Council archive · source document
001A333D.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
Le
RESPONSE TO INFORMATION REQUEST Pa ;
paragraph (a)
or (b);
(d) any other
relevant
planning
scheme
standard that is
not inconsistent
with the
standards
mentioned in
paragraphs
(a) to (c).
oO $01.2 Prescribed tidal work | PS1.2 The design and | PS1.2 Strand Gardens
in a canal and for a construction of the submits the prescribed
non-private purpose prescribed tidal work tidal works are not for .
is compatible with its is consistent . with commercial purposes
location, having the following therefore S$O1.2 is it
regard to the standards— not applicable.
following— (a) subject to
(a) the character and paragraph (c),
amenity of the prescribed tidal
work's immediate work used for
surroundings and a commercial
the locality within purpose does
which the work is not extend
located; past the side
. boundary or
(b) Nanning rerevant extended side
states the boundary of the
. lot connected
desired
to the
character or work:
O amenity for the , .
work's {b) subject to
immediate paragraph (c),
surroundings or prescribed tidal
the locality within work is not .
which the work roofed unless it
is located—the is the main ~
stated desired access to .
character or land; .
amenity. (c) if a relevant Sy
planning
scheme
standard is
more stringent
than the
standard
mentioned in
paragraph (a)
or {b}—the
relevant ‘
ou © ., . : , z Page 7 ds
r : emanate _ Response to Information Request “4
. LEGAL : a has a , oeSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A333D.001.pdfRelated documentPublic source context ↗
08/1704 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.