Council archive · source document
001A333D.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
ory r
; ob
re} .
RESPONSE TO INFORMATION REQUEST Fach cal
4
J
foundation aoe
support to ve :
support the “ . :
bridge _is t
erected or oy
placed in
the tidal
water; or <
(ii) otherwise—
only the
minimum
number of
foundation
supports
required to
@ support the
bridge is :
used; oe 4
(b) if a relevant oe
planning CN
scheme °
standard is
more stringent
than the
standard
mentioned _ in
paragraph
(a}—the of
relevant .
planning Lo
scheme ta
standard, to oo
the extent it is _
more stringent oy
@ than the "ty
standard sO
mentioned — in
paragraph (a).
$015.1 Prescribed tidal work | PS15.1 —_ (s 6(2) solution) PS15.1 Refer to SO12.10.
that is a boardwalk The design and .
or an independent construction of the 3
deck and for a private boardwalk or deck is
*e . purpose is designed consistent with the
and constructed in a following
way to ensure it is standards—
able to support its
intended loads, (a) subject to
having regard to its paragraph
relevant loading (d), a ,
matters boardwalk or
independent a
deck a
7 Oe A. ne Page 34. tng
emanate. Response to Information Request os
LEGAL . : ne a . .
' 2, : Se, .See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A333D.001.pdfRelated documentPublic source context ↗
08/1704 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.