Fajet
RESPONSE TO INFORMATION REQUEST FACr _ 3
above the water .
at high water
mark;
(b) if a relevant
planning
scheme
standard is
more stringent
than the
standard
mentioned — in
paragraph
(a}—the
relevant
planning .
scheme .
O standard, to tt
the extent it is ee ae
more stringent oe
than the pa oe
standard Oe
mentioned — in * os hy
paragraph (a).
$018.6 Prescribed tidal work | PS18.6 The design and |PS18.6 Strand Gardens
that is a pontoon is construction of the submits the prescribed
designed and pontoon is consistent tidal work for a
constructed in a way with the following pontoon has been
to ensure the standards— designed to ensure
pontoon's floatation that the floatation unit
unit will rise and fall 8) Or tod ner rises and falls with the
to allow for changes Ocaled In an changes in tidal water
in tidal water levels area prone to levels
flooding— ,
subject to ; "
O paragraph (c), o
the pontoon's
floatation unit
” is moored by
piles;
(b) for a pontoon
other than a a
pontoon rd
mentioned — in
paragraph :
(a)—subject to
paragraph (c),
the pontoon's
floatation unit
is-
(i) attached,
through the 2
pontoon’'s n,
system _ for *
CC 0 Io Pa 8
© . oo ne ,Page4Q 2 84
. . oeMmanate. . | .- ~:. Response to Information Request Lo ee,
REGAL oS - oe rot mR
Dee . Toe an - - "Ley moe, 7 coe +, I ‘tsSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A333D.001.pdfRelated documentPublic source context ↗
08/1704 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.