standard,    _to                                               oy
  a                                                                the extent it is                                               s
                                                                   more stringent
                                                                   than        the
mL                                                                 standard
                                                                   mentioned    in
                                                                   paragraph (a).

                $012.5     Prescribed tidal work | PS12.5     The    design   andj}  PS12.5     Strand         Gardens
                           is    designed    and              construction of the               submits     that    the
                           constructed in a wa                prescribed tidal work             prescribed tidal works
                                                                                                                                    F
            —   ©                          oe                                                                 Page 23             ga
                   emanate                  _:"  Response to Information Request                                 9     yo
                         LEGAL          we        ge          ve     og    eo,                                                   Aye
                                         - 4              £     .  ia     .  . ~                                                    wh

Section 28

a
                                                                                                               Lott
                                                              RESPONSE TO INFORMATION REQUEST                 Fah                 re

                          to ensure it does not             is  consistent  with              will  not   affect   an             a
                          adversely affect the              the        following              existing    stormwater
                         operation          or              standards—                        outlet as there is no               .
                          maintenance of any                         .                        existing    stormwater
                          existing  stormwater              (a)  subject   h  to              outlet located near the
                          outlet.                                veccule    (c),              proposed works.
                                                                  moored       at
                                                                  prescribed tidal
                                                                 work   do   not
                                                                  impede     the
                                                                 discharge    of
                                                                  stormwater;
                                                            {b)   subject      to
                                                                  paragraph  {c),
                                                                  prescribed tidal
    0                                                            work does not
     ~                                                            restrict access
                                                                  to         any                                                   ;
                                                                  stormwater                                                       s
                                                                  outlet;
                                                            {c)   if a relevant
                                                                  planning
                                                                  scheme
                                                                  standard     is
                                                                  more stringent
                                                                  than        the
                                                                  standard
                                                                  mentioned — in
                                                                  paragraph   (a)                                                 ae
                                                                  or    (b}—the                                                boas
                                                                  relevant                                                      ae
                                                                  planning
                                                                  scheme                                                        “we
                                                                  standard, to the                                               ve
      oO                                                          extent   it  is
                                                                  more stringent
                                                                  than        the
                                                                  standard
                                                                  mentioned    in
                                                                  paragraph   (a)
                                                                  or (b).
:              $012.6      Prescribed tidal work | PS12.6    The    design   and|PS12.6       Strand         Gardens              a
os                         is   designed    and              construction of the              submits the prescribed               .
   ..                      constructed in a way              prescribed tidal work            tidal  work    will  be
eo                         to ensure it does not             is  consistent  with             constructed in a way to
 7                         adversely affect the              the        following              ensure   no    adverse
                           water quality of any              standards—                        affect on   the  water
   .                       tidal water, including,                    :                        quality of   any   tidal
                           in particular, as  a              (a)  subject  h  Ae               water will occur. The
                           result of—                              echo       (6),             following standards will
                           (a)  release, into the                Australian                    be complied with:
                                tidal water,  of                  Standard                     e  Relevant Australian
             -                  materials  used                   relevant to the                 standard; or

                ©           _                we        Doo              me                                   Page24      =, a
                  emanate                    ". Response to Information Request                                             re
;                       LEGAL          wt      poe           .        oe         ee
                                            .   *          ne a    «    fo  swe                                                   |

Section 29

Ln aa               r
                                                              RESPONSE TO INFORMATION REQUEST                 Fach                .

                                                                                                                                  :
                              in           the                   design       or                  Rel       PI    .               +
                              construction   of                  construction of              *    Relvanat   Planning            t
                              the work; or                      structures                       Scheme standard.
                                .                                under, within or
                         (b) disturbance    to                   over tidal water,
                              the sediment on                    to  the  extent
                              the   bed    and
                              banks    of   the                 the .
                              tidal water; or                    requirements
                                        ’                        stated in the
                          (c)  exposure      to                  Standard
                              acid    sulphate                   are
                              soils.                             directed     at
                                                                 maintaining the
                                                                 water quality of
                                                                 tidal water;
    O                                                       (b)  if  a  relevant
                                                                 planning
                                                                 scheme
                                                                 standard      is
                                                                 more   stringent                                                  *
                                                                 than        the
                                                                 standard
                                                                 mentioned — in
                                                                 paragraph
                                                                 (a}the
                                                                 relevant
                                                                 planning
                                                                 scheme
                                                                 standard,    to                                                 :
                                                                 the extent it is                                               oo
                                                                  more stringent                                                 .
                                                                 than        the                                                  -
                                                                 standard                                                         .
                                                                  mentioned — in                                                  .:
    O                                                             paragraph (a).
               $012.7     ‘Prescribed tidal work | PS12.7_  The    design    and   }PS12.7    Strand         Gardens
                          is   designed    and              construction of the               submits      prescribed
                          constructed in a way              prescribed tidal work             tida! work   has  been
                          to ensure it is safe              is  consistent  with              designed especially for
                          for persons standing              the        following              the  Land   and   been
                          or  walking  on   the             standards—                       certified     by      an              s
   .                      work.                                      .                        appropriately  certified           vat
.                                                           (a)   arora h fc)                 engineer    to  ensure             Jf
 me                                                                   grap      f             safety for all persons              .
                                                                  any Stat                    during     and     after
                                                                  ook on which                construction  (refer to
  :                                                               a person may                Engineer Certificate at
                                                                                              APPENDIX EIGHT)
                                                                  stand or walk
  .                                                               is-
                                                                  (i)  not
                                                                       slippery                                                   7
                                                                       ;_and

   se          ©                                aed             ,                                           Page25       —°  # +
                  emanate              - .   *  Response to Information Request
                                       a ye         *           .                                                                *,

Section 30

2
                                                                                                               Fejna               |
                                                              RESPONSE TO INFORMATION REQUEST                  PAE                 «

                                                                 {ii) does not                                                   “
                                                                      have any                                                     ;
                                                                      feature                                                      !
                                                                      that may
                                                                      cause the
                                                                      person to
                                                                      trip or fall;
                                                             {b) subject      to
                                                                 paragraph (c),
                                                                 any    part  of
                                                                 prescribed
                                                                 tidal work that
                                                                  is unsafe   for
                                                                  persons
                                                                 standing     or
    ©                                                            walking on the
                                                                 work          is
                                                                  surrounded by                                                   we
                                                                  adequate                                                 7       %,
                                                                 barriers     to                                                   ;
                                                                  deter persons
                                                                  from  entering
                                                                  the part;
                                                             (c)  if a  relevant
                                                                  planning
                                                                  scheme
                                                                  standard     is
                                                                  more stringent                                                   "
                                                                  than       the                                                  7
                                                                  standard                                                        ve
                                                                  mentioned — in                                                  s
                                                                  paragraph   (a)                                                 “
                                                                 or     (b)—the                                                   °
     .                                                            relevant                                                         %y
     ©                                                            planning                                                       ..
                                                                  scheme
                                                                  standard,    to
                                                                  the extent it is
                                                                  more stringent
                                                                  than        the
                                                                  standard                                                         ;
                                                                  mentioned — in                                                   :
                                                                  paragraph   (a)                                                  .
                                                                  or (b).                                                         .

               $012.8      Appropriate            PS12.8     The   design    and|PS12.8       Strand         Gardens
                           measures are taken                construction of the              submits the prescribed
                           for prescribed tidal              prescribed tidal work            tidal work is for private
                           work   for  a   non-              is  consistent  with              use, therefore $012.8
                           private  purpose   to             the        following              is not applicable.
                           ensure            an              standards—
                           unsupportable    live                      .                                                            ;
                                r         .                  (a)   subject     to
                      .    load is not applied to                 paragraph   (b),                                                 :

mo,             ©  -  0.             kg          oO           sO,                     .                     Page 26      ae OES
  oe               emanate .         _,    .  ” Response to Information Request                                           Sf
    :                   LEGAL            ee     coe           POM bas            ”                                             wet
                                    .            °    on     .     ‘loos   ’                                                       oe

Section 31

Pajed              ,
                                                              RESPONSE TO INFORMATION REQUEST                FA                  tes

                                                                                                                                 ”
                          the work by persons                    prescribed tidal                                                “y
                          or vehicles.                          work        has                                                  4
                                                                 erected     or                                                  “
                                                                 placed       in                                                  <
                                                                 position on or
                                                                 near the work,
                                                                 a sign that-
                                                                 (i)  is visible                                                   ,
                                                                     at      all
                                                                      times;                                                      "
                                                                      and
                                                                 (ii) states the
                                                                      maximum
                                                                      live  load
                                                                      that  may
    e                                                                 be
                                                                      applied to
                                                                      the  work,                                                   oo,
                                                                      in terms of                                                 t
                                                                      the
                                                                      maximum
                                                                      number of
                                                                      persons
                                                                      that  may
                                                                      be on the
                                                                      work    at                                                   :
                                                                      any given                                                    «
                                                                      time    or                                                  te
                                                                      the                                                       “ot
                                                                      maximum                                                    a
                              °                                       number                                                    om
                             :                                        of                                                          iy
                                                                      vehicles                                                    a
                                                                      of       a
                                                                      particular                                                  .
    @                                                                 type   that                                                4
                                                                      may     be
                                                                      on      or
                                                                      moored at
                                                                      the   work
                                                                      at     any
                                                                      given                                                        °
 :                                                                    time;                                                      al
<                                                           (b)   if a  relevant                                                a)
     ;                                                            planning                                                         :
a                                                                 scheme                                                          :
:                                                                 standard     is
  ;                                                               more stringent
                                                                  than        the
                                                                  standard
                                                                  mentioned    in
                                                                  paragraph
                                                                  (a}—the
                                                                  relevant                                                         :

   :         -O.            |                         a                                                     Page  27         wt
     .        ty  emanate                      ' Response to Information Request                               S            sod
                .           ,                     ti    4  .  a                                              age              oe

Section 32

nn
                                                                                                                PAG                 _
                                                              RESPONSE TO INFORMATION REQUEST                  FACE                .

                                                                                                                                  +
                                                                  planning                                                        42
                                                                  scheme                                                           ‘s
                                                                  standard,    to                                                  .
                                                                  the extent it is
                                                                  more stringent
                                                                  than        the
                                                                  standard
                                                                  mentioned    in
                                                                  paragraph (a).

               $012.9     Prescribed       tidal | PS12.9    The   design    and|PS12.9        Strand        Gardens
                          work, other than a                 construction of the               submits the prescribed
                          boardwalk     or   an              prescribed tidal work             tidal work   is  for  a
                          independent     deck               is  consistent  with             jetty/pontoon   not  for
                          for a private purpose,             each        relevant              non-maritime purposes
    O                     is   designed     and              planning    scheme                or in a canal $012.9
                          constructed in a way               standard.                         does not apply.                    a
                          that ensures the use
                          of tidal water in a                                                             ‘
                          canal   for  a   non-                                                                                     ;
                          maritime purpose is                                                                                       ‘
                           minimised.

               $012.10     Prescribed tidal work | PS12.10   s 6(2) solution)       PS12.10    Strand        Gardens
                          that is a boardwalk or                                               submits the prescribed
                           an independent deck              The     design   and               tidal work is not for a
                                           :                 construction of the                                                    »
                           and   for  a_  private            boardwalk or deck is              boardwalk     or     an            2
                           purpose, is designed              consistent with  the              independent       deck,             ‘
                           and - constructed in a            followin                          therefore $012.10     is            48
                           way that ensures the             stan dards                         not applicable.                     4
                           use of tidal water in a                                                                                  t
                           canal  for  a   non-              (a)  subject      to                                                  4
                           maritime purpose is                    paragraph (c),                                                  -
     O                     minimised                              a boardwalk or                                                   ri
                                                                  independent                                                       .
                                                                  deck does not
                                                                  extend     more
                                                                  than 3m from the
 .                                                                waterfront
                                                                  boundary of the
                                                                  lot connected to                                                  4
                                                                  the boardwalk or                                                 ‘
                                                              (b) subject      to                                                   ;
   ,                                                               paragraph (c),
'                                                                 a_ boardwalk or
,                                                                  independent       .
                                                                  deck is at least
                                                                   3m inside of the
                                                                   side boundary or
                                                                   extended   side
                                                                   boundary of the
                         :                                         Iot_connected to                                                 :

 ;              o                                  Lae                                                       Page28
                   emanate                       Response to Information Request                                      oo
                         LEGAL   :                We.      ge oYoc,    7                                                      To,
                                                  ve          e+e     -                                                           tk

Section 33

RESPONSE TO INFORMATION REQUEST                   ae

                   te                              -                   ¥ ts                :
                                                                   the boardwalk or                                                  ‘

                                                              {c)  if a   relevant
                                                                   planning
                                                                   scheme
                                                                   standard is more
                                                                   stingent   than
                                                                  the     standard
                                                                   mentioned     in
                                                                   paragraph (a) or
                                                                   (b)}—the
                                                                   relevant
                                                                   planning
                                                                   scheme
                                                                   standard, to the
     @                                                             extent it is more
     ‘                                                             stringent  than
                                                                   the    standard                                                   -_
                                                                   mentioned     in
                                                                   paragraph    {a)
                                                                   or (b).

               $013.1      Prescribed tidal work | PS13.1 — (s 6(2) solution)        PS$13.1    Strand         Gardens
                           that is a private boat                        .                      submits      that    the
                           ramp or private slip               re      eof ane                   prescribed   tidal work
                           way is designed and                boat ramp or slip                 does not involve the
                           constructed in a way               way   is  consistent              construction of a boat
                           to   ensure    it is               with  the  following              ramp    or  private  slip
                           structurally   sound               standards                         way, therefore SO13.1
                          ‘while also ensuring                                                  is not applicable.                    oe
                           the top of each wall               (a)  subject       to
                           at the edge of the                      paragraph (c),
                           boat ramp or slip way                   the walls at the                                                  .
                           is  level  with   the                   edge of a boat
     @                     surface of the land                     ramp    or  slip                                                  “a
                           on   which  the  boat                   way    penetrate
                           ramp or slip way is                     into the earth at
                           located.                                least   600mm
                                                                   below       the
                                                                   surface of the
                                                                   land on which
                                                                   the boat ramp                                                      ‘
                                                                   or slip way is                                                     .
                                                                    located;
4                                                             (b)   subject      to
                                                                    paragraph   (c),
"                                                                   the surface of a
                                                                    boat ramp or
                                                                    slip way is no
                                                                    more      than
                                                                    200mm above
                                                                    the
                                                              surface of the land

                ©                                 y    .      -        ot                                      Page 29            "ae,
                   emanate                      Response to Information Request                                    a,              8
                         LEGAL                  yo             pe                                                               toro.
                                                    57       .       rao,                                                            "

Section 34

Tae,                :
                                                          RESPONSE TO INFORMATION REQUEST                 geley                :

                                                        on   which    it  is                                                   .
                                                        located;
                                                        {c)  if a   relevant
                                                             planning
                                                             scheme
                                                             standard      is
                                                             more stringent
                                                             than        the
                                                             standard
                                                             mentioned     in
                                                             paragraph    (a)
                                                             or     (b}—~the
                                                             relevant
                                                             planning
                                                             scheme
@                                                            standard, to the
 :                                                           extent   it   is
                                                             more stringent
                                                             than        the                                                 wey
                                                             standard                                                         .
                                                             mentioned — in
                                                             paragraph   (a)
                                                            or {b).

           $013.2     Prescribed tidal work | PS13.2 —_ (s 6(2) solution)      PS13.2.    Refer to SO13.1.
                      that is a private boat                       .
                      ramp or private slip               ee ne oF ang
                      way is designed and               boat  ramp   or  slip                                                 i
                      constructed in a way                     .       .                                                     “
                                                        way    is  consistent                                       .    .    .
                      to ensure the safe                with  the  followin                                            oe
                      movement of vehicles               tandards—         9                                              oft
                      or persons over the               s                                                                   "4
                      boat  ramp    or  slip            (a)  subject      to                                                nr
                     way.                                    paragraph   (d),                                            .    .
@                                                            the       upper                                                  "
                                                             surface   of  a
                                                             boat ramp or
                                                             slip way has a
                                                             width   of   no
                                                              less      than                                                  i
                                                             3.6m;                                                            3
                                                        (b)   subject      to                                                BS
                                                              paragraph (qd),                                               .
                                                              the     whole                                                  a*
                                                              upper surface                                                  ros
                                                              of a boat ramp
                                                              or slip way is                                                   ,
                                                              treated      to
                                                              prevent it from
                                                              becoming
                                                              slippery    by                                                   .
                                                              using  any   of                                                 re
                                                              the  following                                                 *
                                                              methods-                                                       .

           ©                                            -                                               Page 30.         eet
              emanate                      Response to Information Request                                          cnr
                    LEGAL                             Se                                                              t wo

Section 35

'        .           .

                                                                                                                 Ltt:
                                                               RESPONSE TO INFORMATION REQUEST                  PAE                  :

                                                                                                                                   i
                                                                  (i)  forming                                                   iy
                                                                       grooves                                                      ik
                                                                       over   the                                                   ‘
                                                                       surface,                                                     “9
                                                                       as   close                                                    4
                                                                       as                                                            8
                                                                       possible to                                                   2
                                                                       40mm                                                          7
                                                                      wide,                                                          i
                                                                       20mm                                                          :
                                                                       deep and
    ,                                                                  150mm
                                                                       apart, and
                                                                       at      an
                                                                       angle   as
    @                                                                  close   as
                                                                       possible to
                                                                       70° to the                                                    o
                                                                       centre-line                                                   es
                                                                       of the boat                                            py
                                                                       ramp = or                                                  ‘o8
                                                                       slip way:
                                                                  (ii) covering
                                                                       the
                                                                       surface                                                       .
                                                                       with     a
                                                                       substance                                                    sone
                                                                       ordinarily                                                   _
                                                                       used    on                                                   4:
                                                                       slippery                                                    ‘5
                                                                       surfaces                                                   ae
                                                                       to prevent                                                 _*
                                                                       skidding;                                                    te
                                                                   (iii) making,                                                    weil
     @                                                                 through a                                                     “1
                                                                        physical
                                                                       act,    the
                                                                        surface
                                                                       coarse
                                                                        before   it                                                  :
                                                                       sets,                                                         .
                                                                        including,                                                  -.
.                                                                      for                                                           ¥
                                                                        example,
 ,                                                                      by raking
 >                                                                      the
                                                                        surface;
                                                             (c}   subject      to
                                                                   paragraph (qd),
                                                                   the      upper
                                                                   Surface  of   a
                                                                   boat ramp or
                                                                   slip  way   for                                                  *

         ,      ©.           be               -     my        Sy                                              Page 31          te  a
                   emanate                      -Response to Information Request                                              we
                         LEGAL                         ye               \                                          FoR        yt
                                              =        :    .    ;        .                                                       Mos
                                              ”    .     eee,      “                                                             oak

Section 36

fu
                                                                                                                 Pet:
                                                               RESPONSE TO INFORMATION REQUEST                 FRE                  ~

                      y    r                                           .           .                                               ee
                                                                                                                                   *
                                                                  which a winch
                                                                  is not used to
                                                                  hoist  or  haul                                                    ;
                                                                  vessels    onto                                                    ‘4
                                                                  the boat ramp
                                                                  or slip way is at
                                                                  a  gradient  of
                                                                  not    steeper
                                                                  than-
                                                                  (i)  if     the
                                                                       surface is
                                                                       treated by
                                                                       using    a
                                                                       method
                                                                       mentione
    @                                                                  d        in
                                                                       paragrap
                                                                       h (b){i) or                                                   :
                                                                       (ii)-1:8; or                                                  “
                                                                  (ii) otherwi                                                      .
                                                                       se-
                                                                       41:10;
                                                             (d)  if  a  relevant
                                                                  planning
                                                                  scheme
                                                                  standard      is
                                                                  more stringent
                                                                  than        the
                                                                  standard
                                                                   mentioned — in                                                   vt
                                                                   paragraph (a),
                                                                   (b) or (c}—the                                                    .
                                                                   relevant                                                          :
                                                                   planning
     @                                                             scheme
                                                                   standard,    to
                                                                   the extent it is
                                                                   more stringent
                                                                   than        the
   .                                                               standard
                                                                   mentioned — in
 YC                                                                paragraph (a),                                                   “
 -                                                                 (b) or (c).
 5
ey              $014.1     Prescribed tidal work | PS14.1.   The    design    and | PS14.1      Strand       Gardens
                           that is a bridge does             construction of the                submits the prescribed
                           not adversely affect              bridge,     including              tidal work is not for the
  -*                       existing public use of            any        abutment                construction    of    a
                           any    tidal   water,             connected with the                 bridge,       therefore
  :                        including,        for             bridge, is consistent              $014.1       is     not
                           example, use of the               with  the   following              applicable.
:                          tidal   water     for             standards—                                                             .
                           canoeing, swimming                                                                                      :

   oy           ©      .              Se                                       ”                              Page 32          i
       oo,         emanate |              .  .. *Response to:Information Request                                           my
         ‘               LEGAL  *           woe        rr.          foo     oe                                          ‘    tof
                                        3.  fH  OS,         mw            3     a                                                    a

Section 37

a                                                                                                                 af
                                                                                                               to               “4
                                                              RESPONSE TO INFORMATION REQUEST                 Fach                -

                                                                                                                                   5
                          oF oe recreational                (a)  subject      to                                                  8
                                  .                              paragraph (b),
                                                                 the   clearance
                                                                 levels under a
                                                                 bridge are high
                                                                 enough       to
                                                                 allow
                                                                 continued
                                                                  public use   of
                                                                 any tidal water                              ooo
                                                                 over which it is                               tat
                                                                 constructed;                                  fo
                                                            (b)   if a  relevant
                                                                  planning                                           .,
                                                                  scheme                                                           ;
    @                                                             standard    is                                        ~        sit
                                                                  more _ stringent                                            et
                                                                 than        the                                        Sy    TS
                                                                  standard                                                   ow eth
                                                                  mentioned    in                                              -
                                                                  paragraph                                                         :
                                                                  (a}the
                                                                  relevant
                                                                  planning
                                                                  scheme
                                                                  standard,    to
                                                                  the extent it is
                                                                  more stringent
                                                                  than       the                                                    ”
                                                                  standard
                                                                  mentioned    in                                             Oy
                                                                  paragraph (a).                                                  ae

     @         $014.2      Prescribed tidal work | PS14.2.   The   design    and|PS14.2       Refer toSO14.1.                      ;
                           that is a bridge does             construction of the                                                  ra
                           not adversely affect              bridge is consistent
                           the  flow  of  water              with  the  following
                           under the bridge.                 standards—
                                                             (a)  subject      to
                                                                  paragraph                                                        '
                                                                  (b}—                                                            7
                                                                  (i) if a bridge                                                  ‘4
 “                                                                   can      be                                                   -
 .                                                                   adequately
os,                                                                  supported
.                                                                    without
a                                                                    erecting or
                                                                     placing    a
    ;                                                                foundation
                                                                     support   in                                                  .
    :                                                                tidal                                                         :
                                                                    water—no
                            .                                                                                                      dl
     .                                                                                                                             7

       “        ©      =:         .         Yop.     Oe             Ts                                      Page 33        ne
       :           emanate                   oe   Re                   inn    Ras                                                -
  ’                     ‘UegaL      t,o   whe im ‘Response to Information Request                                  —           ot
                                     a          a   ae     rr a

Section 38

ory                                                                                             r
               ;                                                                                                                  ob
                                                                                                               re}                .
                                                              RESPONSE TO INFORMATION REQUEST                 Fach                cal
                                                                                                                                  4

                                                                                                                               J
                                                                    foundation                                                 aoe
                                                                    support   to                                                ve :
                                                                    support the                                                “  . :
                                                                    bridge     _is                                                 t
                                                                    erected   or                                                  oy
                                                                    placed    in
                                                                    the     tidal
                                                                    water; or                                                      <
                                                                 (ii) otherwise—
                                                                    only     the
                                                                    minimum
                                                                     number   of
                                                                    foundation
                                                                    supports
                                                                     required to
    @                                                                support the
                                                                     bridge    is                                                  :
                                                                     used;                                                oe      4
                                                            (b)  if  a  relevant                                          oe
                                                                 planning                                                    CN
                                                                 scheme                                                          °
                                                                 standard      is
                                                                 more stringent
                                                                 than        the
                                                                 standard
                                                                 mentioned _ in
                                                                  paragraph
                                                                 (a}—the                                                         of
                                                                  relevant                                                         .
                                                                  planning                                                    Lo
                                                                  scheme                                                          ta
                                                                  standard,   to                                                oo
                                                                  the extent it is                                              _
                                                                  more stringent                                                oy
    @                                                             than       the                                                  "ty
                                                                  standard                                                     sO
                                                                  mentioned — in
                                                                  paragraph (a).

               $015.1     Prescribed tidal work | PS15.1 —_ (s 6(2) solution)      PS15.1     Refer to SO12.10.
                          that is a boardwalk               The    design    and                                                   .
                          or  an   independent              construction of the                                                    3
                          deck and for a private             boardwalk or deck is
*e                     .   purpose is designed              consistent with   the
                          and constructed in a              following
                          way to ensure it is                standards—
                           able to  support  its
                           intended       loads,             (a)  subject     to
                           having regard to its                   paragraph
                           relevant     loading                   (d),         a                                                   ,
                          matters                                 boardwalk    or
                                                                  independent                                                     a
                                                                  deck                                                           a

7           Oe         A.                                                      ne                           Page 34.        tng
                  emanate.                      Response to Information Request                                               os
                        LEGAL              .      :           ne            a                   .                                 .
                             '                    2,        :    Se,                                                              .

Section 39

¥     .     ,                                 ;                                                  .

                                                                                                                   Pett            ——
                                                                RESPONSE TO INFORMATION REQUEST                   FEE

                                                                                                                                       -
                                                                   accessible    to                                                     ‘r
                                                                   vehicular traffic
                                                                   is    able    to
                                                                   support       at
                                                                   least   a_  live
                                                                   load of 3.0kPa
                                                                   plus   an   axle
                                                                   load of 101N;
                                                              {b)  subject      to
                                                                   paragraph
                                                                   ({d),         a
                                                                   boardwalk — or
                                                                   independent
                                                                   deck that is not
                                                                   accessible    to
    @                                                              vehicular traffic
                                                                   and that is for
                                                                   individual! use is                                                 a
                                                                   able to support                                           Sy        -
                                                                   at least a live                                                   ra
                                                                   load          of                                                  Me,
                                                                   2.0kPa;                                                             ik
                                                              (c}  subject       to
                                                                   paragraph
                                                                   (d),          a
                                                                   boardwalk — or
                                                                   independent
                                                                   deck that is not
                                                                   accessible    to                                                      ,
                                                                   vehicular _ traffic
                                                                   and that is for                                                    2
                                                                   group   use   is                                                    a
                                                                   able to support                                                   Lon
                                                                   at least a live
    @                                                              load of                                                             “ot
                                                              3.0kPa;                                                                   ”
                                                              (d)   if a   relevant
                                                                    planning
                                                                    scheme
                                                                    standard      is
                                                                    more _ stringent
                                                                   than         the                                                     ;
                                                                    standard                                                            %
                                                                    mentioned — in                                                      -
*                                                                   paragraph (a),                                                      :
                                                                    (b) or (c)~the                                                     ~
                                                                    relevant
                                                                    planning
                                                                    scheme
                                                                    standard,    to
                                                                    the extent it is
                                                                    more stringent                                                      :
                                                                    than        the                                                      .
                                                                    standard                                                           _—

   °       -   ©!                                  -.      ,      ee,                                           Page 35           oo
   SOF            emanate                    1»  Response to Information Request                                               SBT
                        LEGAL                -         *                i                                                          wea tn
                                               ed  .          ~~              +                                                         ij

Section 40

HI             "
                                                                RESPONSE TO INFORMATION REQUEST                  FAA

                                                                   mentioned — in
                                                                   paragraph (a),
                                                                   (b) or (c).

               $015.2      Prescribed tidal work | PS15.2     _(s 6(2) solution)     PS15.2      Refer to $012.10.
                           thats a                            The     design    of
                           boardwalk    or    an              construction of the
                           independent     deck               boardwalk or deck is
                           and for a non-private              consistent  with the
                           purpose is designed                following
                           and constructed in a               standards—
                           way to                             {a)  subject      to
                           ensure it is able to                    paragraph (c),
      —_                   support its                             a    boardwalk
    @                      intended       loads,                   nde endent                                                          .
                           having regard to its                    dock.                                                  .        ~
                           relevant      loading |  _-             accessible    to                                        oe       nO
                          matters.                                 vehicular traffic                                                  7
                                                                   is    able    to
                                                                   support       at
                                                                   least       the
                                                                   following-
                                                                   (i) a distributed
                                                                       live load of
                                                                       5.01cPa;
                                                                   (ii) a                                                          —_
                                                                      concentrate                                                     a
                                                                       d live load of                                               a
                                                                       4.5kN;                                                      oo
                                                                    (iii)the load of                                              bo
      ‘                                                                the  largest                                             Pk
    @                                                                  vehicle
                                                                       capable of                                                      .
                                                                       being    on
                                                                       the
                                                                       boardwalk
                                                                       or deck;
                                                              (b)   subject      to                                                   3
                                                                    paragraph (c),                                                   aN
                                                                    a boardwalk or                                                    ob.
                                                                    independent
.                                                                   deck        not
.                                                                   accessible   to
                                                                    vehicular traffic
 ;                                                                  is   able    to
                                                                    support      at
                                                                    least       the
                                                                    following-                                                         .
                                                                     i) a distributed

                ©.       +...      '           Fo        Co                                                    Page36             eae
                   emanate               .    * Response to Information Request                                      °          mo
                                           ioe    ra]         ;    -                                                          .   so,
                                           Ye           .    *      .     *               .                                       4 bee

Section 41

Ere]               *
                                                              RESPONSE TO INFORMATION REQUEST                  Fach                 *

                                                                     live load of                                                    ;
                                                                     5.0kPa;                                                         ‘
                                                                  (ii) a
                                                                     concentrate
                                                                     d live load of
                                                                     4.5kN;
                                                            (c)   if a   relevant
                                                                  planning
                                                                  scheme
                                                                  standard     is
                                                                  more stringent
                                                                  than        the
                                                                  standard
                                                                  mentioned — in
       '                                                          paragraph   (a)
    @                                                             or     (b)the
                                                                  relevant
                                                                  planning
                                                                  scheme                                                ,
                                                                  standard, to the
                                                                  extent   it   is
                                                                  more stringent
                                                                  than        the
                                                                  standard
                                                                  mentioned _ in
                                                                  paragraph   (a)
                                                                 or (b).

               $015.3     Prescribed tidal work | PS15.3.    The    design   and|PS15.3        Refer to $012.10.                   *,
                          that is a boardwalk or             construction of  the                                                   "
                          an independent deck                boardwalk or deck is
                          does not prevent or                consistent with  the
                          hinder remedial work               following
    ©                     being undertaken on                standards—
                          any bank of tidal water                     .
                          or for any existing                (a)  subject    h to
                          retaining        -wall,                (b),           a
                          revetment or seawall                    boardwalk    or
                          or   another  existing                  independent
                          structure.                              deck either—
                                                                  (i) can      be                                                  a
;                                                                    easily                                                          .
                                                                     dismantled
                                                                     and
                                                                     reassemble
                                                                     d; or
                                                                  (ii) does   not
                                                                      restrict the
                                                                      movement
                                                                      of
                                                                      machinery
                                                                      ordinaril

             . ©          ‘  -          ode  ‘    “     a       a                                            Pa e 37            f    .
                  emanate              ~*~.     Response to Information Request                                 9                   :
    .                   LEGAL             a           re            -       .
                                        * -   .   .   Any           .

Section 42

t"                              »    ¢       ”    :                                            .

                                                                                                                  ran                 :
                                                               RESPONSE TO INFORMATION REQUEST                    FUP                 “

                                                                                                                                      .
                                                                     used      for                                                   7
                                                                     remedial                                                          '
                                                                     work to any
                                                                     bank of tidal                                                     ~
                                                                     water      or
                                                                     any existing
                                                                     retaining
                                                                     wall,
                                                                      revetment                                                         ;
                                                                     or   seawall
                                                                     or      other
                                                                     existing
                                                                      structure;
                                                             (b)  if  a   relevant
                                                                  planning
  e                                                               scheme
                                                                  standard      is
                                                                  more   stringent
                                                                  than         the                                                    7
                                                                  standard
                                                                  mentioned     in
                                                                  paragraph
                                                                  (a)—the
                                                                  relevant
                                                                  planning
                                                                  scheme
                                                                  standard, to the
                                                                  extent it is more                                                  :
                                                                  stringent   than
                                                                  the standard                                                     2

             $016.1      Prescribed tidal work | PS16.1 = (s 6(2) solution)          PS16.1     Strand          Gardens
                         that is a jetty or pier                        ‘                       submits the prescribed
                         and: for   a_  private              rn re of an                        tidal work    has  been
  @                      purpose is designed                 ‘etty  or     pier is              designed               in              :
                         and constructed in a                , ons stent with the               accordance          with
                         way to ensure it is                following                          engineering standards
                         able to support its                 standards—                         and   will support   the
                         intended        loads,                                                 intended     loads    as
                         having regard to its                (a)  subject       to              defined      by      the
                         relevant       loading                    paragraph (d),               appropriate    standard
                        matters.                                  a jetty or pier               {refer  to  Engineering
                                                                  accessible    to              Certificate           at               ;
                                                                  vehicular _ traffic           APPENDIX EIGHT).                     os.
                                                                   is   able    to
                                                                   support at least
                                                                   a live load of
                                                                   3.01(17a   plus
                                                                   an axle load of
                                                                   101N;
                                                             {b)   subject      to
                                                                   paragraph   (qd),
                                                                   a jetty or pier
                                                                   that   is   not

              ©       ao                         re                                                            Page .38           ag
.                emanate —                 _   Response to Information Request                                        stg     ow Re
                       LEGAL         .    i          Pe       tg                                                       .          ah,
                           .           ”   a       *    _   ° Pa   ‘              -                                                  a

Section 43

"ee     ae                  Tae           eM                                                    ae

             a                                                                                                                     a
                                                                                                                 Fajod               .
                                                               RESPONSE TO INFORMATION REQUEST                  Foch                ;
                                                                                                                                    >
                                                                                                                                    .
                                                                   accessible   to                                                    ¥
                                                                   vehicular                                                         rt
                                                                   traffic and that                                                 -
                                                                   is for individual
                                                                   use is able to
                                                                   support at least
                                                                   a live load of
                                                                   2.01cPa;
                                                             (c)   subject      to
                                                                   paragraph (qd),                               oR
                                                                   a jetty or pier                           :    Lge
                                                                   that   is   not                         Sa
                                                                   accessible   to                          ea
                                                                   vehicular                                    ;    ‘
                                                                   traffic and that
     oO                                                            is  for  group
                                                                   use is able to                                                    gg
                                                                   support at least                                          oe
                                                                   a live load of                                         # ete ek
                                                                   3.0kPa;                                                 aera
                                                                                                                           7      sot hy
                                                              (d)  if a  relevant                                                  ee
                                                                   planning                                                           ,
                                                                   scheme
                                                                   standard      is
                                                                   more — stringent
                                                                  than         the
                                                                   standard
                                                                   mentioned — in
                                                                   paragraph (a),
                                                                   (b) or (c}—the                                      .              os
                                                                   relevant                                                       See
  :                                                                planning                                                     4a. #
                                                                   scheme                                                     rcs
                                                                   standard,    to                                              od
                                                                   the extent it is                                          an
    O                                                              more stringent                                          a       ME
                                                                   than        the                                      | eRe .
                                                                   standard                                                .
                                                                   mentioned — in
                                                                   paragraph (a),
                                                                   (b) or (c).                                                        '
                $016.2     Prescribed tidal work | PS16.2 = (s 6(2) solution)        PS16.2     Strand         Gardens             |
      ,                    that is a jetty or pier                       .                      submits the prescribed              8
mo                         and for a non-private              The tr assign f ane               tidal work is not for              +t
  aa                       purpose is designed                cons “ on or       e              commercial          use,             a,
                           and constructed in a                Oo WY stent end the              therefore   SO16.2_    is
                           way to ensure it is               following                          not applicable.
                           able to support its                standards—
  ;                        intended        loads,
   ;                       having regard to its               (a)  subject       to
   .                       relevant      loading                    paragraph (c),
  !                        matters.                                a jetty or pier                                                    ;
                     _-                                            accessible __ to                                                 a

                   :        :                                                                                                   A ote
      4         ©:      yuu                   yt             ‘A           .                                    Page39      °°.       sx
 .                 emanate                     _- Response to Information Request                                            a
   oo                    CEGAL           Log        mg                    oe  -                                         2        O
                                         '                *               ‘      fC

Section 44

-             ”                 ¢   oa        .                                           .

                                                                                                                  Pte                 4
                                                             RESPONSE TO INFORMATION REQUEST                      FIED              a)
                                                                                                                                     ws
                                                                                                                                     r,

                                                                   vehicular traffic                                                 }
                                                                   is   able    to                                                    te
                                                                   support      at                                                     :
                                                                   least       the
                                                                   following-
                                                                   (i) a distributed
                                                                      live load of
                                                                      5.0kPa;
                                                                  (ii)a                                         oo,
                                                                      concentrate                        .          ke
                                                                      d live load of                          oe.
                                                                      4.5KN;                              a      *    -
                                                                   {iii)the toad of                                        oo
                                                                      the   largest
    @                                                                 vehicle                                                   Hg
                                                                      capable    of                                                 “at
                                                                       being on or                                               ge
                                                                       moored   at                                         -      ;
                                                                      the jetty or                                                  oh
                                                                       pier;
                                                              (b)  subject      to
                                                                   paragraph (c),
                                                                   a jetty or pier
                                                                   not accessible
                                                                   to  —_- vehicular
                                                                   traffic is able to
                                                                   support at least                                                   Pr
                                                                   the following-                                                   rer
                                                                   (i) a distributed                                            eo
                                                                       live toad of                                            Ny
                                                                       5.0kPa;                                               ae
                                                                   (ii) a                                                     Op
     @                                                                concentrate                                            vo
                                                                       d live load of                                     eg
                                                                       4.5kN;
                                                              (c)   if a  relevant
                                                                    planning
                                                                    scheme
                                                                    standard     is                                                   ie
                                                                    more stringent                                                   -
 ,                                                                  than        the                                                  &
*                                                                   standard                                                          *
                                                                    mentioned    in                                                  a
                                                                    paragraph   (a)
                                                                    or    (b}—the
                                                                    relevant
                                                                    planning
                                                                    scheme
                                                                    standard, to the
                                                                    extent   it  is                                                   .
                                                                    more stringent                                                    fa

               ©                oy                                                                             Page 40            oS
                   emanate |                 -, Response to Information Request                                              (ae   Ae
                    ;    LEGAL  ©        Bg                      i    ne                                                          +
                               oo         :  ‘  a       oy Le _* wk           . ay                                                 .%

Section 45

a
                                                                                                                 r
                                                               RESPONSE TO INFORMATION REQUEST                  Fac                  ’

                                                                                                                                      |
                                                                  than        the                                                     ‘
                                                                  standard                                                          om
                                                                  mentioned = in
                                                                   paragraph   (a)
                                                                  or (b).

               $016.3     Prescribed tidal work | PS16.3.    The    design    and|PS16.3        Strand Garden submits
                          that is a jetty or a pier          constuction of the                 the   prescribed _ tidal
                          is   designed     and              jetty  or   pier   is             work       has     been
                          constructed in a way               consistent with the                designed and certified
                          to ensure it remains               following                          by   an   appropriately
                          above water at all                 standards—                         qualified engineer so
                          times.                                       .                        that the jetty is above
                                                             (a)   subject  h   to              the water on highest
   @                                                             (b), either.                   astronomical tide.
                                                                   (i) the level of
                                                                      the deck of                                                  .
                                                                      a  jetty  or                                                   ‘
                                                                      pier  is  at
                                                                      least
                                                                      300mm
                                                                      above    the
                                                                      water     at
                                                                      highest
                                                                      astronomic
                                                                      al tide; or
                                                                  (ii) piles    or
                                                                      other                                                          4
                                                                      markers
                                                                      indicate the                                              .
                                                                      presence of                                                 cos
                                                                      the jetty or                                                  ‘
                                                                      pier when it                                                   4
    ©                                                                 is                                                            ”
                                                                      inundated;                                                   -
                                                              (b)  if a   relevant
                                                                   planning
                                                                   scheme
                                                                   standard      is
                                                                   more stringent                                                     '
                                                               _   than        the
                                                                   standard                                                           m
:                                                                  mentioned — in
                                                                   paragraph
                                                                   (a}the
                                                                   relevant
                                                                   planning
                                                                   scheme
                                                                   standard,    to
                                                                   the extent it is
                                                                   more stringent                                                     ;
                                                                   than        the                                                    :
                                                                                                                     .               4
                                                                                                                                     ”
;     °         ©             .                                                                               Page 41            .
                   emanate                       Response to Information Request                                                a
                         LEGAL        .         ‘                                     :                                          co
                                                  _                                                                                ‘hod

Section 46

.                                                   a s:

                                                                                                                Gl             .
                                                             RESPONSE TO INFORMATION REQUEST               FEE

                                                                standard                                                       .
                                                                mentioned    in
                                                                paragraph (a).

               $016.4     Prescribed tidal work | PS16.4 = (s 6(2) solution)     PS16.4     Strand        Gardens
                          that is a jetty or pier                    .                      submits the prescribed
                          and  for  a_ private             ree  ee ot ane                   tidal work  has   been
                          purpose is designed              ‘etty  or    ier  is             designed             to
                          and constructed in a             ‘ orsistent oon the              complement         the
                          way to ensure it is of          following                         adjacent house whilst
                          a size suitable for              standards—                       being mindfall of the
                          maritime use while                                                amount of tidal water
                          still minimising the             (a)  subject      to             occupied.
                          amount    of _ tidal                  paragraph  (b),             It is noted  the jetty
     O                    water occupied by it.                 ances siatty                width is 1.5m wide and
                                                                or pier have a              does not exceed the
                                                                width   of   at             recommended     3m   in|.           i
                                                                                            the policy .              So EG
                                                                least  900mm                                    /       sot es
                                                                and not more                Refer to MSQ approval       oA     a
                                                                than 3m;                    at APPENDIX ONE.                  “3
                                                           (b)  if a_  relevant
                                                                planning
                                                                scheme
                                                                standard     is
                                                                more _ stringent
                                                                than        the
                                                                standard
                                                                mentioned — in
                                                                paragraph
                                                                (a}—the
                                                                relevant
                                                               planning
                                                                scheme                                                         a
     O                                                          standard,    to                                                oS
                                                                the extent it is                                               .
                                                                more stringent
                                                                than       the
                                                                standard
                                                                mentioned    in
                                                                paragraph (a).

  7            $017.1     The    design    and   |PS17.1   (s6(2)solution)       PS17.1 = Strand          Gardens               7
.                         construction     of              The    design   and              submits the prescribed              :
                          prescribed tidal work            construction of the              tidal work is not for a
                          that is a pipeline, or            ineli                           pipeline    or     any
                          another                           nd Ine    d     OF              underground _ service,
                          underground service              S consistent with                therefore  SOQ17.1   is
                          used   instead of a              the followin                     not applicable.
                          pipeline, does   not                        g
                          adversely affect the             standards—
                          ability of vessels to                     .
                          be anchored near the             (a)  subject      to

               ©                              co                                                         Page 42             oS
                  emanate                      Response to Information Request                                              bat

Section 47

aR                ;
                                                              RESPONSE TO INFORMATION REQUEST                 getag

                         work.                                   paragraph   (b),
                                                                 a   pipeline or
                                                                 other
                                                                 underground
                                                                 service       is
                                                                 installed    at
                                                                 least     1.2m
                                                                 below       the
                                                                 surface of land,
                                                                 after   it    is
                                                                 installed;
                                                            (b)  if  a  relevant
                                                                 planning
                                                                 scheme
                                                                 standard      is
    @                                                            more _ stringent
                                                                 than        the                                                   ;
                                                                 standard                                                       mo
                                                                  mentioned — in                                        oak
                                                                  paragraph                                             oT
                                                                 (a}-the                                                   Yo
                                                                 relevant                                                ee
                                                                  planning                                                 oN
                                                                 scheme                                                       .
                                                                  standard,    _to
                                                                 the extent it is
                                                                  more stringent
                                                                  than       the
                                                                  standard
                                                                  mentioned — in
                                                                  paragraph (a).

               $018.1     Prescribed tidal work | PS18.1 — (s 6(2) solution)       PS18.1     Strand         Gardens
                          that is a pontoon, for                       .                      submits the prescribed              4
    @                     a   private purpose,              wee eee ot ane                    tidal   work    for   a             -
                          and not used only for               ontoon is consistent            pontoon    has    been               4
                          rowing,  is designed                th   the  followi               designed    to  support
                          and constructed in a              stan dar. ic   owing              the   intended    loads
                          way to ensure it is                                                 being for private use.
                          able to support its               (a)   subject      to
                          intended       loads,                   paragraph  (c),             .
                          having regard to its                    a  pontoon for                                                  we
                          relevant      loading                   individual use is                                             ay
                          matters.                                able to support                                                 -
a                                                                 at least a live                                                 -
:                                                                 load of 1.5kPa;
                                                             (b}  subject      to
                                                                  paragraph  (e),
                                                                  a pontoon for
                                                                  group  use   is
                                                                  able to support
                                                                  at least a live
                                                                  load         of
                                                                  2.0kPa;                                                          "

               ©            moa,           rr                                                               Page 43                é
                  emanate              .. *     Response to Information Request                                                 re
             a            ee                                                                                                     ot

Section 48

|                                                    te
         a                                                                                                                        :
                                                                                                              ett              “4
                                                           RESPONSE TO INFORMATION REQUEST                    och                x
                                                                                                                                ae

                                                         (c)   if a   relevant                                                    x
                                                               planning
                                                               scheme
                                                               standard      is
                                                               more   stringent
                                                               than        the
                                                               standard
                                                               mentioned — in
                                                               paragraph    (a)
                                                               or     (b}—the
                                                               relevant
                                                               planning
                                                               scheme
                                                               standard, to the
                                                               extent   it   is
©                                                              more stringent
                                                               than        the
                                                               standard
                                                               mentioned     in
                                                               paragraph    (a)
                                                              or (b).

           $018.2      Prescribed tidal work | PS18.2 —_ (s 6(2) solution)       PS$18.2  = Strand         Gardens
                       that is a pontoon, for                       .                       submits the prescribed
                       a non-private purpose,             ne      ae of ane                 tidal   works    for   a
                       and not used only for               ontoon is consistent             pontoon is for private
                       rowing,  is  designed               th   the   _followi              use, therefore $018.2
                       and constructed in a               wl      e    following            is not applicable.
                             ;          a:                standards—
                       way to ensure it is                                                                                      ’
                       able  to  support  its             (a)  subject       to
                       intended       loads,                   paragraph (c), a                                                  -
                       having regard to its                    pontoon   open                                                      ;
                       relevant      loading                   for use by the
                      matters.                                 general   public
 O                                                             or used for a                                                      ‘
                                                               commercial!
                                                               purpose is able
                                                               to  support   at
                                                               least       the
                                                               following-
                                                               (i) a distributed
                                                                   live load of                                                   .
                                                                   301(1°a
                                                                (ii) a                                                            *
                                                                   concentrated
                                                                   live load of
                                                                   4.5kN;
                                                           (b)  subject      to
                                                                paragraph (c), a
                                             ,                  pontoon — other
                                                                than a pontoon
                                                                mentioned —_ in

         TT                                                                                                                    re
            © -                        be              So                                                  Page44     2.
               emanate       .     _         Response to Information Request                                               (a
                     LEGAL ,            “os  ..   an       eo                                                               OW
                               Lo       #.          a                                                                           .

Section 49

fog
             a
                                                                                                                  aa               .
                                                                RESPONSE TO INFORMATION REQUEST                  Fa

                                                                   paragraph    (a)
                                                                   is    able    to                                                    .
                                                                   support       at
                                                                   least       the
                                                                   following-
                                                                   (i} a distributed
                                                                       live load of
                                                                       2.0kPa;
                                                                   (i) a
                                                                       concentrated
                                                                       live load of
                                                                       4.5kN;
                                                              (c)  if  a  relevant
                                                                    planning
    @                                                              scheme
       :                                                           standard      is                                        e         an
                                                                    more — stringent                                       peer       gy
                                                                   than         the                                       s Ror        g
                                                                    standard                                               Poo ge
                                                                    mentioned —  in                                        -        se
                                                                    paragraph (a) or                                         *
                                                                    (b)}—-the
                                                                    relevant
                                                                    planning
                                                                    scheme
                                                                    standard, to the
                                                                    extent it is more
                                                                    stringent  than                                                    .
                                                                    the   standard                                                  ek
                                                                    mentioned — in                                                 a
                                                                    paragraph   (a)                                                Sai
                                                                    or (b).                                                          ty

    ®          $018.3      Prescribed tidal work | PS18.3 _ (s 6(2) solution)         PS18.3     Strand         Gardens              2
                           that is a pontoon and                         .                       submits the prescribed              7
                           used only for rowing               The   ao         ane               tidal   work    for    a
                           is   designed     and                       .      .                  pontoon is not soley
                                       :                      pontoon is consistent                       .
                           constructed in a way               with   the  following              for  rowing,   therefore
                           to ensure—                         standards—                         $018.3       is      not
                                ao:                                                              applicable.
                           (a)  it  5 able     to             (a)   subject      to
                                Suppo         its                                                                                      7
+                               intended   loads,                   paragraph ic.                                                      ,
                                having regard to                    walkway   of  a                                                  *
                               its       relevant                   pontoon    used
                                loading matters;                    only for rowing
                                and                                 is   able    to
                           (b)  it  is  safe  for                   support at least
                                persons —_ using                    a live load of
                                the  pontoon   to                   3.0kPa;
                                launch       and                                .
                                retrieve  rowing             (b) the     floatation
                                vessels.                            unit    of    a

                ©                              oe                                                              Page 45                “
                   emanate                 “.    .Response to Information Request                                                    .
                         LEGAL |       nyiet oye ba,                                                                            Lath:
                              -         a       og  oe      .                                                                      ae
                                         tea                                                                                          i,

Section 50

Prey              a
                                                        RESPONSE TO INFORMATION REQUEST                FAC

                                                                                                                   |
                                                            pontoon   used                                                  .
                                                            only for rowing
                                                            is   able   to
                                                            support     at
                                                            least  a_  live
                                                            load        of
                                                            1.5kPa;
                                                      (c)   if a  relevant
                                                            planning
                                                            scheme
                                                            standard     is
                                                            more stringent
                                                            than       the
                                                            standard
                                                            mentioned — in
                                                            paragraph   (a)
@                                                           or    (b} the
                                                            relevant                                               ’    a,
                                                            planning                                            omen: —
                                                            scheme                                                De a
                                                            standard, to the                                          eo
                                                            extent   it  is                                            7
                                                            more stringent
                                                            than       the
                                                            standard
                                                            mentioned    in
                                                            paragraph   (a)
                                                           or (b)

          $018.4     Prescribed       tidal | PS18.4 = (s 6(2) solution)     PS18.4     Strand        Gardens
                     work    that   is  a                        :                      submits access to the
                      pontoon is designed              re rect     of ane               pontoon is via_ stairs
                     and constructed in a                      :     .                  {refer to  APPENDIX
                                                       pontoon is consistent
                     way to ensure any                 with  the  following             SEVEN)
@                     load applied to the              standards—                                                        a
                      pontoon by a person                                                                                of
                      or  thing   on   the             (a)  subject     to              The pontoon has been            /
                      pontoon   does   not                  paragraph (f),              designed and will be
                      cause the pontoon to                  a    pontoon's              constructed so that the       an
                      tip over or tilt to a                 access                      pontoon
                      degree  causing  the                  walkway                     accommodates       the      ote
                      person or thing to fall               extends     at              intended   loads   and     Try
                     off the pontoon.                       least  500rnm               ensures        stability | 9 fo...
                                                            onto        the             through  its floatation         an
                                                            pontoon's                   device  to  avoid  any         ato
                                                            floatation unit;            tilting that may cause          7
                                                                .                       persons or material to
                                                       (5)  areaph to                   fall off the pontoon.
                                                            (f),         a
                                                            pontoon's
                                                            access
                                                            walkway      is                                                 .
                                                            constructed                                                    :
                                                            with a material                                             Oe

           ©                        .                                                                Page 46    .     7. OF
              emanate               -      Response to Information Request                                      Qoot,
                    LEGAL         wee e-                                                                           ot ‘. aos

Section 51

Ltr.                 ,
                                                               RESPONSE TO INFORMATION REQUEST                  Fach

                                                                                                                                      |
                                                                  that   has    a
                                                                  non-slippery
                                                                  surface;
                                                             (c)  for a pontoon
                                                                  used only for
                                                                  rowing—
                                                                  subject       to
                                                                  paragraph    {(f),
                                                                  at least 75mm
                                                                  of the   height
                                                                  of          the
                                                                  pontoon's
                                                                  floatation  unit
                                                                  remains
                                                                  above       the
                                                                  water      over
    @                                                             which     it  is                                             ;
                                                                  constructed if a                                             ;
                                                                  distributed live                                                   ev
                                                                  load is applied
                                                                  to half of the
                                                                  surface of the
                                                                  pontoon's
                                                                  floatation  unit
                                                                  and all of the
                                                                  surface of the
                                                                   pontoon's
                                                                  access
                                                                  walkways;
                                                             (d)  for a pontoon                                                  ie
                                                                   other  than  a                                                  oy .
                                                                   pontoon                                                         ey
                                                                   mentioned — in                                                 uh
  ,                                                                paragraph                                                     a 4 ‘
“                                                                  (c)}—subject                                                   ak “
   @                                                               to  paragraph                                                     :
                                                                   (f), the    top                                            oF ae
                                                                   surface of the                                            ys
                                                                   pontoon's                                                    as 5
                                                                   floatation unit                                                 mo
                                                                   remains                                                        tn  j
                                                                   above       the                                                 a
                                                                  water      over                                                 tt
 ‘                                                                 which    it  is                                            -  gee
                                                                   constructed _ if                                                 oe
:                                                                  a__  distributed                                                 Ty
                                                                   live  load   of                                                  oo
                                                                   1.5kPa       is
                                                                   applied to half
                                                                   of the surface
                                                                  of           the
                                                                   pontoon's
                                                                   floatation unit
                                                                   and all of the
                                                                   surface of the                                                   a

               ©                                                                                              Page 47              2
            .    , emanate                       Response to Information Request                                                oy gene
              .                         a                 vo  .                                                               ‘   7 Miagt
            Reo    °  .          . “          .f  .                                                                             *   ae

Section 52

AG                 ‘
                                                            RESPONSE TO INFORMATION REQUEST                Fac

                                                               pontoon's
                                                               access
                                                               walkways;
                                                          (e)  subject      to
                                                               paragraph   (f),
                                                               the whole base
                                                               of the pontoon's
                                                               floatation —_ unit
                                                               remains      in
                                                               contact    with
                                                               the water over
                                                               which    it  is
                                                               constructed at
                                                               all times and
                                                               tits  no  more
                                                               than   15°   at
    @                                                          any time;                                               ;        .
                                                          (f)   if a relevant                                           Ss
                                                                planning                                             Set
                                                                scheme                                                    ct
                                                                standard     is                                                 .
                                                                more stringent
                                                                than       the
                                                                standard
                                                                mentioned _ in
                                                                paragraph (a),
                                                                (b), {c), (d) or
                                                                (e} the
                                                                relevant
                                                                planning
-                                                               scheme                                                         4
                                                                standard,   to                                                 a.
                                                                the extent it is                                               a
                                                                more stringent                                                 r
                                                                than       the                                               aay
.  @                                                            standard                                                    a
                                                                mentioned   in                                             my
                                                                paragraph (a),                                          .    op
                                                                (b), (c), (d) or                                         an
                                                                (e).                                                       “om [
.              $018.5     Prescribed tidal work | PS18.5   The   design    and|PS18.5       Strand        Gardens           er
                         that is a pontoon is              construction of the              submits the prescribed           af
                          designed        and              pontoon is consistent            tidal  work    for   a] —        —
                          constructed in a way             with  the — following            pontoon    has   been            a
                          to ensure it remains             standards—                       designed   accordingly
                          above the water at                        .                       so that it remains no
                          all times.                       (a)  subject   h to              less than 300mm above
                                                               (ib).       the              the water at high water
                                                                   '    \                   mark at all times (refer
                                                                pontoons                    to APPENDIX SEVEN)
                                                                abutment     is
                                                                located no less
                                                                than    300mm                                                  .

               ©                                                                                         Page 48            wot
                  emanate                     Response to:Information Request                                             SAS
              .                            .                  nae     oh                                                    3

Section 53

Fajet
                                                             RESPONSE TO INFORMATION REQUEST                FACr             _   3

                                                                above the water                                               .
                                                                at high water
                                                                mark;
                                                           (b)  if a   relevant
                                                                planning
                                                                scheme
                                                                standard     is
                                                                more   stringent
                                                                than        the
                                                                standard
                                                                mentioned — in
                                                                paragraph
                                                                (a}—the
                                                                relevant
                                                                planning                                             .
                                                                scheme                                                         .
    O                                                           standard,    to                                              tt
                                                                the extent it is                                      ee      ae
                                                                more stringent                                        oe
                                                                than        the                                      pa       oe
                                                                standard                                                Oe
                                                                mentioned — in                                       *         os hy
                                                                paragraph (a).

               $018.6     Prescribed tidal work | PS18.6   The    design   and   |PS18.6    Strand         Gardens
                          that is a pontoon is             construction of the              submits the prescribed
                          designed        and              pontoon is consistent            tidal   work    for   a
                          constructed in a way             with  the   following            pontoon     has   been
                          to    ensure     the             standards—                       designed    to  ensure
                          pontoon's  floatation                                             that the floatation unit
                          unit will rise and fall           8)  Or tod ner                  rises and falls with the
                          to allow for changes                   Ocaled  In an              changes in tidal water
                          in tidal water levels                 area prone to               levels
                                                                flooding—                         ,
                                                                 subject     to                                           ;      "
    O                                                            paragraph (c),                                                o
                                                                 the  pontoon's
                                                                floatation  unit
”                                                                is moored by
                                                                 piles;
                                                            (b)  for a pontoon
                                                                 other  than  a                                                 a
                                                                 pontoon                                                       rd
                                                                 mentioned — in
                                                                 paragraph                                                       :
                                                                 (a)—subject to
                                                                 paragraph (c),
                                                                 the pontoon's
                                                                 floatation unit
                                                                 is-
                                                                 (i) attached,
                                                                    through the                                                 2
                                                                   pontoon’'s                                                  n,
                                                                    system _ for                                               *
                                       CC 0                         Io                                                      Pa   8
               © .                  oo                                      ne                           ,Page4Q      2    84
          .  .   oeMmanate.      . | .-    ~:. Response to Information Request                                Lo         ee,
                        REGAL                    oS         -            oe                             rot      mR
       Dee        .      Toe an   - -    "Ley               moe,       7              coe                +,       I           ‘ts

Section 54

AR
                                                             RESPONSE TO INFORMATION REQUEST                 gatag

                                                                   mooring the
                                                                   unit,     to
                                                                   concrete
                                                                   anchors    in
                                                                   the    bank
                                                                   landward
                                                                   of       the
                                                                   pontoon; or
                                                                (ii) moored
                                                                    by piles;                        6     ;
                                                           (c)  if  a  relevant                         oat
                                                                planning                             so
                                                                scheme
                                                                standard      is
                                                                more. stringent
  @                                                             than        the
                                                                standard                                                      ty
                                                                mentioned — in                                         WO     ats
                                                                paragraph (a)                                           et
                                                           or (b)}—the relevant                                       we        TY
                                                           planning     scheme                                              ‘a aed
                                                           standard,   to   the                                                   4
                                                           extent  it  is more                                                    Ah
                                                           stringent  than  the
                                                           standard mentioned
                                                           in paragraph (a) or
                                                           (b).

              $019.1     Prescribed      tidal | PS19.1 = (s 6(2) solution)       PS19.1     Strand         Gardens
                         work    that   is   a             The    design    and              submits the prescribed
                         retaining       wall,             construction of the               tidal work is not for a               .
                         revetment          or            retaining       wall               retaining           wall
                         seawall, is designed              revetment or seawall              revetment or seawall,                .*
   @                     and constructed in a              is  consistent  with              therefore   SO19.1_   is            -
                         way to ensure it is               the        following              not applicable.                     *
                         able to support its               standards—                                                            TH,
                         intended       loads,
                         having regard to its              (a)   subject      to
                         relevant      loading                   paragraph (b), a
.                       matters                                  retaining wall,
 s                                                               revetment — or
                                                                 seawall is able                                                 ra
                                                                 to support   at                                  ,
                                                                 least        a                                                 7
                                                                 distributed live
                                                                 load of 3.0kPa;
                                                ,          (b)   if a   relevant
                                                                 planning
                                                                 scheme
                                                                 standard     is                                                   .
                                                                 more   stringent                                                 os
                                                                 than        the                                                 2
                                                                                                                                  “A
                                                                                                                          .      oo
              ss ——S                  SS                                                                                      2   a
              ©                                                                                            Page 50         —     AF
                 emanate        .              Response to Information Request                                                OG
                              oy                ®       Coo             woe    :                                                 a,

Section 55

TEE
                                                              RESPONSE TO INFORMATION REQUEST                 jatag

                   RR              . a              .        :    .   ~ Po om. .
                                                                 standard
                                                                 mentioned — in
                                                                 paragraph
                                                                 (a}—the
                                                                 relevant
                                                                 planning
                                                                 scheme
                                                                 standard,    to
                                                                 the extent it is
                                                                 more stringent
                                                                 than        the
                                                                 standard
                                                                 mentioned    in
                                                                 paragraph (a).

    @          $019.2     Prescribed      tidal | PS19.2    —_(s 6(2) solution)   PS19.2      Refer to SO19.1.
                          wor     that   is  i              The    design   and
                         fe vet  ent       en               construction of the                                         a
                                   :     .                  retaining      wall,                                            ee
                          seawall, is designed              revetment or seawall                                         Be
                          and constructed in a              is  consistent  with                                             mt
                          way to ensure it can              the        following
                         withstand—                         standards—
                          (a)  any tendency of              (a)  subject      to
                               Sliding. avd or                   paragraph (c), a
                                     ’                           retaining wall,
                          (b)  any other effects                 revetment    or
                               of   waves    of                  seawall has a
                               changes in water                  factor of safety                                                 :
                               levels  on   the                  of no less than                                                a
                               retaining  wall,                  1.5;
                               revetment     or             (b)  subject      to                                                a
                               seawal.                           paragraph (c), a
    @                                                            retaining  wall,                                               fm
                                                                 revetment = or                                                ae
                                                                 seawall is able                                                 =
                                                                 to    withstand
                                                                 the   effect of
                                                                 waves,       or
                                                                 waves      and
                                                                 water    levels,
                                                                  resulting from
:                                                                 a   storm   or                                                   ‘
                                                                  other   natural                                                  ;
                                                                  event   of   a
                                                                  magnitude
                                                                  that has a 2%
                                                                  or       lower
                                                                  probability — of
                                                                  occurring — in
                                                                  any   calendar
                                                                  year;
                                                             c)   if a_ relevant

               ©                           .                                                                Page 51            ng
                  emanate                    »  Response to Information Request                                           re
            :                        "3   a                                                                                -   cf. ~~

The text continues on section 56.

Used in these records

About this file

File size
7.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001A333D.001.pdf · 7.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.