Council archive · source document
Response to Not Properly Made Letter · OPW11/0043
I " L C=W u-F-
b WE, 11101LIJ 1A 116 Ut M
.-
ExcCusive Lifestyle Residences
29 Wyuna Drive, Noosaville
Development Permit for Operational Work - Prescribed Tidal Works
Application Number. OPW1 1/0043
Address to Schedule 4A IDAS code for development
application for prescribed tidal work
2.1 Character and amenity (generally) - Prescribed tidal work not in a canal - Private purpose - outcomes:
(a) Jetty does is set back min. 3.54m from the side boundary and does not extend past the side
boundary (please refer to site plan).
(b) The proposed jetty is the only work of its type along the edge of the water fronting the lot.
(c) Jetty is not roofed.
(d) Jetty is not roofed.
(e) The Noosa Plan Division 22 section 14.171 min. setback from side boundary is 3.0m, the proposed
Jetty will be set back 3.54m (please refer to site plan).
3.1 Character and amenity (height scale size) - outcomes:
(a) the height, scale and size are consistent with requirements of the Noosa Plan 2009 and are similar
in size to the Jetties on adjacent allotments.
4.1 Character and amenity (materials and colours) - outcomes:
(a) proposed materials will be in natural timber to blend in with the natural environment. It will also be
consistent to Jetties on adjacent allotments.
5.1 Character and amenity (lighting) - outcomes:
(a) lighting shall be hooded and directed downwards.
(b) lighting shall be installed by a qualified and registered professional in accordance with the Australian
Standards
6.1 Signage - outcomes:
(a) Any sign erected or otherwise placed in position for prescribed tidal work is integrated into the design and
construction of the work.
7.1, 7.2,& 7.3 Earthwork and vegetation - outcomes
(a) No excavation or filling will be undertaken - apart from the driving of piles.
(b) Native vegetation shall not be disturbed - except in the direct footprint where placing piles.
(c) Any Native vegetation destroyed shall be replaced with native vegetation.
8.1 Public access (availability) - outcomes:
(a) no public access is blocked
9.1 Public access (safety) - outcomes:
(a) The proposed Jetty meets the Design, Construction and Safety - Jetties requirements as stipulated
in the Noosa plan Division 22 section 14.172
S9.1 Max. width of walkway is 1.5m
S9.3 Max. length of jetty head is 7.Om
S9.5 a) max. area of 10 sq. m (excluding any walkways)
b) length of 10.1 m walkway exceeds min. 3m
S9.6 one rigid handrail shall be provided
10.1 Navigable access to, or from egress from, non-tidal works - outcomes:
(a) Maritime Safety Queensland have provided a letter of no objection to the proposed Jetty (please
refer to attached letter from Department of Transport and Main Roads dated 3 February 2011).
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Not Properly Made LetterRelated documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.