Council archive · source document
001A333D.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
| te
a :
ett “4
RESPONSE TO INFORMATION REQUEST och x
ae
(c) if a relevant x
planning
scheme
standard is
more stringent
than the
standard
mentioned — in
paragraph (a)
or (b}—the
relevant
planning
scheme
standard, to the
extent it is
© more stringent
than the
standard
mentioned in
paragraph (a)
or (b).
$018.2 Prescribed tidal work | PS18.2 —_ (s 6(2) solution) PS$18.2 = Strand Gardens
that is a pontoon, for . submits the prescribed
a non-private purpose, ne ae of ane tidal works for a
and not used only for ontoon is consistent pontoon is for private
rowing, is designed th the _followi use, therefore $018.2
and constructed in a wl e following is not applicable.
; a: standards—
way to ensure it is ’
able to support its (a) subject to
intended loads, paragraph (c), a -
having regard to its pontoon open ;
relevant loading for use by the
matters. general public
O or used for a ‘
commercial!
purpose is able
to support at
least the
following-
(i) a distributed
live load of .
301(1°a
(ii) a *
concentrated
live load of
4.5kN;
(b) subject to
paragraph (c), a
, pontoon — other
than a pontoon
mentioned —_ in
TT re
© - be So Page44 2.
emanate . _ Response to Information Request (a
LEGAL , “os .. an eo OW
Lo #. a .See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A333D.001.pdfRelated documentPublic source context ↗
08/1704 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.