RESPONSE TO INFORMATION REQUEST Fa
paragraph (a)
is able to .
support at
least the
following-
(i} a distributed
live load of
2.0kPa;
(i) a
concentrated
live load of
4.5kN;
(c) if a relevant
planning
@ scheme
: standard is e an
more — stringent peer gy
than the s Ror g
standard Poo ge
mentioned — in - se
paragraph (a) or *
(b)}—-the
relevant
planning
scheme
standard, to the
extent it is more
stringent than .
the standard ek
mentioned — in a
paragraph (a) Sai
or (b). ty
® $018.3 Prescribed tidal work | PS18.3 _ (s 6(2) solution) PS18.3 Strand Gardens 2
that is a pontoon and . submits the prescribed 7
used only for rowing The ao ane tidal work for a
is designed and . . pontoon is not soley
: pontoon is consistent .
constructed in a way with the following for rowing, therefore
to ensure— standards— $018.3 is not
ao: applicable.
(a) it 5 able to (a) subject to
Suppo its 7
+ intended loads, paragraph ic. ,
having regard to walkway of a *
its relevant pontoon used
loading matters; only for rowing
and is able to
(b) it is safe for support at least
persons —_ using a live load of
the pontoon to 3.0kPa;
launch and .
retrieve rowing (b) the floatation
vessels. unit of a
© oe Page 45 “
emanate “. .Response to Information Request .
LEGAL | nyiet oye ba, Lath:
- a og oe . ae
tea i,See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A333D.001.pdfRelated documentPublic source context ↗
08/1704 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.