Council archive · source document
001A333D.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
AG ‘
RESPONSE TO INFORMATION REQUEST Fac
pontoon's
access
walkways;
(e) subject to
paragraph (f),
the whole base
of the pontoon's
floatation —_ unit
remains in
contact with
the water over
which it is
constructed at
all times and
tits no more
than 15° at
@ any time; ; .
(f) if a relevant Ss
planning Set
scheme ct
standard is .
more stringent
than the
standard
mentioned _ in
paragraph (a),
(b), {c), (d) or
(e} the
relevant
planning
- scheme 4
standard, to a.
the extent it is a
more stringent r
than the aay
. @ standard a
mentioned in my
paragraph (a), . op
(b), (c), (d) or an
(e). “om [
. $018.5 Prescribed tidal work | PS18.5 The design and|PS18.5 Strand Gardens er
that is a pontoon is construction of the submits the prescribed af
designed and pontoon is consistent tidal work for a] — —
constructed in a way with the — following pontoon has been a
to ensure it remains standards— designed accordingly
above the water at . so that it remains no
all times. (a) subject h to less than 300mm above
(ib). the the water at high water
' \ mark at all times (refer
pontoons to APPENDIX SEVEN)
abutment is
located no less
than 300mm .
© Page 48 wot
emanate Response to:Information Request SAS
. . nae oh 3See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A333D.001.pdfRelated documentPublic source context ↗
08/1704 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.