Council archive · source document
001A333D.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
2
Fejna |
RESPONSE TO INFORMATION REQUEST PAE «
{ii) does not “
have any ;
feature !
that may
cause the
person to
trip or fall;
{b) subject to
paragraph (c),
any part of
prescribed
tidal work that
is unsafe for
persons
standing or
© walking on the
work is
surrounded by we
adequate 7 %,
barriers to ;
deter persons
from entering
the part;
(c) if a relevant
planning
scheme
standard is
more stringent "
than the 7
standard ve
mentioned — in s
paragraph (a) “
or (b)—the °
. relevant %y
© planning ..
scheme
standard, to
the extent it is
more stringent
than the
standard ;
mentioned — in :
paragraph (a) .
or (b). .
$012.8 Appropriate PS12.8 The design and|PS12.8 Strand Gardens
measures are taken construction of the submits the prescribed
for prescribed tidal prescribed tidal work tidal work is for private
work for a non- is consistent with use, therefore $012.8
private purpose to the following is not applicable.
ensure an standards—
unsupportable live . ;
r . (a) subject to
. load is not applied to paragraph (b), :
mo, © - 0. kg oO sO, . Page 26 ae OES
oe emanate . _, . ” Response to Information Request Sf
: LEGAL ee coe POM bas ” wet
. ° on . ‘loos ’ oeSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A333D.001.pdfRelated documentPublic source context ↗
08/1704 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.