Response to Not Properly Made Letter · OPW11/0043

of 7

Text shows just the words. Original shows the document exactly as it was published.

  PALL CWW


Excrusive £ifestvCe Residences
                                                                                                                   SCRC CORRESPONDENCE




   22nd March 2011                                                                       fox.
                                                                                                                   ^i911d11f:11^f^IdVV91^UV
                                                                                                                        60346258


   Chris Gibberd
   Sunshine Coast Council
   Locked Bag 72
   Sunshine Coast Mail Centre
   Queensland 4560


   Dear Chris,


   Application Number. OPW11 /0043
   RE: Development Permit for Operational Work - Prescribed Tidal Works
   Address: 29 Wyuna Drive, Noosaville


   In response to your letter dated 25th of February 2011, please note the followings:

       •      Outstanding application fee - client has now paid full outstanding fees directly to Council. / \ e q-lee In C
       •      State Owned Resource - please find enclosed notice from Ecoaccess - ref MCY2391                    1508
       •      Details addressing IDAS Coastal Protection and Management Regulation 2003, schedule 4A - please
              find enclosed document outlining how objectives have been satisfied.


   If you have any further enquires please contact our office.




   Regards,




   Nathan Kenzler




   Paul Clout Design P/L
   PO Box 152 Noosaville Qld, 4566
   Suite 4/44 Mary St Noosaville
   Phone: 07 5440 5388 Fax: 07 5440 5399


   Email: [email protected]




                                                                                                  ^^uX4^ -1
Full text of the other 6 pages

Page 2

  I            " L C=W u-F-
                                               b WE, 11101LIJ 1A                                                      116 Ut       M
                                                                                                                                   .-
ExcCusive Lifestyle Residences

                                                     29 Wyuna Drive, Noosaville
                                   Development Permit for Operational Work - Prescribed Tidal Works
                                                 Application Number. OPW1 1/0043


                           Address to Schedule 4A IDAS code for development
                                  application for prescribed tidal work

      2.1 Character and amenity (generally) - Prescribed tidal work not in a canal - Private purpose - outcomes:
             (a)    Jetty does is set back min. 3.54m from the side boundary and does not extend past the side
                    boundary (please refer to site plan).
             (b)    The proposed jetty is the only work of its type along the edge of the water fronting the lot.
             (c)    Jetty is not roofed.
             (d)    Jetty is not roofed.
             (e)    The Noosa Plan Division 22 section 14.171 min. setback from side boundary is 3.0m, the proposed
                    Jetty will be set back 3.54m (please refer to site plan).

      3.1 Character and amenity (height scale size) - outcomes:
            (a)     the height, scale and size are consistent with requirements of the Noosa Plan 2009 and are similar
                    in size to the Jetties on adjacent allotments.

      4.1 Character and amenity (materials and colours) - outcomes:
            (a)     proposed materials will be in natural timber to blend in with the natural environment. It will also be
                    consistent to Jetties on adjacent allotments.

      5.1 Character and amenity (lighting) - outcomes:
             (a)    lighting shall be hooded and directed downwards.
             (b)    lighting shall be installed by a qualified and registered professional in accordance with the Australian
                    Standards

      6.1 Signage - outcomes:
            (a)     Any sign erected or otherwise placed in position for prescribed tidal work is integrated into the design and
                    construction of the work.

      7.1, 7.2,& 7.3 Earthwork and vegetation - outcomes
              (a)    No excavation or filling will be undertaken - apart from the driving of piles.
              (b)    Native vegetation shall not be disturbed - except in the direct footprint where placing piles.
              (c)    Any Native vegetation destroyed shall be replaced with native vegetation.

      8.1 Public access (availability) - outcomes:
             (a)    no public access is blocked

      9.1 Public access (safety) - outcomes:
             (a)    The proposed Jetty meets the Design, Construction and Safety - Jetties requirements as stipulated
                    in the Noosa plan Division 22 section 14.172
                         S9.1 Max. width of walkway is 1.5m
                         S9.3 Max. length of jetty head is 7.Om
                         S9.5     a) max. area of 10 sq. m (excluding any walkways)
                                  b) length of 10.1 m walkway exceeds min. 3m
                         S9.6 one rigid handrail shall be provided
      10.1 Navigable access to, or from egress from, non-tidal works - outcomes:
             (a)    Maritime Safety Queensland have provided a letter of no objection to the proposed Jetty (please
                    refer to attached letter from Department of Transport and Main Roads dated 3 February 2011).

Page 3

11.1 Navigable Infrastructure, including, access, parking, sewerage and water services - outcomes:
      (a)    Jetty will be for private use only. All above facilities will be accessible from the attached lot as a
             private.
      (b)    Number of people on the Jetty at any time will be limited to the design load of the structure as outline by
             John Norden and assoc. and will be kept to a minimum during any private gatherings etc.
      (c)    The Jetty is primarily designed for one vessel.
      (d)    Access is provided directly to the private land above the revetment wall - no direct access is required
             through the fore shores.

12 Design, construction and safety-all prescribed tidal work
12.1 (a)     Jetty has been designed in accordance with relevant Australian Standards by John Norden and Assoc.s.
      (b)    It has been positioned to satisfy the requirements of The Noosa Plan.
      (c)    The Jetty is for private use and design loads have been selected to reflect this.
      (d)    appropriate heights have been nominated and structural design has been prepared to withstand flooding,
             tidal influences and hydrodynamic changes (refer to plans by John Norden & Assoc.s)

12.2   Piers have been founded at a depth and the walkway has been cantilevered as not to impose any additional
       loading on the existing revetment wall.

12.3   Piers have been specified to prevent minimal disturbance and minimal foot print on the sediment on the bed and
       banks of the tidal water.

12.4   Hardwood timbers, marine grade stainless steel, high strength concrete are all materials resistant to attack by
       marine organisms, corrosion and deterioration resulting from abrasion and immersion in seawater.

12.5   As the proposed Jetty is cantilevered, it is well above any storm water outlets and will not interfere with them,

12.6   Water quality of any tidal water will not be effected. (a) All materials used in construction will be retained and
       disposed of off site. (b) minimal disturbance to sediment on the bed and banks of the tidal water by placing the PVC
       pipes and then removing any debris and disposing off site. (c) any material removed from the bed through the PVC
       pipes (used as permanent formwork for the piers) including any acid sulphate soils will be disposed of off site.

12.7   Any trafficable surface (by pedestrians) on the proposed Jetty shall have a timber finish that is not slippery and has
       an even surface that may not cause anyone to trip or fall.

12.8   The proposed Jetty is private.

12.9   Tidal water is not used for any non-marine purpose on the proposed Jetty.

12.10 not applicable

13.1 & 13.2 not applicable

14.1   not applicable

15.1    not applicable

16 Design, construction and safety -jetties and piers

       16.1   Design load of 2.0 kPa has been adopted by John Norden & Assoc.s (please refer to drawings).

       16.2   not applicable

       16.3 mean high tide = +0.34, head height of RL +0.64, leaving level of deck at least 300mm above the
       water at highest astronomical tide.

       16.4 width of walkway = 1.5m (>0.9m). Jetty head width = 1.88m at widest point (<3.0m). please refer to
       plans for set out).

Section 17 to 20 not applicable.
                                                        ...000000000...

Page 4

                                                                                                      Notice
                                                                                            Coastal development


              Notice of decision - Provision of evidence of resource entitlement
This notice is issued by the Department of Environment and Resource Management pursuant to section 260 of the
Sustainable Planning Act 2009 to provide resource entitlement as delegated under the Land Act (Tidal works and prescribed
tidal work) Delegation (No. 1) 2010.




G Duffey Consulting Engineers Pty Ltd
PO Box 152
Noosavilie, QLD, 4566


Your reference: NA
                                                    Project Ref: 359288
Our reference: MCY2391
Attention: Greg and Ann Duley

Re:      Request for evidence of resource entitlement for the prescribed tidal work application for a jetty
         In the Noosa River connecting to 29 Wyuna Drive, Noosaville (Lot 14 on N10576), pursuant to
         section 260 of the Sustainable Planning Act 2009.

The Department of Environment and Resource Management, under the Land Act (Tidal works and prescribed
tidal work) Delegation (No. 1) 2010, has considered your request received on 3 February 2011 and wishes to
advise you of the decision as specified below:



 Property owner.                   Greg and Ann Duley


 Activity:                         Prescribed tidal work


 Activity description:             Construction of a 12 m long jetty with 7 m wide head


 Plan /-Drawing number:            Working Drg, 10/162-1, November 2010


                                   Over unallocated state land connecting to 29 Wyuna Drive, Noosaville,
 Description of subject land:
                                   otherwise known as Lot 14 on N10576

 Decision:                         Evidence of resource entitlement is granted.



Page 1 of 2.080131


Department of Environment and Resource Management
www.derm. Id. v.au ABN 46 640 294 485

Page 5

 ecoaccess
         environmental licences and permits

                                                                                                                  Notice
                          Notice of decision - Provision of evidence of resource entitlement


  Decision Number:                        SPRE01551911

  This decision is current for 6-         The evidence of resource entitlement can be used to support a development
  months                                  appliction until 21 September 2011.


You are advised that all applications involving disturbance of marine plants require a development approval
from the Department of Employment Economic Development and Innovation (IDAS Form 26).

It is important to note that the provision of evidence of resource entitlement over State land means that the State
has no objection to the lodgement of the application for development approval. It does not:

     •   imply approval of the development application; or
     •   affect functions the agency may exercise as the assessment manager or a referral agency; or
     •   authorise a right to use and occupy land.
You may need to comply with the cultural heritage duty of care guidelines under the Aboriginal Cultural Heritage
Act 2003 and the Torres Strait Islander Cultural Heritage Act 2003, refer to the guidelines on
www.derm.qld.gov.au.
The Department of Environment and Resource Management has not provided an early concurrence response
for this application. The application must be referred to the Department of Environment and Resource
Management for concurrence assessment during the IDAS referral process.



If you require more information, please contact Peter Morrall, the Project Manager, on the telephone number
listed below.


Yours sincerely



                                                                                   2LMarch 2011
     P^IVVL^ -
                             Signature                                                   Date


Ben Sale                                                                 Enquiries:
Manager (Sunshine Coast)                                                 Peter Morrall
Environmental Services North                                             PO BOX 168 Cotton Tree, Q, 4558
South East Region                                                        Telephone: 07 5459 6132
                                                                         Facsimile: 07 5443 9927
Department of Environment and Resource
Management




Page 2 of 2.080131                                                       Department of Environment and Resource Management

Page 6

                                              Sunshine Coast Regional Council           07 5475 7272
^[Sunshine Coast
   y             l
                                              Locked Bag 72
                                              Sunshine Coast Mail Centre Q 4560
                                                                                        07 5475 7277
                                                                                     E [email protected]
       '-"U ..i;                              ABN 37 876 973 913                     v,, www.sunshinecoast.qld.gov.au

                                              Officer:          Mark Lewis LL
                                              Direct Telephone: (07) 5475 9970
                                              Fax:              (07) 5475 9853
                                              Response Address:Locked Bag 72 Sunshine Coast Mail Centre 4560
                                              Our Reference:    ML011:VZT:OPW11/0043
                                              Your Reference:
       25 February 2011


       Paul Clout Design Pty Ltd
       PO Box 152
       NOOSAVILLE QLD 4566


       Dear Sir/Madam

                          Notice of Not Properly Made Application
                                        Sustainable Planning Act 2009

       I refer to your application received on 15/02/2011 and advise that the application is not
       properly made pursuant to the Sustainable Planning Act 2009.


  I I      APPLICATION DETAILS


       Application No:                   OPW 11 /0043
       Proposal:                         Development Permit for Operational                Work (Engineering
                                         Works) - Prescribed Tidal Works
       Street Address:                   29 Wyuna Dr NOOSAVILLE
       Real Property Description:        Lot 14 N 10576
       Planning Scheme:                  The Noosa Plan

       2   ACTIONS REQUIRED

       The application is not properly made as the following matters are outstanding:

       •    Outstanding application fee of $1,508.00
       •    State Owned Resource - the applicant has not provided evidence of an allocation of, or
            an entitlement to, the resource.
       •    The applicant has not provided details of how the proposed work addresses the IDAS
            Code for prescribed tidal works in the Coastal Protection and Management Regulation
            2003, schedule 4A.



       The above matters must be completed for the application to be properly made and
       assessment to commence.
       Pursuant to the Sustainable Planning Act 2009, the applicant is to take the actions identified
       above within 20 business days of this notice or otherwise, the application lapses.



       PD-DA-FM349/1-03/02/2010                                                                       Page 1 of 2




Caloundra Office                  Maroochydore Office             Nambour Office                     Tewantin Office
1 Omrah Avenue                    11-13 Ocean Street              Cnr Currie and Bury Streets        9 Pelican Street
Caloundra 0 4551                  Maroochydore Q 4558             Nambour Q 4560                     Tewantin Q 4565

Page 7

                                                                               OPW 11 /0043




If you have any further queries in relation to the above, please do not hesitate to contact
Mark Lewis on the above number.


Yours faithfully




CHRIS GIBBERD
SENIOR DEVELOPMENT ENGINEER - CIVIL ENGINEERING
OPERATIONAL WORKS ASSESSMENT




PD-DA-FM349/1-03/02/2010                                                        Page 2 of 2

Used in these records

About this file

File size
3.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Not Properly Made Letter.pdf · 3.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.