Skip to the record
Accept no imitations.

Council archive · source document

001A333D.001

of 114

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

a
                                                               RESPONSE TO INFORMATION REQUEST                 FE   Hh]

                                                                                                                                   |
               $012.4     Prescribed tidal work | PS12.4     The    design   and|PS12.4 = Strand              Gardens               ¥
                          is   designed     and              construction of the               submits that Australian              *
                         constructed      using              prescribed tidal work             Standard relevant to the              ‘
                          materials  having   a              is consistent with the           materials,      will   be              :
                          long life in  marine               following                         followed, or measures
                          environments,                      standards—                        will be taken to treat
                          having regard to their                      .                        materials used, for the
                          ability to resist the              (a)  subject   h  A               jetty/ pontoon,  to the
                          following—                              ea          (0),             extent the requirements
                                                                  each                         stated in the Australian
                          (a) attack         by                  Australian                    Standard     appl
                               marine                             Standard                     .             pply    to
                               organisms;                         relevant to the              jetty/pontoon  that _'S
                                           '                      materials _ that             located   in  a  marine
                           (b) corrosion;                         should be used,              environment.
                           {c) deterioration                      or           the
     OQ                        resulting   from                    measures that
                               abrasion       or                   should      be
                               immersion      in                  taken to treat
                               seawater.                          materials                                                  "
                                                                   used,       for
                                                                   structures,  to
                                                                   the extent the
                                                                   requirements
                                                                   stated  in the
                                                                   Standard apply
                                                                   to   structures
                                                                   located  in  a
                                                                   marine                                                          .
                                                                   environment;                                                   va
                                                             (b)   if a   relevant                                                 “
                                                                   planning                                                      ook
                                                                   scheme                                                           .
                                                                   standard     is                                                   ‘
                                                                   more _ stringent                                                  “
     O                                                             than        the                                                 a
                                                                   standard                                                        ~
                                                                   mentioned    in
                                                                   paragraph
                                                                   (a}—the
                                                                   relevant
                                                                   planning
"                                                                  scheme                                                            .
                                                                   standard,    _to                                               oy
  a                                                                the extent it is                                               s
                                                                   more stringent
                                                                   than        the
mL                                                                 standard
                                                                   mentioned    in
                                                                   paragraph (a).

                $012.5     Prescribed tidal work | PS12.5     The    design   andj}  PS12.5     Strand         Gardens
                           is    designed    and              construction of the               submits     that    the
                           constructed in a wa                prescribed tidal work             prescribed tidal works
                                                                                                                                    F
            —   ©                          oe                                                                 Page 23             ga
                   emanate                  _:"  Response to Information Request                                 9     yo
                         LEGAL          we        ge          ve     og    eo,                                                   Aye
                                         - 4              £     .  ia     .  . ~                                                    wh

Used in these records

About this file

File size
7.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001A333D.001.pdf · 7.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.