Council archive · source document
001A333D.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
aR ;
RESPONSE TO INFORMATION REQUEST getag
work. paragraph (b),
a pipeline or
other
underground
service is
installed at
least 1.2m
below the
surface of land,
after it is
installed;
(b) if a relevant
planning
scheme
standard is
@ more _ stringent
than the ;
standard mo
mentioned — in oak
paragraph oT
(a}-the Yo
relevant ee
planning oN
scheme .
standard, _to
the extent it is
more stringent
than the
standard
mentioned — in
paragraph (a).
$018.1 Prescribed tidal work | PS18.1 — (s 6(2) solution) PS18.1 Strand Gardens
that is a pontoon, for . submits the prescribed 4
@ a private purpose, wee eee ot ane tidal work for a -
and not used only for ontoon is consistent pontoon has been 4
rowing, is designed th the followi designed to support
and constructed in a stan dar. ic owing the intended loads
way to ensure it is being for private use.
able to support its (a) subject to
intended loads, paragraph (c), .
having regard to its a pontoon for we
relevant loading individual use is ay
matters. able to support -
a at least a live -
: load of 1.5kPa;
(b} subject to
paragraph (e),
a pontoon for
group use is
able to support
at least a live
load of
2.0kPa; "
© moa, rr Page 43 é
emanate .. * Response to Information Request re
a ee otSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A333D.001.pdfRelated documentPublic source context ↗
08/1704 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.