Council archive · source document
001A333D.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
Ln aa r
RESPONSE TO INFORMATION REQUEST Fach .
:
in the design or Rel PI . +
construction of construction of * Relvanat Planning t
the work; or structures Scheme standard.
. under, within or
(b) disturbance to over tidal water,
the sediment on to the extent
the bed and
banks of the the .
tidal water; or requirements
’ stated in the
(c) exposure to Standard
acid sulphate are
soils. directed at
maintaining the
water quality of
tidal water;
O (b) if a relevant
planning
scheme
standard is
more stringent *
than the
standard
mentioned — in
paragraph
(a}the
relevant
planning
scheme
standard, to :
the extent it is oo
more stringent .
than the -
standard .
mentioned — in .:
O paragraph (a).
$012.7 ‘Prescribed tidal work | PS12.7_ The design and }PS12.7 Strand Gardens
is designed and construction of the submits prescribed
constructed in a way prescribed tidal work tida! work has been
to ensure it is safe is consistent with designed especially for
for persons standing the following the Land and been
or walking on the standards— certified by an s
. work. . appropriately certified vat
. (a) arora h fc) engineer to ensure Jf
me grap f safety for all persons .
any Stat during and after
ook on which construction (refer to
: a person may Engineer Certificate at
APPENDIX EIGHT)
stand or walk
. is-
(i) not
slippery 7
;_and
se © aed , Page25 —° # +
emanate - . * Response to Information Request
a ye * . *,See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A333D.001.pdfRelated documentPublic source context ↗
08/1704 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.