INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006

   
 

Fortra 1 Development Application

 
  

on details &

a.

The completion of all appficable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www. ipa.qid.qov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.

 

Description of tand 1. Street address: fneludinghouse number, street name, suburtviocality name & postcode) {if applicable)
Allland the subject of the application, must be
identified. However, a description of the land is not -

uired in retation to a mobile or temporat Hh ‘ ‘ 4 ;
Environmentally Relevant Activity (ERA, % 2. Name of water body or watercourse, within which the development is proposed: (if applicable)

Advice for completing Q2 - 02 appiies if { |
development is proposed within a water body or

 

 

 

 

 

 

 

 

 

watecourse. 3. _Loton plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
Advice for completing Q3 - Most !and can be
identified by a lot on plan description. These details 6. & So Ro toy
be obtained from ttle d ts oF through th a
bed goeanen  umensorinoghne | 4. The above description is for: (tick applicable box)
However, if the land on which the development is (1 (i) the land on which the development is proposed; or
hi if description (ie. se oe se : +
For alatmadte nneoced nomatr baton CO (ii) the tand adjoining the water body or watercourse, within which the development is
watercourse) provide — proposed; or
| pte eon
8 biene saison ne LD (ili) the water body or watercourse.
ii) GPS coordinates where there is no
" adlcninfadjacent land (eg. in Moreton Bay) 5. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (m? or ha):
Advice for completing Q7 - Q7 does not apply if the * 2.
development is within a water body or watercourse. | ZA | 608 |
Advice for completing Q8 - Q8 applies if in whi ie ci . i arnt
development is within a local government area, 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) (if applicable)
tee As to Hah mtr mance tant| LL _wleesa Sac
Local Government Act 1993, 9. Port authority for the strategic port land or strategic port land tidal area on which the
Advice for completing Q9 - Q9 applies if ‘ \. ‘ tet fi A
developmentis on strategic por land or a strategic development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
port land tidal area. For mose details refer to Guide 11 { |
Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)

 

If there is insufficient room available, details may be |

provided in an attachment to the application. LEFELR ST |

11. Proposed use of the land: (eg. 6 unit apartment building, 30 lot residential subdivision, ERA for aquaculture in
ponds with a total area of 7 ha for which wastes are released into waters etc).

 

 

 

 

 

 

 

 

 

| Du@eat i
Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part /, etc)
Part A must always be accompanied by other [ |
completed parts of Form 1. For information about
when a part of Form 1 may apply refer to Guide 1,
Applicant details 13. Applicant's name: 15. Contact person:
Clearly identify who is making the application. The
applicant need nate the cwner ofthe and. Laver Hees p/_ | | SHARe) e2eArwre—)
When signing and todging this application 14. Contact number: 16. Facsimile number/e-mail address:
The applicant is responsible for ensuring the
information provided is correct. The assessment Lo auye2 643 | suyee2 & SOD

 

Manager, any referral agency & the Chief Executive
(where applicable) will rely on this information when | 17. Postal address:

 

 

assessing and deciding the application.
ff the applicant is a company - a contact person Pe S Box “HES CPaesy
rust be shown. 18. Signature: 19. Date:

 

 

 

AE t. 3.c>

a

 

 
Full text of the other 61 pages

Page 2

INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006

 

Land owner’s consent (if appiicable) 20. Land owner's consent to the making of this application:

Section 3.2.1(3) of the IPA prescribes that an i

application must contain, or be supported by, the Name Signature Date

written consent of the land owners, if the appfication

involves:

(a materiat change of use;

(i) reconfiguration of a lot;

(iii) work on land below high-water mark & not within 2
canal as defined under the Coastal Protection and
Management Act 1995;0r

(iv) work on rail corridor [and defined under the
Transport Infrastructure Act 1994.

Section 3.8.1(2}(a) of the (PA provides that

landowner's consent is nof required for a mobile or

temporary ERA.

Fer more information refer to Guide 4,

 

 

 

 

 

 

 

 

 

Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2.1(5) of the IPA requires evidence of quarry material on State coastal land under the Coastal Protection and Management Act 1995)?

resource entitlement be given for applications that

invoive a prescribed State resource, Oo NO - goto Q24 oO YES - go to Q22

Section 3.2.1(10)(a)(ii) of the IPA prescribes that an + as + .
application re en to be properly made 22. This application is accompanied by evidence: (tick applicable box)

witout enaenee oe one entitement (1 (i) of the atiocation of, or entitlement to, the resource - attach evidence and go to 023(v)
6 for cot in ee . . woe . . .
Refer to schedule 10 of the integrated Planning (1 (ii) the chief executive of the department administering the resource is satisfied the

Regulation 1998 that prescribes the nature of evidence i i ii i i -
retired by the Slat n support of fe lodging of tis development is consistent with an allocation of, or entitlement to, the resource - go

development application.
C1 (ii) the chief executive of the department administering the resource is satisfied the

development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go to Q23

Advice for completing 023 23. Evidence of the resource entitlement:
The information in (i) — (v} is mandatory if evidence is

required under 022 (i or i) above (i) Resource entitlement / authority details (vii) Official stamp of the department
The official stamp of the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the applicable)
application involves any water or riverine quarry (ii) Name of delegated officer
Sreton 3218) ls ea Cd
Section 321188) allows the resource Manager to init

8 time the evidence m; used, vi) must iii iti
completed ithe evidence time Ime. (ii) Position of delegated officer

{iv) Signature of delegated officer

 

 

 

 

 

 

 

 

 

 

 

 

 

(vy) Date
(vi) -_ date of evidence a
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
Pec ttn oo soo Beteromen CyYes (C1 NO - the assessment manager may refuse to accept this application on the
must be completed for all other applications. grounds that the application has not been properly made
Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:
An appiication shoufd be accompanied by details to . "
support tha proposat & enable the assessment Plan / Drawing / Report Number Title Date

 

manager, referral agencies and any person viewing
the application during public scrutiny or public
Notification to understand the scope of the proposal
and any potential impact.

 

 

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.

 

OFFICE USE ONLY (applicable to assessment manager's)

 

 

 

| EE 8) i DATE RECEIVING OFFICER'S | | REFERENCE
| RECEIVED NAME/S NUMBERIS
| Notification of Engagement of Private Certifier (Optional format)
To. Council. | have been engaged as the private certifier for the building work referred to in this application.

 

 

Date of engagement / / — Accreditation Number: __ Name: Signature:

 

Page 3

 

INTEGRATED PLANNING ACT 1897

   

Part E, Version 2.0, 4 October 2004

Form 1 Development Application

     

pee ae

or building work =r.

/ government's planning scheme

 

 
  
  

TTT
Comptetion of all question on is gan

engineering plans and other plans, detail

for all applications involving the assessment of operational work and/or buitding work (including detailed
jing plans for subdivisional works and conceptual design plans for engineering & buikding work when the application does :

not involve assessment of a material change of use of premises at the same time) assessable against a locat government's planning scheme.

 

Nature of the application

1.

This application is for (tick one (1) or both if appticable)

 

 

 

 

 

 

 

A development permit authorises limi | - provi f f work eg. stomwate and

EOE aiale  ereteinay | Pre iminary approva provide details of the type of work eg. roadwork, r, water and sewerage
approval is a step in the approval process =
and does not authorise development to occur. [
The types of work that are assessable against
a planning scheme are determined by the AND/OR
we for a partoxfa focal govemment and o Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
To determine the types of work that are - —
assessable under a particular planning [_ : matt /: sores . |
scheme, contact the relevant focal : ’
govemment. 2. Are the works subsequent to a previous development approval?

10 ES - provide details of al previous approvals (eg. file references) -
3. _ 1s the subdivision for a canal estate?
[Ko Ces

Portable Long Service Leave levy (if |4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?

applicable)

Prior to issuing a devetopment permit for the
works, the assessment manager is required
by law to “sight” an approved form, issued by
Qleave, which signifies that the PLSL levy
has been paid.

 

'S - complete Q5
[LINO - 05, 6&7 donot apply

Has the PLSL levy been paid?
(J YES - completeas
(ENO - the appicable levy must be paid before a development permit can be given for the works

How much was paid?
What is the receipt number of the payment? :

{ _]

 

 

 

PLEASE NOTE

This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that,-al the time of lodgement, fails to provide all applicable information

 

requested by Part A and any other relevant part of Form 1.

 

OFFICE USE ONLY (appicatee to assessment manager)

 

DATE RECEIVED

 

REFERENCE
NUMBERIS

 

 

 

 

 

Page 4

 

INTEGRATED PLANNING ACT 1997

. Part E, Version 2.0, 4 October 2004
() Is a PLSL levy applicable in this instance? LINO

(11 YES - complete afi)

(i) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment
manager / private certifier at the time of lodgement of this application?

(CNo (2 YES - provide receipt details below

Page 5

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006

 
  

IDAS Assessment.

cof WED

Checklist 27° ™.

x

   
  

 
    
  

(Formerly the “Referrals Checklist”) \

 

IMPORTANT NOTE FOR ALL APPLICANTS:

1.

NOS

10.

 

This checklist was formerly referred to as the “Referrals Checklist’, Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensiand State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources, Mines and Water, Queensland Heritage Council etc.). *

This checklist is provided to assist applicants to determine when an application requires assessment by a Queenstand State entity and may also assist the applicant to
determine the assessment manager’ for the application.

Therefore; the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
Itis the responsibility of the applicant to accurately complete this checklist.

Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application, -

The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice, The assessment manager will also rely on this information when identifying if the
application triggers referral coordination.

To assist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.qov.au, Guide 25 explains the role of the IDAS.
Assessment Checklist in the (DAS application process, and its relationship to the Form 1 development application.

Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www. ipa.qid.qov.au.

Section 2 on page 10 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006,

SECTION 1 - STATE ASSESSMENT (completion mandatory)

Note: The following state assessment triggers apply to develapment other than for building work assessable against the Building Regulation 2006.

  

 

 

Environmentally relevant activity 1. The application involves: (tick applicable box/es)

For more information refer to Guide 4. (J (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
Unless you answered. ‘none of the above" to QI, lhe

application requires assessment by the . has not been made - complete Part 6 of Form 1 ;

administering authority®. LD (ii), a mobite or temporary ERA for which a code of environmental compliance has not been
If an entity, other than the adrpinistering authority, is made - complete Part G of Form 1

the assessment manager for the application, the none of the above

administering authority is a concurrence agency for
@ the applicalion in relation to this matter,

Note: An application involving ERA 19 and/or 20 will

also require completion of Part Kz of Form t for

approval where an allocation under the Water Act
2000 is required.

 

State-controlled road matters 2, The application involves: (tick applicable box/es)

For more information refer fo Guide 3 (i) development on land contiguous? to a State controlled road and for -

Unless you answered "none of lhe above” to Q2, the

application triggers referral to the Department of {_J (a) material change of use assessable against the planning scheme;

Main Reads (DMR) as a referral agency.
In certain circumstances OMR will be an advice

(J (b) reconfiguring a Jot unless -

agency, while in other circumstances DMR will be a « the total number of lots is not increased; and

concurrence agency. . + the total number of lots abutting the State-controlled road is not increased:
Schedule’ 2 of the {P Requiation wilt assist you to

determine where DMR is an advice or concurrence O (c) operational work (not associated with a material change of use assessable against the

agency for the application. planning scheme or reconfiguring a fot mentioned in (b) above)}~

» associated with access to a State-controlied road; or

+ for filling or excavation; or

« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.

 

 

 

The assessment manager is respansibte for assessing and deciding an IDAS application, The assessment manager for an apptication is prescribed ij in schedule 8A of the IPA.
For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?’
The ‘administering authority’ may be either the Environmentat Protection Agency, the relevant local government (for a devolved ERA) or the Queensland Department of Primary Industries and

Fisheries (for a delegated ERA).
Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlled road; or thatis part of a future State-

controtled road.
Page 1

     

Page 6

INTEGRATED PLANNING ACT 1997
State-controlled road matters (cont)

IDAS Assessment Checklist, Version 18.0, 10 November 2006
(1 (ii) development on land not contiguous to a State-controlled road and -

(J (a) material change of use -
* assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
(J (b) reconfiguring a Jot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
CJ (ce) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above}~
* assessable against the local government's planning scheme; and
¢ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.

Hip noné of the above

 

Clearing vegetation.

 

 

 

3. The application involves: (tick applicable box/es)
4 For more information refer to Guide 12. . oO (i) material change ofuse—-
Unless you answered ‘none of the above" to Q3, the . +
application requires assessment by the Depaitment (a) assessable against the planning scheme;
jofNatural Resources Mines and Water (NRMW). <a .
“Ean agency other than NRMW is the assessment (b) on a fot containing .
manager for the application, NRMW isa * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
yeanourence agency for he application ja rotation to © if there is no property map of assessable vegetation for the lot - remnant vegetation;
Ifyou ticked 03(i) or (i), your application requires {c) where the existing use of the land is a rural or environmental use; and
referral to NRMW for assessment regardless of (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
; whether vegetation clearing is proposed or not: . . . .
3 . . ne ((ii)_ reconfiguring a lot -
(a) on aot containing a category 1, 2 or 3 area shown on a property map of
' assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
{b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and :
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
(iii), operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
{b) not associated with a material change of use assessable against the planning
. scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
" Form 1
min) none of the above.
ee
Strategic port land 4. The application involves:
For more information refer to Guide Wi, (1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
tf you ticked {i) - the retevant Port Authority is the Act Part | of F 1
assessment manager for the application. Ct) - complete Part | of Form
I you ticked (i) Queensland Transport is a CO) (ii) a material change of use that is inconsistent with the land use plan approved under the
Concurrence agancy for the application. TI Act for the strategic port land - complete Part | of Form 1
iy none of the above .
Acid sulfate soils 5. The application involves development on land situated in an identified’ local government area

For more information refer to Guide 10,

Untess you answered "none of the above" to Q5, ihe
application requires assessment by Department of
Natural Resources Mings and Water (NRMW).

if an agency other than NRMW is the assessment
manager for the application, NRMW is an advice
agency for the application in relation to this matter.

 

and where the surface of the land is: (tick applicable box)

(1 {i)_ below 20m AHDE and the development will involve the excavation of 1000m3 or more of
soil or sediment at or below 5m AHD, or

(J (ii) at or below 5m AHD and the development will involve filling the site with 1000m3 or more
of material

{iii) none of the above

 

 

5. The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cairns, Calliope, Catoundra, Cardwel, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Tosres, Townsville, Whitsunday.

6 Australian Height Datum (AHO).

Page2

Page 7

INTEGRATED PLANNING ACT 1997

Major hazard facilities or ‘possible 6.

 

Ifyou answered "YES" to 08 ‘he 3 ‘pplication
Fequires assessirient by the Departmentof
Emeraency Services (DES). 5. %
fan agers lel nan DES's tn assbichent ~
manager for the application, DES is d concurrence
@ agency for the application in telationto this matter. .

 

‘Water related development under the | 7.

Water Act 2000 oe
«For more information aboutitems (a) + (4), f refer ‘
| Guide 15, 45... for more information about tem (>
“refer to Gui ication i
assessm et ne dan? ”

"Unless you noes none of theabove" to a the|
application requires assessment by the Department
_ ofhalural Resources Mines and Water (NRMW)*"
iit an agency other than NRMW is the-assessment
* manager for the application, NRMWisa ro
* concurrence agency for he application i in relation to
this matter. one

|

 

 

 

 

 

 

 

* Removal of quarry material from a, 8.

watercourse.
+ For more information refer to Gud 16. : te :

if you answered “YES” 10.08, the. ‘application ,
fequires assessment by the Department of Na ural |
Resources Mines and Water (NRMW). ¥5.".

If an agency other than NRMW is the assessment
manager for the application, NRMW is a
concurrence agency for the application i in relation to
this matter, Some

Note: Part G of Form t is. required to be Sompleted
as the activity of removing quarry material from a
watercourse is also an Environmentally Relevant
Activity (ERA),

 

 

The application involves:

IDAS Assessment Checklist, Version 18.0, 10 November 2006

Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

[6

(C1 YES - complete Part L of Form 1

(1 Qi) operational work, for taking or interfering with water under the Water Act 2000, that i is:
{tick applicable box/es)
C (a) in a watercourse, lake or spring, or from a dam constructed on a watercourse (eg.
a pump, gravity diversion, stream re-direction, weir or dam) - complete Part K2, Ks, Ks Ks, or Ko of
Form 1 whichever is applicable;
for an artesian bore anywhere in the State, no matter what the use - complete Part
Ky of Form 1;
for a subartesian bore, in declared groundwater area’, for use for purposes other
than stock and/or domestic use - complete Part K: of Form 1; :
for a subartesian bore, in certain declared groundwater area, for use for stock :
and/or domestic purposes - complete Part Ks of Form 1; :
(1 (e) for constructing a referable dam® or that will increase the storage capacity of a
referable dam by more than 10% - complete Part Ks of Form 1; or
(1 (A) for taking or interfering with overland flow water - complete Parts Ks and G of Form 4

A none of the above. ——

Does the application involve development for the removal ofa quarry material from a watercourse?
requiring an allocation notice under the Water Act 2000? .

ano
(1 YES - complete Parts Ky and G of Form 1

Oo)
De
Ow

7 The dectared ground water areas are listed in Guide 13 Development jn a declared c; .

8 Referable dam is defined under the Water Act 2000.
3 Watercourse is defined in sch 10 of the IPA.

Page 3

Page 8

 

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
Operational works ina tidal areaor |9. The application involves operational work that is: ( tick the applicable bowes)
Ferrara engagement distr sor more (1 (i) _ tidal work’? as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed tidat work in focal Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; OF
Uhre yu snewered rene of te oteatio one} Cli) tidal work that is prescribed tida! work"! other than in a canal"? -complete Pert P of Fom 1; oF
application requires assessment by the : (1 (iii) carried out within a coastal management district under the Coastal Act and for ~ complete
Enyironmental Protection Agency {EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked.

, Hahaha ster aaah (J (a) constructing or installing works in a watercourse between MHWS and HAT (Le.

4 agency for the applicalon in retalo to this matter. other than those works in tidal wate where the development has been determined not

: toeal goveient is the absessment manager fr al to be assessable against the Wafer Act 2000 ;

co ( (b) constructing a canal’? intended to be connected to tidal waters;
wok a : (J (c) constructing an artificial waterway;
. . . (0 @ reclaiming land under tidal water;

[1 (e) disposing of dredge spoil or other solid waste material in tidal water;
. (1 (f) _ interfering with quarry material on State coastal land above high-water mark;

(J (g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;

ae . ( (h) removing or interfering with coastal dunes on land, other than State coastal land,
: thatis in an erasion prone area and above high-water mark;
hoo ne (1 (i) constructing a bank or bund wall to establish a ponded pasture on land, other e@
* than State coastal land, above high-water mark; or .

in none of the above.

“Operational work below high water |10. The application involves operational work that is: (lick the applicable box/es)

mark information refer lo Gi ide 18. For more (1 (i) tidal work" as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed tidal work in local Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 1; or
government tidal areas eter to Guide 24, CO Wii) tidal work that is prescribed tidal work" - complete Part P of Form 1; 0
Unless you answered “none of the above” to Q10, _ . a a
the application triggers referral (0 Queensland (1 (ii) carried out within a coastal management district! under the Coastal Act and for -
lari td) as 8 . . . “ f aren
concurrence agency, (1 (a) disposing of dredge spoil or other solid, waste material in tidal water - complete Part
Local government is the assessment manager for all . Mof Form 1, .
presented tidal work (C1 (b) reclaiming land under tidal water - complete Part M of Form 1; or

C1 (c) constructing a canal's, if the canal is associated with reconfiguring a lot - complete

Part M of Form 1;
am none of the above.

 

 

Coastal management 11, The application involves: (tick the applicable box/es)

For more information reser to Guide 1B LJ {i) a material change of use assessable under a planning scheme involving operational
Unless you answered “none of the above” to O11, ‘ i ictricHs

the application requies assesseent by the work carried out completely or partly in a coastal management district e@
Environmental Protection Agency (EPA). CJ (ii) a material change of use assessable under a planning scheme involving building

I" an agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is —

manager for the application, EPA is a concurrence

agency for the application in relation to this matter. « the construction of a new premises with a GFA” of at least 1000m?

+ the enlargement of the GFA of existing premises by more than 1000m?

(1 (ii) reconfiguring a fot assessable under schedule 8 of the IPA where the land is situated
completely or parily in a coastal management district

CJ (iv) reconfiguring a fot'® assessable under schedule 8 of the IPA and in connection with
mo the construction of a canal'® - complete Part M of Form 1
(v}

none of the above

 

 

10 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coasta! Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.

12 Canal means canal as defined under the Coastal Protection and Management Act 1995

13 Tidat work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a locat government tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.

16 Canal means canal as defined under the Coastal Protection and Management Act 1995

17 GFA is defined in sch 74 of the IPA to mean the grass floor area, For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.

18 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with he construction of an artificial waterway, must be
accompanied by the application for the operationat works to construct the artificial waterway.

Page 4

Page 9

x.

__lidal work refer. to Guide 24. The focatgovernment

INTEGRATED PLANNING ACT 1997
Development within the limits of a
port

For more information refer to Guide 18. For .
information about prescribed tidal work refer to
Guide 24,

Ifyou answered "YES" to Q12, the application
triggers referral to the Port Authority.

_ The Post Authority [s a concurrence agency if the
developinentis ~ * .
* within 200m of a shipping channel or an yey

4, _afid exit shipping corridor for the pot +
© within 100m, ofa ‘swing basin, a. cominerci .
shipping whiart, 4 mooring, anchorage or spoil .
grounds;
© within 1000m ofa planned port facility identified’.
in aland use plan approved-under the Transport
Infrastructure Act 1994.
‘tn all other situation the Port Authority is an advice 4
agency. . eee

 

 

 

Marinas

Forimore information refer 16 Guide 18. For .
"information about whether a marinas prescribed

+ is the assessment manager for all prescribed tidat :
Ifyou answered "YES" to Q43, the application
‘triggers referral to Sueensland f Fire and Rescue |
Service as an advice agency. * ah Be

 

‘Tidal works In strategic port land fidal
areas Ms

For more information refer to Gide 1a”

Untess you answered *NO" to 014, the retevant Port
Authorlly is the assessment manager for the
application and the Environmental Protection

Agency (EPA) and Queensland Transport! {QT) are

concurrence agencies for the appfication,

Heritage
For further information refer to Guide 19.
If you answered “YES" to Q15, the application

triggers referral to the Queensland Heritage Council}
as concurrence agency for thé application.

Declared catchment areas

For more information, including a list of the declared
catchment areas within Queensland, refer to Guide
13
Unless you answered “none of the above” to Q16,
the application requires assessment by the
Department of Natural Resources Mines and Water
(NRMW).
lf an agency other than NRMW is the assessment
manager for the application, NRMW is a
concurrence agency for Ihe application in relation to
this matter.

Contaminated land

Apptications involving material change of use and/
or reconfiguring a fot may trigger this referral.

For more information refer to Guide 5.

Unless you answered “nane of the above” to 037,
ihe application requires assessment dy the
Environmental Protection Agency {EPA}. If an
agency other han EPA is the assessment manager
for the apptication, EPA will be a concurrence
agency for the application in relation to this matter.

 

12.

143.

15.

16.

17.

- IDAS Assessment Checklist, Version 18.0, 10 November 2006
Does the application involve development below high water mark'9 and within the limits of a port
oro Transport Infrastructure Act 1994?
NO

(DYES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work

Does the application i involve operational work thatis tidal work fora marina with more than 6
vessel berths?

[ano

(YES - complete Part M of Form 1, of Part P of Form 1 if the tidal work is prescribed tidal work

 

Does the application involve tidal works within a strategic port land tidal area”?
0

(J YES - complete Part M of Form 1 :

Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?

jo
(J YES - complete Part C of Form 1

The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es) .

Di) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
C1 (ii) development assessable against thé planning scheme involving the establishment or

expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994:

Cath none of the above

The application involves: (tick the applicable box/es)

(i) reconfiguring a fot for which all of part of the premises are ~
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
* item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exemption otherwise provided for by paragraph (e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
{b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1

_ CU (i) a material change of use -

{a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -

complete Part N of Form 1
lil) none of the above

 

 

19 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
20 Marina is defined in the Transport Operations (Maritime Pollution} Regulation 1995.
21 Svategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic portland. -

Page5

Page 10

INTEGRATED PLANNING ACT 1997
Electricity infrastructure

For more information refer to schedule 2of the P
Regulation,

Unless you answered “none of the above" to 018,

the application triggers referral to the agency to *
whic) easementis granted in favour of as advice

agency.

. Land designated for community
‘infrastructure
Applications involving development on tand
designated for community infrastructure may trigger
this referral,
For mora information refér to schedule 2 of the |P
If you answered "YES" to 019, the application
Tequires assessment by the chief executive of the
department administering the Act aulhorising the
development for the designated purpose.
if an agency other than the designator is the
assessment managet for the application, the

designating agency will be a concurrence agency for .

ihe application in relation to this matter.

 

IDAS Assessment Checklist, Version 18,0, 10 November 2006
18. The application involves: (tick the applicable boxes)

C1 (i) reconfiguring a lot where any part of the lot is —

« subject to an easement in favour of a-distribution entity or tansmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

« situated within 100m of a substation site;

(1 (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a {ot if - : i
# any part of the premises is subject to an easement in favour of a distribution entity or '

transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

« any structure or work thats the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

(J (iii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a Jot if any part of the premises is situated within 100m of a substation
site;

(1 (iv) operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
¢ any part of the premises is subject to an easement in favour of a distribution entity or

transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

« the work is located wholly or partly within 10m of a substation site;

crm none of the above.

19. Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?

{i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(ili) other than development -

(a) for the designated purpose; or
(b) carried out by, or on behalf of, the designator.
[AKO |
CJ Yes

Page 6

Page 11

a

INTEGRATED PLANNING ACT 1997
SEQ Regional Plan

For more information yrefer to: Schedule 2 of tha |P
Regulato

, Refer to Chapter 2, part 5A and’schedule 10 of the

" Iptegtated Planning Act 1997, and schedule 2 of the
Regutatory Provisions for relevant defritons:
dinfess you’ answered * ‘none ofthe. ‘shove! to'Q20, -
the application | requires assessment 'by. whe pice ot
‘ban Management (CUM)

re weg .

 

 

Fisheries matters

For more information refer to schedule 2of the IP.
Requlation.

Unless you answered “none of lhe above’ to Q2t,
the application requires assessment by the

Or went of Primary Industries ished
(OPtaF}

if an agency other than DPI3F is the assessment
manager for the application, DPI&F is a concurrence
agency for the application in celation to items {i} -
(iv) and an advice agency in felation to item (v),

 

IDAS Assessment Checklist, Version 18.0, 10 November 2006.
20. The application involves (tick applicable boxes) -
OO ja material change of use of premises —
(a) in a Major Development Area in the Urban Footprint for -
CL (i) anurban activity -
()_ inan area included in a structure plan where the IPA, section 3.1.6
applies;
(1 in an area not included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change
of use; or
+ the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2: or
« impact assessment is required under the relevant planning scheme
intensive animal husbandry, ot
residential development involving a rural residential purpose

0 (i)
Cl (ii)
(b) in the Regional Landscape and Rural Production Area for -
OO (i) anurban activity and not specified in section 2.4(2); or
(£1. (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2}
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);

(d) in the Investigation Area for -
(1 (i) anurban activity and not specified in section 2.10(2);
( (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
(2 (ii) intensive animal husbandry

(1 (ii)-reconfiguring a fot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and

(b) not specified in section 3.1(2).

cK iii none of the above

The application involves: (tick the applicable box/es)

C) (i) an assessable material change of use for aquaculture - complete Part O, of Form 1;

C1 (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1; .

(1 (iti) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1,

LC (iv) assessable operational work that is the removal, destruction or damage of a marine

OW

21,

plant - complete Part Oz of Form 1;

development assessable under the IPA, schedule 8, part 7, on land that adjoins a
declared fish habitat area;

none of the above.

Page7 : 1

Page 12

INTEGRATED PLANNING ACT 1997

Integration of land use and public
‘transport

For more information refer to Guide 23, schedule 8A

Of the IPA, & schedule 2 of the IP Requlation,

Unless you answered “none of the above’, the
application triggers referral to QT as a conc strence
. agency.

 

Railway safety and efficiency.

For more information refer to Guida. schedule 8A
of the IBA & schedule 2 of the JP Requlation.

Unless you answered “none of the above’, the
application triggers referral to QT as a concurrence
agency.

IDAS Assessment Checklist, Version 18.0, 10 November 2006
| 22. The application involves: (tick the applicable box/es)—

(J (i) a material change of use assessable against the planning scheme for a purpose

mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that

schedule.
C1 (ii) reconfiguring a lot—

(a) _ ontand that is completely or partly within a public transport corridor, and the
total number of lots increases;

(J (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;

(1 (©) __ ontand that is within 400m of a public passenger transport facility or a future

public passenger transport facility, and the total site area is 5000m? or greater;

(1 @) _ fora residential purpose within the 25 ANEF contour for an airport;
Cle) _ for a residential purpose resulting in 100 or more allotments.

(1 (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a fot mentioned in (ii)

above, on {land that—

(1 (a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
(1) (b) _ will result in work that encroaches into an airport's operational airspace.

[1 none of the above.

23. The application involves: (tick the applicable box/es)—
C1 (i) a material change of use assessable against the planning scheme for a purpose

mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that

schedule.
0 (ii) reconfiguring a fot—

(1 (a) on tand that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;

(1 (b) _ on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or

greater;

{J (c) — onland that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
(J (d) - ontand that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
(J (e) on land that is completely or partly within 100m of; and abutting an approach
___ {o, a railway level crossing, and the total number of lots increases;
CJ (f) for a residential purpose resulting in 100 or more allotments.
C (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filing greater than 50m’, on land that—

a} (a) is completely or partly within rail corridor fand or commercial corridor land, and

the work is not for rail transport infrastructure or other rail infrastructure;
(1 (b) _ is completely or partly within future railway land, or a railway tunnel easement;
CJ (c) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.

(iv) none of the above.

 

Moonie to Brisbane pipeline
For more information refer to schedule 2of the |P

Regulation.

Unless you answered “none of the above”, the
application triggers referra? to.the holder of pipeline
licence No 1 issued under the Petroleum Act 1923,
currently Santas QNT Ply Lid, for advice.

 

24. The application involves the easement for the construction or operation of the Moonie to

Brisbane strategic pipeline, and involves: (tick the applicable box/es)~

C1 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the

easement.
CA (ii) reconfiguring a lot

C1 (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
mK work is.located wholly or partly in the easement.
{i

iv) none of the above.

 

Page 8

Page 13

INTEGRATED PLANNING ACT 1997 _

Koala habitat area
For more information, refer to,Guide 26 and
schedule 2 of the IP Requtaton.

Unless you answered “none of the above’, the
application requires referrat to the Environmental
Protection Agency as a concurrence agency.

Referral coordination

An information request requires referral coordination,
if the application involves ~
(i) 3 or more concurrence agencies; or
(ii) a facility of area assessable under a *
planning scheme and prescribed in
schedule? o¢ 8 of the IP Requlation; or
(iii) development which is subject to an
application for preliminary approvat
mentioned in §3, 1.6 of the IPA,

For more information go to Guide? and Guide §.

IDAS Assessment Checklist, Version 18.0, 10 November 2006

25. The application involves: (tick the applicable box/es)—

(1) (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in -

(J (a) clearing of native vegetation over an area greater than 2500m?;
(J (b)_ anew building and any reasonably associated structure with a total footprint

greater than 1000m2,
Oe) a
the extension has a total footprint greater than 1000m2;
extracting gravel, rock or sand from an area greater than 5000m?,
Oe)
[J (additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.
result in -
(1 (a) an increased number of lots;

an extension to an existing building and any reasonably associated structure if
Cd)
excavating of filling an area greater than 5000m2;
(1 (ii) reconfiguring a lot in a koala conservation area or koala sustainability area that will
(J (b) clearing of native vegetation over an area greater than 2500m2,

: C (ii) operational work in a Koala conservation area or koala sustainability area made

assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with ©
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m?.

C1 (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change af use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in -

(©) (a) clearing of native vegetation over an area greater than 2500m?;
(1 (b) extracting gravel, rock or-sand from an area greater than 5000m2; .
( (c)_ excavating or filling an area greater than 5000m2.

(v) none of the above.

26. Does the application trigger referral coordination?

0 \
(C1 YES, as the application: (tick the applicable box/es)

CJ (i) triggers 3 or more concurrence agencies;

(1 (ii) _ involves a material change of use made assessable under a planning
scheme and prescribed in schedule 7 of the IP Regulation;

CA (iti) involves a material change of use (other than a dwelling house, outbuilding
or farm building) made assessable under a planning scheme, or
reconfiguring a lot, in an area prescribed in schedule 8 of the IP Regulation;

CJ (iv) _ is for a preliminary approval mentioned in s3.1.6 of the IPA

 

 

Referral agency responses prior to
lodgement

Under s3,3,2 of IPA a referral agency may give a
referral agency response on a matter within its
jurisdiction about a proposal before an application
for the proposal is made to the assessment
manager.

This is commonly the case where an application
requires referral to a building referral agency (eg.
Qid Fire and Rescue Service).

 

27. Did a referral agency give a referral agency response under $3.3.2 of the IPA before the
application was made to the assessment manager?

(NO

(aves. attach a copy of the referral agency/s response/s

 

 

PLEASE NOTE:

The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the

completed IDAS Assessment Checklist {if applicable).

 

OFFICE USE ONLY {applicable to assessment manager)

DATE RECEIVED |

| _ REFERENCE NUMBERIS j

Page 9

Page 14

 

 

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 18.0, 10 November 2006

SECTION 2 — BUILDING REFERRALS (completion not mandatory)

Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006, This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.

 

Special fire services - generally

For more information go to schedule 2 table 1 and
schedule 2A of the [P Regulation.

Assessment period 16 days.” No rasponse isa
deemed refusal, * +

1.

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
requires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
(IP Regulation) or includes an alternative solution assessed against the performance requirements of the
Building Code of Australia.

 

 

 

 

 

 

 

 

 

 

 

 

 

Fire safety for budget accommodation “12.” An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work

For more information go to schedule 2 of the IP the subject of the application requires the installation of a fire safety system for a budget accommodation

Reaulalion building.

Spray painting * 13. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency

For more information go to schedule 2 of the IP - ifthe application involves a workplace incorporating spray painting.

Regut: al ion . .

Retajl meat. premises 14, An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a

For more information go to schedule 2 ofthe IP retail meat premises.

Reaulat jation ‘

Private health facilities 5.  Anapplication may trigger referral to the Department of Health as a concurrence agency if the application

For more Information go to schedule 2 of the P involves a private health facility.

Regulation . : :

Workplace area Tess than 2.3m? 6. Anapplication may trigger referral to the Department of Industrial Relations (DIR} as an advice agency if th

For more information go to schedule 2 of tie IP * application involves a work place area less that 2.3m?2,

Reautalion ‘ . :

Land contiguous to a State-controlled 7. An application may trigger referral to the Department of Main Roads as a concurrence agency or advice

toad . agency if the application involves land contiguous to a State-controlled road.

For more information go to schedule 2 of the [P . .

Regulation

Pastoral workers accommodation |8, An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency

For more information go to schedule 2 of the [P. . if the application involves pastoral workers accommodation.

Regulation

Child care centre 9.  Anapplication may trigger referral to the Department of Communities as a concurrence agency if the

For more information go lo schedule 2 of the IP application involves a childcare centre.

Regulation

Coastal development 10. An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency

For more information go to schedule 2 of the IP if the application involves land completely or partly seaward of a coastal building line22,

Regulation i .

Heritage . 41. An application may trigger referrat to the Heritage Council as a concurrence agency if the application

For more information go to schedule 2 of the LP involves a heritage registered place.

Regulation

Fisheries matters 12. An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a

For more information go to schedule 2 of the IP concurrence agency if the application involves assessable building work in a declared fish habitat area; or

Regulation, as an advice agency if the application involves assessable building work on land that adjoins a declared fish
habitat area.

Integration of land use and public 13. An application may trigger referral to Queensland Transport as a concurrence agency if the application

transport involves existing or future public transport corridors, or airport operational airspace”.

For more information go to schedule 2 of the IP.

Regulation

Railway safety and efficiency 14. An application may trigger referral to Queensland Transport as a concurrence agency if the application

For more information go to schedule 2 of the [P
Regulation

 

involves future railway land.

 

 

NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS

The local goverment, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no

response is taken to be a deemed approval.

 

Amenity and aesthetic impact of
particular building work for single
detached class 1 building or class 10
building or structure

For more information go to schedule 2 table 1 of the
IP Requlation.

Assessment period 15 days. No responseis a
deemed approval.

 

15.

An application will trigger a referral to the local government if it is :
¢ for asingle detached class 1 building or class 10 structure; and
¢ the local government has declared by resolution the following:
~ the appearance of the building or structure will have an extremely adverse impact on the amenity of
the locality; and
— the appearance of the building or structure would be in extreme conflict with the character of the
locality.

 

 

2 Coastat building lines are prescribed under the Coastal Protection and Management Act 1995.
2 Operational airspace is as defined in State Planning Policy 1/02 "Development in the Vicinity of Certain Airports and Aviation Facilities”.

Page 10

Page 15

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 18.0, 10 November 2006

 

Whether particular buildings.may be .

occupied for residential purposes
For more information go to schedule 2 table 1 of the
IP Regulation,

Assessment pertod 15 days. No recpense isa
deemed sefusal. : .

An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
referral to the local government as the concurrence agency.

 

[Design and ‘ting

  

For mora i fémmation goto schedule 2 table 1 of the

  

‘Aasessmnt patio’ Sj, wohepres a,
deemed reflsl. wee ee

te

47.

18.
19.

An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the qualitative statement for building clearance and site cover.

An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12.° ,

 

‘accommodation.

Fire safety. in’ particuilz

   

For thord information go to

 {P Regulation,

Assessment prod 15 ay, No spose :
deemed refusal,’

120,

An application may trigger referral to the focal goverment as the concurrence agency to determine the
building will comply with the fire safety standard under the Building Act 1975 when the building work has
been completed.

 

Services
For more itiformation go to z hedul

P Regulation and, the

| Assessment period’ 15 day: No response is a. a

 

deemed refusal

   
  

. An application may trigger referral to the local government as the concurrence agency to determine if the

building work
¢ complies with the performance criteria of the Queensland Development code part 15; and
e the work does not comply with an acceptable solution stated in the part.

 

"| IP’ Requlation:and the QDC part

   

Assessment period 15 days: No'responsé is a.
deemed refusal,

“An application for building work for premises in which residential care service under the Residential

Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
teferral to the local government as the concurrence agency.

 

Building work for removal or
rebuilding

For more irtformaition go to schedule 2 table 1 of lhe
IP. Regulation,

Assessment period 5 days. No response isa
deemed refusal,

| 23.

An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
referral to the local government as the concurrence agency.

 

 

Building work for rainwater tank in
designated rainwater tank area

For more informalion go to schedule 2 table 1 of the
IP Requlation and the QDC part 25.

Assessment-period 15 days. No response is a
deemed refusal,

 

24,

An application may trigger referral to the local government as the concurrence agency to determine if the

building work or structure complies with the relevant performance criteria if -

e Under the Building Regulation 2006, a rainwater tank is proposed io be installed as part of relevant
‘building work, in a designated rainwater tank area; and

* Under the Queensland Development Code, part 25, the rainwater tank does not include « an acceptable
solution for a relevant performance criteria.

 

 

Page 11

Page 16

11B5 3009 2002

WD

energex

150 Charlotte Street Brisbane 4000
GPO Box 1461 Brisbane Queenstand 4001 Reference Number IRS02-22/01/2007

 

 

 

 

Certificate for Electricity Supply for Minor Developments
(4 Lots or less)

 

Development Details

 

 

 

a. Subdivider’s Name Ausmar Homes
(Registered Address = POBOXIB
On Cooryti(‘é™S™*”*;”;”;”™”*”!” tO]! CS!!!”
b = _ Locality of Subdivision Oreaila Cresent

 

 

Sunrise Beach

 

 

 

c¢ Real Property Description Proposed Lots 1&2
@ Cancelling Lot 161 RP220508
No. of Allotments 2

 

 

e = Identification of Existing Reticulation and required action —

6 OK for OH service (a property pole may be required)

0 OH same side of street ~ OK for OH service

oO OH extension required (includes installation of Cross Street pole)

gO UG existing - no further action required
oO ua pillar from OH required

 

 

Olua ' extension required

 

 

O Customer ‘ 'S property pole is required

O Cross Street pole is required

) OH = ENERGEX Overhead Network UG = ENERGEX Underground Network

 

Additional Conditions / Comments

Lot 1 to be OH Service from SP6414

Lot 2 to OH Service from PSP6414

 

Certification

 

EN®RGEX certifies that the above named Subdivider has —

(1) Paid a capital contribution in full and made arrangement with ENERGEX for the provisions of the supply of electricity to
the,proposed subdivision or
& Supply i is available under. standard tariff conditions.

Name lan Reeves-Smith A
mtn

Position Customer Connggtion Officer
ft ifs Bee —

iy /
Signature ‘ff i Date 22/01/2007

ENEGEX Limited ABN 40 078 849 055

 

 

Page 17

RECERIED Or ET Le]
se JAN 2007

29 January 2007 ADS csccccesssssesse Transfield Services (Australia) Pty Ltd
= ABN 11093 114 553
Ashburner Francis P/L Locked Mail Bag 1,
PO BOX 325 Geebung QLD 4034
Nambour QLD 4560 PH : 07 3246 6867 Facsimile : 07 3246 6801
Facsimile : 754761844 Our ref: CONF2785
Attention: Richard Marsh Your ref

Dear Sir/Madam

TELECOMMUNICATIONS INFRASTRUCTURE PROVISIONING CONFIRMATION

Telstra Corporation Limited confirms that telecommunications network infrastructure has been
provisioned to the following development:

 

 

 

 

LOTS NUMBERED PLAN NUMBER
lot 1 & 2 cancelling lot 161 RP220508
LOCATION
Orealtla Cresent Sunrise Beach 4567 QLD

 

 

 

 

This confirmation is issued for this development only and ts issued and given solely on the basis of
the information provided by to Telstra Corporation Limited as at the date of this confirmation.

eS Additional works may still be required in order for telecommunications services to be
provided to customers in the development and these works will be carried out at Telstra’s
sole discretion.

Telstra Corporation Limited and the contractor issuing this letter on its behalf is not responsible to
or Ashburner Francis P/L , a recipient of this confirmation or anyone else for any loss suffered in
connection with this confirmation or any of the content and excludes, to the maximum extent
permitted by law, any liability which may arise as a result of the issue of this confirmation or its
content.

If you have any enquiries or require any further information please contact me at the above
address.

Sincerely,

Ct4n

Ally Williams

Transfield Services (Australia) Pty Limited
Telecommunication Services

On Behalf Of Telstra Corporation

Page 18

 

PROPOSED RESIDENCES
FOR LOT 1
OREALLA CRESCENT

SUNRISE BEACH QLD 4567

AU SMAR(S)

“ * INNOVATIVE
BY DESIGN

 

 

 

Michael Petrascu Designs

Description Date || Lot 1 Orealla Cres

 

 

Sunrise Beach Qld

 

 

 

No
-
Tel/Fax: 07 54472996 Email:[email protected] t
t

P.O.Box 651 Noosa Heads 4567 Qld BSA 7038843

 

 

Proposed Residences

 

 

 

a

 

 

 

 

 
 
   

PROPOSED RESIDENCES

 

Checked by

1- A000

 

Project number SRB-AUH-20086-01
March 2006
Author

1 Checker | Scale

Lp

Page 19

——

 

 

aN
f
| N~oog
z oe
& UP —4
8
=
3
RETAINING WALL TO
{ ENGINEERS DETAILS

 

      

NOTE: AT CURBING
Access crossover io be construcied
In accordance lo local Counci’s
standard detail drawinggs nileo0s

 

 

RL2575

 

 

 

 

 

 

 

 

RL2620

RL2420

 

 

 

SWIMMUNG POOL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

: ‘| oe w
7 o. 2
t i ory ao
w FOR DRIVEWAY LAYOUT yt | i | U “oe
REFER TO LANDSCAPING [ i. meee LA. _
LU DRAWINGS AND i, | a o q eS
D.A.APPROVED DRAWINGS - L RL2620 2.
0 s |i
Le oO oO
. a br]
O 0 | —S ° FT UNIT 2 ° RL2575 © 9 E
2 = — | 5 '  RL2420 io Z ls
S im ! : \ MM: S S
2 f RL2575 ; z E
<— | RETAINING WALL TO J a B
ENGINEERS DETAILS ee 2B ee
— _ iE
! @- LOT ? - ell : | P<
up =
<— i 6946 = QoS 7 “ |--s
1 o.
Lu 3 po ___ 10275 Le
ad — _ — — OS —soomparrone— 33.595- — a ea - SN
O y — __ 12419 - L 13301 ; LD 7875 _,
33595
4 — - ~ +
—~ SITE PLAN AUSM ARCS =
1 Do not scale from drawings due to variation in paper, depending on weather and moisture content. Use written dimensions only = Si OPEC EE
—  1:100 INNOVATIVE _
BY DESIGN
MICHAEL PETRASCU DESIGNS Lot 2 Orealla Cres SITE PLAN
Sunrise Beach Qld Proje ruber aun
Tel/Fax 07, 54472996, Email: [email protected] comics. Tae. A01
j “Drawnby
P.O.Box 651 Noosa Heads 4567 Qid. BSA 703 843 Peoposed Residences , Chesed sy a MP Scale ” 1190

Page 20

£ 162
RP 135362
2 storey ence
Brick palind
Tile Roof & al }
* &

Ra

TBM q
Nall In Kerb ,

a s
Arbitrary RL 100.00 & e ‘ower &
~

WALKER E's

DESCRIPTION

Anthony Walker Registered Surveying Associate Reg No. 345
M 0410 056 875 FO7 5455 5997 [email protected]
418 Foedera Crescent Tewantin Q 4565

—_ of
eo ney 8

    
    
   

RP 220508

1214 m( deed)

fv
~
wo

©
nt oe .
ee  palind

 

¢ 159

RP 135362

2 storey
Rendered
Metal Roof

CLIENT AUSMAR HOMES FOR

an

4 Bi s
‘orn © : a
of Bott fi AA
x a EeNC®

 

North

of

*

\ we /
a

y oO ae
we os 8

DISCLAIMER

Only visible services are located at time of survey.
No attempt has been made to join services.

Walker Surveys accepts no responsibility for services not located or damaged during excavatior
Contact the relevant Authorities prior to any excavation works.
Boundaries shown are approx. only

This plan has bean produced exclusively for Ausmar Homes ;
for the purpose of designing a new residence.

It remains the property of Ausmar Homes and their client.

It should not be used for any other purpose.

PARISH COUNTY SCALE DATE ( FIELD WORK)
(@ A3 Size)
LOCAL AUTHORITY | HEIGHT patum | FIELD 800K ped FE AUTOCAD FILE

ORIGIN OF
CONTOUR INTERVAL | LEVELS DRAWING

 

AGP CORPORATION

 

 

 

 

Page 21

   
      
  

AUS MARC)

INNOVATIVE
BY DESIGN

 

 

wo
M
2
«0 co
x ©
° ©
o wo o
a
=
Cs
RETAINING WALL
2
«©
uw
oO. -
™
@ -
wo
a
fon)
Nn
‘Q Q
fey) 8 2.
@ 8 ORR
©
©
19
3
®
N
Oil

 

 

RETAIN}

 

 

 

190) 8270

7600 |-190

 

GARAGE
6229

2100 x 4800 panel {it up door

PANEL LIFT UP DOOR
4800

 

was-cstso av [] ~-
| 6419

4800

PANEL LIFT UP DOOR f

2100 x 4800 panel lift up door

GARAGE

8270

W35- 06150 GLV H

70 \
70, 2000 2080 7

 

     
 
 
 

 

 

 

 

 

 

 

STORAGE

 

 

 

 

   

2000 | 2080
‘70

 

 

@) LOWER LEVEL PLAN

1: 100

8650

 

7600 190
7670
I

 

         
   
   
 
   
    

%

7

3025

0

f§$ $e

oe

11055

3025
—~ 3095—

— 415)

4758 —

 

 

190
1510

190

7253

|

 

15075

 

1510

}

eH

 

Michael Petrascu Designs

Tel/Fax 07 54472996 Email: [email protected]

Description

 

 

ee

 

 

 

P.O.Box 651 Noosa Heads Qld 4567 BSA 703843

 

 

E

 

 

 

 

 

Lot 1 Orealla Cres
Sunrise Beach Qld

Proposed Residences

LOWER FLOOR

 

 

Project number SRB-AUH-2006-01
Date March 2006
Drawn by “Author

 

 

Checked by Checker

 

 

Page 22

 

’
$
?

AUSMARC)

INNOVATIVE
BY DESYTGwN

FRAMING : N3
STUDS EXTERNAL & INTERNAL
LOAD BEARING
90X35 [email protected] NON-LOADBEARING
- 70X35 [email protected] @ SIDES : < 900 X 2
:  1200X2
: 1500 - 2400 X3
NOGGINS : @ 1350CRS. MAX
PLATES EXTERNAL & INTERNAL
LOADBEARING
TOP PLATE : 2/90X35 MGP12
BOT PLATE : 90X35 MGP10
INTERNAL NON-LOADBEARING
TOP PLATE : 70X35 MGP10
BOT PLATE : 70X35 MGP10

TRUSSES : PINE ROOF TRUSSES @ 900 CRS.

TO MANUF. DESIGN AND SPECS.

REFER TO CONNECTION DETAILS

FOR TIE DOWN DETAILS

 

+ 4189

 

3 GARDEN STEPS / fe
ide
8] LiF

 

|e

 

Boundkay Lina

18095

12855
190
4
ff
12395

6088

6428
8
=

 

Cc

ROOF BATTENS FIXED TO TRUSS AS PER

MANUFACTURERS SPECIFICATIONS.

7) FIRST LEVEL PLAN

Uy, 1: 100

 

 

 

 

so}

a llr
= CLT of

3
oO GARDEN STEPS
N

 

 

 

a,

F
an a Ei
* tock pee os

1000]
f—

 

18720
10901
#

\
GUTTER TO BE DETERMINED BY BUILDER |
dl]

—*

    
     
  
 
 
  
 
 
  

2690 1166,
oP

 

ai
74

2721
3721

90

3093
90,

      
   
 

TS
Co SET

 

19 190
3828 ‘1600 i 1600 J

 

 

300 2 |
p28) rod,

 

 

 

 

 

 

 

 

 

 

 

 

 

#

| §419
-#—

 

= a EASES EE E ALS ——— 5 NK
. p —_—— Mi
2690 Jvies 90
i tl
40901 4645 2400
# at

a
PARAPET WALL 18720

 

Ee

BOX GUTTER TOBE &
DETERMINED BY BUILDER

Do not scale from drawings due to variation in paper, depending on weather and moisture content. Use written dimensions only.

 

Lette

P.O.Box 651 Noosa Heads Qid 4567

Michael Petrascu Designs

Tel/Fax 07 54472996 Email: [email protected]

BSA 703843

| Date
|

=

 

 

 

 

No. E Description
|
|

 

——

Lot 1 Orealla Cres FIRST LEVEL PLAN

Sunrise Beach Qld

 

 

Project number SRB-AUH-2006-01
Date March 2006

Orawn by x He Author
Checked by

Checker

 

1- A03

 

Proposed Residences

 

 

Scaia

Page 23

oo

fo » LN
AUSMARCS)

ENNOVATIVE
“BY DESIGN

FRAMING : N3
STUDS EXTERNAL & INTERNAL
LOAD BEARING

: 90X35 [email protected] NON-LOADBEARING
: 70X35 MGP10 @ 450CRS.

@UDS @ SIDES : < 900 X2
> 1200 X2

: 1500 - 2400 X3
NOGGINS : @ 1350CRS. MAX
PLATES EXTERNAL & INTERNAL
LOADBEARING
TOP PLATE : 2/90X35 MGP12
BOT PLATE : 90X35 MGP10
INTERNAL NON-LOADBEARING
TOP PLATE : 70X35 MGP10
BOT PLATE : 70X35 MGP10

TRUSSES : PINE ROOF TRUSSES @ 900 CRS.
TO MANUF. DESIGN AND SPECS.
REFER TO CONNECTION DETAILS
@ FOR TIE DOWN DETAILS ROOF BATTENS
FIXED TO TRUSS AS PER
MANUFACTURERS SPECIFICATIONS.

 

(1) SECOND LEVEL PLAN

1: 100

 

 

 

 

 

  
      
 
 

 

 

 

 

 
 
 
  

    

 

 

 

 

   
   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
   

 

 

 

12201 , 2400
ae
7 10402
-
Portico Roof 5757
2970 630, 1906 , 4645 '
C4 a
— 90
8
ape alm 9 Xe
Ter oe} | PT ot
| 2 Q
— ‘
, | Bg) §
=z ve] wo
Se x
g
Pen a Ss 8
¢ tt UH ‘
etl 7A
el pL = |e
gz, g 5 8
N N —}

a i - -
co . a Tt Tt
5) o g} 21 8 8
wo ™ am oO

o o 3
o mo % &
= o ey
~— or ort —
1799 || 2935
Portico Roof | |
f-
|
4 ae %&

Do not scale from drawings due to variation in paper, depending on weather and moisture content. Use written dimensions only.

 

 

 

Michael Petrascu Designs

Tel/Fax 07 54572996 - Email:- michael. [email protected]

 

 

 

 

 

 

 

 

 

 

P.O.Box 651 Noosa Heads Qld 4567 BSA 703843

 

 

 

 

No. Description : Date Lot | Orealla Cres SECOND LEVEL PLAN
7 —| Sunrise Beach Qld | Project number SRB-AUH-2006-01 |
Date March 2008 1- A04
[ {| Proposed Residences — [=rr*. A laa oe

 

 

 

 

 

 

Page 24

 

 

 

FRAMING SCHEDULE

 

 

 

 

 

 

 

 

MEMBER _ SIZE & TYPE ,

Roof materials - Custom Orb

Roof Battens — Steel Top Hat Sections DN

Roof Trusses- T2 Treated Trusses @ 900 c/c's 1:

 

to manufacturers specifications

Metal Roof- Custom ORB Colorbond max span 900 mm LU

 

 

Top Plate- KD Pinus 70 x 35 F8 c= - 5 |

 

Pole plates 90x 45F17 seasoned HWD

    
 

5

 

@ TIE DOWN SCHEDULE ( Joint group JD4) Skylight over Skylight Over WC
Stairs Landing
MEMBER CONNECTION METHOD OF TIE DOWN
Roof battens to trusses Steel Top Hat Section Roof Battens @900c/c’s BOX GUTTER 200 X 150 DEEP

 

 

Standard Trusses
Skylight over

Max Span 7.5m, refer to truss manufacturers specifications Stairs Landing ;
and refer to Tie Down details Skylight Over WC
Top plate to slab or bearer or bottom plate 1/M12 tie down rod adjacent Lj i

 

to each opening & at every corner & at 1800 max centres elsewhere

Rafters/Trusses to pole plate 1/N10 bolt or with G.I. Strap
Joists to bearers supporting walls 2/75 x 3.10 mm nails min full penetration
Joists supporting bracing walls One 2/ M12 bolts one each end of panel

 

 

 

 

COLOURBOND ROOF SHEETS @ 20 DEGREES PITCH

 

BRACING |

Brace to roof trusses with speed brace in accordance to the manufacturers.
@ 30 x 0.8 G.l. strap to each end of bracing wall panel tying studs to plate y,

with 4/2.8 f nails each end, refer to bracing plan for full details and locations

of bracing wails. | |

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
   

 

WH
7) ROOF PLAN
Do not scale from drawings due to variation in paper, depending on weather and moisture content. Use written dimensions only. WV 1: 100
Michael Petrascu Designs No | ___Deseripton _| Date _|! 1 of 4 Qrealla Cres ROOF PLAN

 

 

 

Sunrise Beach Qld

 

Tel/Fax : 07 54 472 996 Email: [email protected] Project number SRB-AUH-2008-01

 

Date March 2006 1- A06

Drawn by _ Author

 

 

P.O.Box 651 Noosa Heads Qld 4567 BSA 703843 Proposed Residences

 

 

 

 

 

 

 

   

 

 

Checked by Checker i Scale 4: 100

 

Page 25

 

————

AUSMARG.)

INNOVATIVE
BY DESIGN

 

 

 

 

 

 

   

@) SOUTH ELEVATION

1: 100

4) NORTH ELEVATION

1: 100

Do not scale from drawings due to variation in paper, depending on weather and moisture content. Use written dimensions only.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Michael Petrascu Designs No. Description Pe°{) Lot 1 Orealla Cres ELEVATIONS
Tel/Fax 07 54472996 Email: [email protected] TL Sunrise Beach Qld Project number SRB-AUH-2006-01 A
Date March 2006 -
P.O.Box 651 Noosa Heads Qld 4567 BSA 703843 Proposed Residences Drawn by oF 07
[ _| Checked by Checker | Scale . 1: 100

 

Page 26

 

 

 

.

ft

i
AU SMARG) trove scenes cee

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ININOVATI Rm | | E == | SELECTED HANDRAI
YY | \/ F q h
‘B DESIGN | WA e FE i J) \ AND BALUSTR ibe
E ———}
i f E =| i h Jf
f = n. (| |e _______}

 

 

 

 

 

 

— = INIT 7 140 x 140 HWD POSTS
saroronoosn PUTIN eee
FINISH AS SPECIFIED PHS PLU we
RZ corso Sl

FFL 42.3
eer

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

wn
il)

 

 

 

 

 

 

 

 

 

 

 

 

 

eS SARY yt
aq RETAINING WALL ON BOUNDARY TO BE WATERPROOFED T
AS DESCRIBED IN ENGINEERS SPECIFICATIONS AND DETAILS =! !
| | GACK FILL AGAINST RETA aul
- | 1 AS PER ENGINEERS DETAILS. AND Se
@ STEPPED FOPTINGS ggpenncwnu ! SPECIFICATIONS “
AS DETAILEDIBY-ENGINEERS a
uo ROUNE UN
bo ROT FIIEKED RO

 

o EAST ELEVATION

1: 100

HARDIES BLUE BOARD SHEETING WITH SELECTED PAINT FINISH

   

 

> WEST ELEVATION

2) 4100 Do not scale from drawings due to variation in paper, depending on weather and moisture content. Use written dimensions only.

 

 

 

 

 

Michael Petrascu Designs Ne. Peseription Pete!) Lot 1 Orealla Cres ELEVATIONS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tel/Fax 07 54472996 Email: [email protected] Sunrise Beach Qld rad — sea aoe
“Tt ate are! -
Proposed Residences Drawn by
roexeues? ae eae | P Checked by Checker | Scale 1: 100

 

 

 

 

Page 27

 

 

 

 

 

 

 

 

 

 

 

SS _ ———

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

ool L ayeog | 2ax98Y4D Aq payoaud 7
Tou VEEZO ta 00080 seouapisey pesodoi d erseol VSa L9S¥ PID SPA} BSOON |S9 X0g'O'd
6 - 9002 HIEW aed ;
OV-I loSoor HAVES _Jequinuyaloug pID yoeeg esuun S Ne Woo WewezoMd jseyoiw Wewy geezZyrs LO XesNeL
UBId jnoAe7 sHuljooy F qeIS SAD SEBO 1 107 | seq sonaueseq on subisaq NoSejaq JSBYOI|
Je.
1 02281
; OzegL P
7 oor | 0192 . osgs 0002 |
x x os osrZ o 061 0278 LO6L 8 ;
—— + 7 TPL See 7 ae
a = — 3
= oO © nN
Oo
a 4k rem 42 ee RT SEE wo Ta
a |5
s 8 g ig
—— as & oo
3 _ °
Nn
3 :
wo m f th
“4 g
OOL : | Oo
zie ie Ls SONILOOS? AVIS an:
Qo |o nR lO ko . 8 2
oO N wo a 7 Oo on
6
on 8
a - we e
~“ “ "4 rc
Nh A
o
© emer TER ee arg] eee _t
~— ve * : $ 8
a |a i » 2 18
hy eS a a CE SET |
A 8 S 1 4
> 6 06 it a aE he EE ee erg] oe Ey
osrZ 02z8 6 8
0192 osee SS SUA SNINY
ke ozeg} . COPLEY
Stel UV W sSOhv

 

 

 

Page 28

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

: ajeog | saxoe pa CO
~ = mie GFT a ena seouepisey pesodoid evseol vSa L9Sv PID SPEBH BSOON 159 X08'O'd
- 9007 UJEW ae
0 LV L 10-9007-HNW-dYS = palag PID yoeeg OSWUNS ne woo ‘|leWsezo@d jeaeyorw ews 96672LrrS 40 xed/lel
SNOILOSS SOD EMO L307 | Seq Teuausseg On subisaq nosejed |@eUdI\|
OOL: |
theapen womeypsds AVMBAINC SLEYONOD, sue any UO HL YAHOAS ¢ U01}99S
somes = T ————= ra ee «
SOMLOO4 GieeaS i nS) OML LNA TIVM
C aon (1 NOLS weg F AYONNVI OL WOO dit Lait aNd PNINWLY
ow 11 t, Too im Goan oo cwvoga sv sae . = = :
HOYOd COep Tad ‘i sawuflg & gig omDS [awe
MOO 1B 081 WL H s,onuticy osama m
" mone mee oe ~noowanaee— | /(] fy
ONIONY1
SASIO? WY3GH OL 03X14 ONTIAD GUVOBNALSWId Wu O} il —— soy j0 op}ti9pun 0) BUKIT) 94 |. @
Sn IRA en SO SMYOM SLIS ONY $13A37 YOs SONIMVUG
ANOOWA | | WoOHNdas POLL z WOONGaE ONIGVOSONV1 NY ONIMSANIDNA OL Y3435u - GNNOWD
ONIGNY) 8 INOHLIM NMOHS N33d SAVH SNOLLOSS ~ M3IA MOTI OL
$4.4] ve ONNIAD NO ONNG GYVOSUBLS¥Id uauoL ft O0L : L LON
$.0/0 006 LY SASSNY1 JOON
Se seuss | __| WoRoes H | -
OL : lL LHOIT ANS — = ere
NO
udolde f 8
a | 7 | 10.79..
, &
gJovevo
nN
9
—
we ceeeeececeeeeeeeee-TP>o00206ogf AZ VW EN TOP ELL eee eee ae Ww
N
8
10
—_—*

 

SIHOIT ANS

 

 

 

NDISHaQ At
AALLVAONNT

rvinsnv

>

Page 29

 

‘i

AUS MARC)

INNOVATIVE
BY DESIGN

  

LIVING
GL+———_

STORAGE

a Section 5 -
1:.100

LIVING

ny
ACCROSS ORIVE WAY

STORAGE

 

 

 

 

 

 

 

 

“GL

 

Tie down trusses as described using 30x 0.8 gal
strap over truss and tooped under wall plate fixed
with 4/2.8 nails each end

 

Section 4
(2) 1: 100

 

Do not scale from drawings due to variation in paper, depending on weather and moisture content. Use written dimensions only.

 

 

  
 

 

 

 

 

 

 

   

 

 

 

 

 

: — — T
Michael Petrascu Designs No. Peseription mae | Lot 1 Orealla Cres SECTIONS
TeliFax 07 84472996 Email: michael. [email protected] || Sunrise Beach Qld Project umber SRB-AUH 200601
. | . Date March 2006 1 - Al 1
P.0.Box 651 Noosa Heads Qld 4567 BSA 703843 || Proposed Residences cen whet
Checked by Checker | Scale +2100

  

 

 

 

 

Page 30

—de—ePeeeeeeee

STRAP PLATES TO STUDS:

1800 MIN Z700 MAX Fh ce ON ENDS OF BRACING WAL
a. WITH SOx0.8 GI STRAP
(AINAILSLEG)

   
 

NOT EXCEEO 20mm,

18mm x }Genm x 1.2mm METAL ANGL

E BRACE
FIXED IN ACCORDANCE WITH MANUFACTURERS FASTENERS :
30 x 28m 8 CLOITS Sm
ROCKS WALL WALL No at aap AND PLATE PLATE) x 2.bmm 2 NALS TOENC PREM EDGE
1800 MAX cre. BETWE:
BRACING WALL 1.5 kKN/m

NAIUNG PLATES OR FRAMING

     

BRACING WALL

 

FIGURE 8.22 (e) DESIGN STRENGTH JD4 5.0 kN/m

TRUSSES PARALLEL TO BRACING WALLS

   

BRACING WALL 6.0 kN/m

FRAMING ANCHOR
(LEGS NOT BENT)
€/2.8mm 8 NALS

BRACING WALLS

FASTENERS CENTRES:
160mm TOP & BOTTOM PLATES
VERTICAL

tert T
300mm INTERMEDIATE STUOS:

 

SAME SIZE

 

BINDER CONNECTION

2f50 x O.Bmm Gi STRAPS:

  

  
 

SLCZRNG PLECES LARGE
END.3G— TO AVOID SPLITTING

(ATERNAL BRACING WALL

FIGURE 8.22 (k) DESIGN STRENGTH JD4 9.8 kN/m DESIGN STRENGTH JD4 5.0 kN/m

TRUSSES AT RIGHT ANGLE TO BRACING WALLS

FIGURE 8.22 (f) DESIGN STRENGTH JD4 4.9 kN/m

DESIGN IN ACCORDANCE WITH THE QUEENSLAND HOME BUILDING
CODE, AS 1684.2 N3, BUILDING CODE OF AUSTRALIA AND THE
STANDARD BUILDING REGULATIONS

 

 

 

 

No. |

Description

 

Michael Petrascu Designs

 

|

 

 

Tel/Fax 07 54 472 996 Email:[email protected]

 

 

t

Drawn by

 

BSA 703843

 

 

Proposed Residences

Checked by Checker | Scale

 

P.O.Box 651 Noosa Heads Qld

 

 

AUSMARG)
{ba Lot 1 Orealla Cres CONNECTION DETAILS
t Sunrise Beach Qld Project number SRB-AUH-2006-01
Date March 2006 1 - Al 2

 

Page 31

———— Te

 

 

4

AU SMARGCS)

INNOVATIVE
BY DESIGN

GENERAL NOTES

The builder shall verify location of all services,
all dimensions and levels prior to commencement
of any work .

This building shall be constructed in accordance

with the Australian Domestic Construction Manual

(ADCM), Building Act and Building Codes of Australia

(BCA) relevant codes and regulations, and in

accordance to the TRADAC Timber Framing Manual,

and in accordance to all Manufacturer's specifications
oe installation details.

Set-out dimensions shown on the Site plan shall be
confirmed by the Builder before commencement of
construction & ordering of materials.

Positions of Down Pipes (DP) & storm water drains
and levels are to be confirmed before final grading.
The builder is to ensure that surface water (rain water)
is to be diverted from the envelope of the building

on all sides at all times.

Sanitary drainage shall be in accordance to the
local authority requirements & with the prepared
hydraulics drawings.

Check position of overflow relief gully & top
¢ siab level if required.

A final as build drawing shall be provided
on completion showing position of all services.

RUBBISH & DEBRIS

All materials deemed to be unusable shall

be placed in a rubbish compound ora industrial

bin and removed from the site at the earliest opportunity.

Scaffolding

All scaffolding shall be in accordance to the
Queensland Heath and Safety obligations

and the Workplace Health and Safety Act 1995

 

SITEWORKS

Refer to Engineer's drawings and details for all
reinforced concrete work, levels, Retaining Walls Details,
Driveways, Planter Boxes and any other

work involving Hydraulics or Waterproofing

RENDERING AND PAINTING

Refer to Schedule of finished and consult with the
Building Supervisor or Primary Builder for ail information
pertaining to finishes and colours.

NOTE:

These drawings shall be read in conjunction with

all other drawings, Engineer's drawings & specifications,
schedule of finishes and with such other written instructions
as provided by the principal Builder.

All and any discrepancies shall be referred to the project
manager or supervisior for decision before
proceeding with any work.

Any changes omissions or variations which the contractor
may wish to make shail be discussed with the designer
before any work commences

WATERPROOFING: Waterproofing to wet areas are to be
carried out in accordance with Standard AS 3740 &
relevant BCA codes and requirements.And sall comply with
B.C.A Section 3.8.1

TERMITE PROTECTION: The Builder shall provide

for Termite protection to be carried out by an

approved licensed Pest control specialist in accordance
with AS 2057-1986 or the latest AS 3660-1

FLOOR WASTES to be provided to all wet areas such
as Shower,Laundry, Bathrooms,

CONSTRUCTION shall be in accordance to AS 1170.1,
AS 1170.2 AS 1664, AS 2870, AS 3600, AS 1480,
AS2870-1996 and the standard Building Laws and
Building Code of Australia and relevant Codes and

the Australian Domestic Construction Manual for the
Terrain Category W41N

BRICKLAYER: Use galvanised wail ties 1 row at 2 courses
above flashing line & one row in the second last bed

joint from top of wall on each end of stud provide
weepholes @ 900 c/c's along flashing

REINFORCED CONCRETE WORK- Refer to Engineer's
details, drawings, specification for all Footings, conctere floors,
suspended slabs, WPM

TIE - DOWN information and Details
Refer to Structural Engineers Drawings and
Specifications

Artificial Ventilation or Mechanical Ventilation
is to be in Accordance to AS 1668 Part 2 -1980
3.8.4 &3.8.5

DISCREPANCIES

ANY DISCREPANCIES IN DIMENSIONS OF THESE
DRAWINGS SHOULD BE POINTED OUT TO THE
DESIGNER AND ANY DETAILS NOT SHOWN

SHOULD BE REQUESTED BY THE BUILDER IN WRITING.
NO RESPONSIBILITY IS IMPLIED FOR ANY INACCURACIES
OR OMISSIONS FROM THESE DRAWINGS

 

 

Michael Petrascu Designs

Tel/Fax: 07 54472996 Email:[email protected]

No. Description Date

 

Lot 1 Orealla Cres
Sunrise Beach Qld

 

 

 

 

P.O.Box 651 Noosa Heads Qid 4567 BSA 703843

 

Proposed Residences

 

 

 

 

 

GENERAL NOTES

 

 

Project number SRB-AUH-2006-01

 

 

 

 

 

Date March 2006 1 - Al 3
Drawn by Author
Checked by

 

 

Checker | Scale

Page 32

 

 

 

4

AUS MARC.)

INNOVATIVE
BY DESIGN BRACING REQUIRED 31-tkN

BRACING ACHEIVED 176.56Kn

TIE DOWN SCHEDULE ( Joint group JD4)

MEMBER CONNECTION METHOD OF TIE DOWN r a

Roof battens to trusses are Steel Top Hat Sections fix with Bega be 8 =

screws 33 mm penetration Ce

Standard Trusses -72 TREATED TIMBER

Max Span 7.0 m

1/m12 bolt ( or cyclone straps) refer to truss

manufacturers specifications and refer to Tie Down details

Top plate to slab or bearer or bottom plate

1/M12 tie down rod adjacent to each opening

at every corner & at 1800 max centres elsewhere
raters russes to pole plate

4/N10 bolt or with G.I. Strap

Joists to bearers supporting walls

2/75 x 3.10 mm nails min full penetration

Joists supporting bracing walls One

2/ M12 bolts one each end of panel

 

 

BRACING REQUIRED 48-SkN
BRACING ACHEIVED 93-40kN

BRACING

Speed Brace’ on top of trusses as detailed and
nailed with one 2.8f 75 nails to underside of top chords
at 45° to chords or use speed brace in accordance

to the manufacturers.

BRACING LEGEND

 

VB -Villaboard or Eq Fixed to manufacturers
Specs between anchor Bolts =2.00kKN/m

 

 

 

 

 

 

 

 

 

 

Minimum bracing requirements for bracing walls
: 1/M12 tie down rod to each end of bracing wall,
1/M12 bolt to bottom plate @ 1200 max crs to bracing

SB- Speed Brace" TECO SPEEDBARCE
walls or a 30 x 0.8 G.I. strap to each end of bracing

or angle brace fixed to manuf Specs

 

 

 

 

 

 

 

 

 

 

 

 

all panel tying studs to plate with 4/2.8 f nails each end, =1.5Kn/M
refer to bracing plan for full a 4 "
details and locations of bracing walls. cs SSS GR bractog wal teed nent ners
BRACING LEGEND : 190 mm Block wall =170,80Kn/M on one side or two of stud frame
PB- Structural Ply Bracing within Cavity or face of Studs betwee anchor rods to manufacurers

=6.4Kn/m specifications =2.00kN/m single side

and 4.50kN/m both sides

 

Se ee (7) BRACING LEVEL TWO
and Specifications 1: 100

Do not scale from drawings due to variation in paper, depending on weather and moisture content. Use written dimensions only.

 

 

 

 

 

 

 

 

 

 

 

 

 

Besoin
Michael Petrascu Designs — Lot 1 Orealla Cres BRACING LEVEL 2
i {_
Tel/Fax 07 54472996 Email: [email protected] Sunrise Beach Qid Project number SRB-AUH-2006-01
Date March 2006
P.O.Box 651 Noosa Heads Qld 4567 BSA 703843 | Proposed Residences Drawn by thor

 

 

Checked by Checker

 

 

 

Page 33

 

 

we
AUS MARC.)

INNOVATIVE
BY DESIGN

Door Schedule

Height | Width

GARAGE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ca) bower Level Doors Plan

 

 

 

 

 

 

 

 

 

 

1: 100 . Do not scale from drawings due to variation in paper, depending on weather and moisture content. Use written dimensions only.
' : No. Descripti Date
Michael Petrascu Designs ' ae Lot 1 Orealla Cres Lower Level Doors
Tel/Fax 07 54 742 996 Email : [email protected] Sunrise Beach Qld Project number SRB-AUH-2006-01
Date March 2006 1-A16

 

Proposed Residences mnt A _natr |

Checked by Checker | Scale 1: 100

 

 

 

 

 

P.O.Box 651 Noosa Heads Qld 4567 BSA 703843

 

 

 

 

 

 

 

Page 34

  

: INNOVATIVE
BY DESIGN

 

 

 

 

 

 

 

 

Te

Windows & Doors L1

 

 

    

 

 

 

 

 

 

 

 

 

 

=,"

pacoy/200 Pa

  

  
 

 

 

 

 

 

 

 

 

 

(2) 1: 100

 

 

 

STEEL WASHERS TABLE
bolt diameters in mm

M12 Bolts

Washers Standard
50 x 50x2.3

D14 2424SD
D165 24248Dy~
D16 2524SD Vv

STUD AT SIDES OF OPENINGS
OPENING STUDS

300 mm 90X35 F8

1200 mm 90X35 F8&

1800 mm 2/90 X 35 F8

2100 mm 2/90 X 35 F8

2400 mm 2/90 X 35 F8

2700 mm 3/90 X 45 F8

WINDOWS SCHEDULE
Nr Size ------- Lintel size
W1  1806GLV 90x 75F14
W2 1506GLV 90x75F14
W3 1506GLV 90x 75F14
W4 1506GLV 90x 75F14
WS 1506GLV/ 90x 75F14
W6 O609AWY 100 X 75F14
W7 O609AWY 100 X 75F14
W8 1506GLV 90x 75F14
W9 1506GL 90 x 75F14
: W10 O609AW “ 100 X 75F14
| W11 O609AW% 100 X 75F14
Po W12 1506GLVY 90x 75F14
W13 1506GLV 90x 75F14
W14-1506GLV 90x 75F14
DOORS SCHEDULE
Pil 242450 165465 \Te

D1i2 2400X 1200 pivot 165X65 17C
D13 2400 X 1200 pivot 165X65 17C

165X65 17C
165X65 17C
165X65 17C

Do not scale from drawings due to variation in paper, depending on weather and moisture content. Use written dimensions only.

 

 

 

 

 

Michael Petrascu Designs

Tel/Fax 07 54 742 996 Email : michael. [email protected]

Description Date

 

 

 

 

P.O.Box 651 Noosa Heads Qid 4567 BSA 703843

 

 

|
i=

 

Lot 1 Orealla Cres
Sunrise Beach Qld

Proposed Residences

   

First Level Windows & Doors

 

    
   
 

 

  

 

 

Project number SRB-AUH-2006-01

March 2006 1-A17
Drawn by ‘Author
Checked by Checker | Scale 4

 

 

Page 35

AU SMARC)

INNOVATIVE
BY DESIGN

  

 

Ww
21 {22 |

 

sh

 

oy

 

 

 

 

 
   

Re

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a Windows and Doors L2
1: 100

 

Michael Petrascu Designs

Tel/Fax 07 54 742 996 Email : [email protected]

No.

 

 

 

 

 

Do not scale from drawings due to variation in paper, depending on weather and moisture content. Use written dimensions only.

 

 

 

 

   
   
  
 

    
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STEEL WASHERS TABLE STUD AT SIDES OF OPENINGS
bolt diameters in mm OPENING STUDS
900 mm 90X35 F8
M12 Bolts 4200 mm 90X35 F8
4800 mm 2/90 X 35 F8
Washers Standard 2100 mm 2/90 X 35 F8
50 x 50x 2.3 2400 mm 2/90 X 35 F8
2700 mm 3/90 X 45 F8
Cw
25 Window Schedule
a —— Nr | Width | Height | Window Style
B2% 2yYoo A2goe a
Cw (1 jeio ‘1500 Glass Louvres
(26_] D24G Cuco%d Joo. 2 [610 _|1500 _|Glass Louvres
A 3 {610 1500 Glass Louvres
my 4 (610 4500 Glass Louvres
Li w 5 [610 1500 Glass Louvres
ar 6 |610 1500 [Glass Louvres
7 1610 1500 Glass Louvres
] 8 AW
tl 8 Glass Louvres
| 9 Gtass Louvres
ee [12 [610
13 |610 1500 . {Glass Louvres
14 |610 1500... |Glass Louvres
18 |610 (1500 |Glass Louvres
| ee (16 [510 [1500 — [AW
[7 {S10 [1500 [AW
Wl 24_] a 78 [510 1500. [AW
20 [610 1500 .. {Glass Louvres
21 (610 1500 |Glass Louvres
22 {610 1500 ~ |Glass Louvres
ow 23 {610 1500 ~ |Giass Louvres
38] 24 (910 600 ~ [AW
~ 25 {610 1500 - |Glass Louvres
26 {1510 600 ~ |H Sliding
Ww. 27 =|610 1500. |Glass Louvres
29 _| 28 |610 1500. _|Glass Louvres
29 «|910 600 = jAW
28 [1510 {600 _ _|H Silding
30 {910 600 -. {AW
30 {610 1500 - [Glass Louvres
31 {910 600 — jAW
32 {610 1500 .- _|Glass Louvres
{33 |610 1800 |Glass Louvres
34 [610 1500 _ [Glass Louvres _|
Description Date

 

 

 

 

 

 

P.O.Box 651 Noosa Heads Qid 4567 BSA 703843

 

 

 

 

 

 

Lot 1 Oreaila Cres
Sunrise Beach Qld

Proposed Residences

  

Second Level Windows & Doors

 

 

Project number

 

SRB-AUH-2006-01
March 2006

 
   

1-A18

  
 

uthor

 

 

 

Checked by

 

Checker | Scate 1

 

: 100

 

Page 36

 

AUSMARC,

. INNOVATIVE
BY DESIGN

Do not scale from drawings due to variation in paper, depending on weather and moisture content. Use written dimensions only.

 

 

 

 

 

 

 

 

 

 

 

Pia eeViZZ ZZ ZZ ZZ PIII

(Ao)
———___.._,____ ew

 

 

 

 

   

  
   
    

AREA
66.69 sq m

   

    

         

Tt
TALL

{
LT

 
  
  
   

  

 
 

AREA
66.96 sqm

 

 

 

 

 

 

 

Michael Petrascu Designs

Tel/Fax 07 54 742 996 Email : [email protected]

No.

 

 

 

 

 

 

 

 

 

P.O0.Box 651 Noosa Heads Qid 4567 BSA 703843

 

 

 

 

 

 

 

 

Dat
| ““_| Lot 1 Orealla Cres | Level One Area |
: Sunr ise Beach Qld Project number §RB-AUH-2006-01
. Date —S> March 2006 1 ~ Al 9
Proposed Residences Cran by GY author
| Checked by Checker _| Scale : 100

 

 

 

Page 37

 

AUSM™M ARCS) Do not scale from drawings due to variation in paper, depending on weather and moisture content. Use written dimensions only.

INNOVATIVE
BY: DESIGN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
  

 

 

 

 

 

 

 

 

 

Michael Petrascu Designs [No [ Peseription __|_Da'é_!| Lot 1 Orealla Cres Level 2 Area
Tel/Fax 07 54 742 996 Email : [email protected] E [ Sunrise Beach Qid Pecan SaSATH IE 1 A20
ox 651 Noosa Heads Qld 4567 BSA 703843 Proposed Residences Drawn by CPE nme
Checked by Checker | Scale 12100

 

 
 

 

 

 

 

 

 

Page 38

 

 

— INNOVATIVE
BY DESIGN

Do not scale from drawings due to variation in paper, depending on weather and moisture content. Use written dimensions only.

 

     

UNIT ONE

 

116.81 sqm

  

 

a) Lower Floor Area

1: 100

 

 

  

 

-

Lot 1 Orealla Cres Lower Floor Area

[No

Description

   

Michael Petrascu Designs

 

 

 
  
 

Sunrise Beach Qid Project number SRB-AUH-2006-01

. Date March 2006
Proposed Residences own (tr

 

Tel/Fax 07 54 742 996 Email : [email protected]

 

 

 

 

P.O.Box 651 Noosa Heads Qid 4567 BSA 703843

1-A21

 

 

 

 

 

Checked by Checker

 

Scale

 

Page 39

 

 

AUSMAR(S)

INNOVATIVE
BY DESIGN

 

k§=— 5 min Between

Penetration

Concrete and | Beam

 
   

“™

CONCRETE SLAB EDGE

min 100 x 75 HWD POLE PLATE

   

M12 BOLTS AT 900 MAX C/C'S

  
      
   
 

 

 

 

 

 

 

 

 

 

 

 

   
   
    
  

 

 

 

 

 

 

 

 

 

Michael Petrascu Designes

Tel/Fax: 07 54472 996 Email: [email protected]

  

 

 

 

 

 

 

    

 

P.O.Box 651 Noosa Heads 4567 BSA 703843

 

 

     

 

   

 

 

| 8650
T 8270 I
A a
re EFER TO ENGINEERS DETAILS AND SPECIFICATIONS REFER TO ENGINEERS DETAILS AND SPECIFICATIONS
FOR ALL RETAINING WALLS <—— FOR ALL RETAINING WALLS NX
- le
FOR CONNECTION DETAILS OF
. 2 FLOOR JOISTS TO
2 BS CONCRETE SLAB "PP
o P, REFER TO
© 2S, ENGINEERS 3
36 DETAILS HI 20088 Hyne-|-Beam =
Se Joist @ 450max cc's +
$3
‘So
g 4 RP > =
6 Boy :
& % \ 185k 4HYNEBEAM #1
¢ a “ ‘ ‘Beafers. w
& az : -_ 3
@ oa Ee : Wt T ; °
Eos + .
2 oly eg ge SEH tin
z 2 o ze —_%S oe
= 3 3 5 aS PARRPET WALL ABOVE CL J i =r
w t
ge 32 Ce U Whitt
ro > :
ws SS =x 8 ' |
ox 38 ~~ Qa
ai ag 2 } a“
o@ Ey eS z 3
ri 3 Str: 185} 40]HYNEBEAM #1 oO
& 5 N O- Bealers
we g ='o
we 8 ms
t ¥
zZ i
\ g {
Qo ‘
&
a
eB HI 20088 Hyne-I-Beam 2
” Joist @ 450max cc's =
wep fe
i —_
REFER TO ENGINEERS DETAILS AND SPECIFICATIONS
FOR ALL RETAINING WALLS
~—
REFER TO ENGINEERS DETAILS ANO SPECIFICATIONS
FOR ALL RETAINING WALLS
1) 1: 100
Description Date
Lot 1 Orealla Cres LOWER FLOOR STRUCTURAL
Sunrise Beach Qlid Frgjed number SRB-AUH2006801
Date March 2006 1-A05a
Proposed Residences Drawn by Author
Checked by Checker | Scale

 

  

 

 

   

       

28/04/2006 4:06:26 PM

 

 

 

 

 

 

Page 40

 

 

 

. . . fi
AUSMARG,) 85 sO RE

INNOVATIVE
BY DESIGN

 

 
    
    
  
  

RCCF TRUSSES TO MANUFATURERS SPECIFICATICHS CR
75 X50 F14 HWD RAFTERS @ 600 CENTRES

 

 

 

 

 

 

 

 

 

 

 

FRAMING : N3
STUDS EXTERNAL & INTERNAL
LOAD BEARING
: 90X35 MGP12 @ 450CRS. .
INTERNAL NON-LOADBEARING 3
: 70X35 MGP10 @ 450CRS. e zip x SHE BEAM?
@ stuns @ SIDES : < 9002 5 a
:  1200X2 g

 

    
 

: 4500 - 2400 X3
NOGGINS : @ 1350CRS. MAX
PLATES EXTERNAL & INTERNAL
LOADBEARING
TOP PLATE : 2/90X35 MGP12
BOT PLATE : 90X35 MGP10
INTERNAL NON-LOADBEARING
TOP PLATE : 70X35 MGP10
BOT PLATE : 70X35 MGP10

 

 

 

 

 

 

 

 

ROOF TRUSSES TO MANUFATURER
75 X SOF 14 HWD RAFTERS @ 600

 

 

 

 

 

 

 

 

 

 

 

 

TRUSSES : PINE ROOF TRUSSES @ 900 CRS.
TO MANUF. DESIGN AND SPECS.
@ REFER TO CONNECTION DETAILS
FOR TIE DOWN DETAILS
ROOF BATTENS FIXED TO TRUSS AS PER
MANUFACTURERS SPECIFICATIONS.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PARAPET WALL BOX GUTTER TOBE
. DETERMINED BY BUILDER

 

4) STRUCTURAL PLAN

1: 100

Do not scale from drawings due to variation in paper, depending on weather and moisture content. Use written dimensions only.

 

 

 

 

BEARER 195 X 65 HYNEBEAM 17

BEARER 196 X 65 HYNEBEAM 17

 

 

Michael Petrascu Designs No. Description _|_Pal° | Lot 1 Orealla Cres Structural Plan

 

 

 

 

Tel/Fax 07 54572996 - Email:- [email protected] Sunrise Beach Qid Project number SRE-AUH-2006-01

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a p R d Date March 2006 1 . A0Q5
P.O.Box 651 Noosa Heads Qid 4567 BSA 703843 ropo j crawnby cM
 P.0Box G51 Noosa Heads C4567 BSA 703640 P sed es! ences Sreneaby C—— Scale 1:

 

Page 41

. Revision _, Description

 

 

 

 

‘AWING SIZE -=A2 7
A HOW post added to stair welt void.
BRACING KEY ° wen AOE TD ES ae
Bracing pone! fengih.
1.8 (PB) —— Brocing pone! Upe.

(PB) ~ 4.0mm F27 Ply faed in accordonce with the
menuloctufers requvemenis to achieve

 

 

 

 

 

 

     

 

 

6.0 /m
PROVIDE 100150 HD#O NAILNC
PLATE 10 TOP OF BLOCKHDRK
AND STEEL UNTELS W12-900.
JOmm Jont, mastic Besser control
$8 if wat rendered. 1 jpnt blocks.
Hed Post connection to deck
Nt oS per orchitectural
, i i detad.
NI2 Vertical bars, i { — RiGx400{L} Goly dowel ALL STUDS TO SHS POSTS WITH 6 146
both sides of point. top ond mid Ht of waft, WING TEK SCREWS EQUALLY SPACED.
grease one eng of
dowel ond foom cop to
end, cast-in, Post connection to deck
MOVEMENT JOWNT ETAL sper erciel
eetal. j
@ ey po “Pe < i 8 (P8) 1 (P3)
LY} & ° q
‘< | ‘ l
a 2 = oe
— rn 13 | z é|
"5 i2> si
|= | & = B|
SEF
=
d |

 
  

 

Floor beorer over.
Bi
=r

    

 

  

g
f
Beorer Over,

   

Beorer Over.

 

Line of bearer over.

   

2/220%45,
(FIZ) kd Lintel

 

@ WIZ Anchor rad from top plate to fest Aoor (SS
dearer /Mloor slab. >t (P3)

2% W12 Boll from bottom plate to floor dob.

 

Post connection to deck
os per architecturd
detail:

Additional Vertical cod in grout filed block core RS mT

Sze ond number os noted.

——— Brocing ponel, refer bracing key for sie te .
ond strength, :

BOLI Block fintet refer detods.

 

 

 

t
a - se —— Post connection to deck ©

(P2) 89 x BO x 3.5 SHS Post as per architectural
detail, THIS DRAWING AND ASSOCIATED DETAILS

{P3) 150 x 150 HDWD Post
MUST BE READ IN CONJUNCTION WITH THE
{P4) 100 x 100 HDHD Post NOTES CONTAINED ON 16115-N.

No.) MIC Masonry bolts from bracing wal stud -
tt) to core filed block wot, equally spoced up siud. Issue:

330 DRGUMe T=

CONSTRUCTION

r SCC HnNs
gl ae AS! slruclural - efi)
3) — 20 Pe compocted ABN 40 098 481 899

L grout.

18 DUKE STREET SUNSHINE BEACH QLD.4567

—= _ 1H Grout Fitted Block Walls, N12 Verticals and
Horizontals ot 800 ctrs and full perimeter of ofl
openings, odditional verticals where noted on
lon.

mam) )%) Grout Filled Biock Walls, N12 Verticals and
Horizontals at 400 ctrs ond full perimeter of ail

 

Ph (07) 5447 5544 Fax (07) 5447 2634

 

 

 

bpenings, additional verticols where noted on B
_ bee Title: First Floor Bracing Pi
t its
(Ws) Blocksork movement joint, refer detai. BLOCK PIER ~ Pt loor Bracing Plan.
{ge-iy 380 x 38D Block pier grout lec, reler deta. DETAL Project Lot 161 Orealta Cres
. Sunrise Beach

Date: May 2006 | DrgNo. 16115-86 |

 

Page 42

.

AWING SIZE ~ <A2

 

 

 

 

 

 

Revision | Description }Oate
Val ' Revised floor framing plan, 1 23.06.06.
{. = L
° ott 14/6/2008 11,31 Aw VENTS) -Slewy

Hyne H1 30070 Joist © 450 clrs
170045 (LVL) doist © $50 ctrs
350250 (F14) Jost @ 450 ctrs
Hye H6 30070 Joists @ 400 cies

200x75 (F14) Floor bearer

 
 
    
  

 

PROVIDE DOUBLE JOISTS UNDER ALL LOAD 300x45 (LL) Floor bearer
BEARING AND BRACING WALLS RUNNING 250 x 15 {F14} Floor Bearer
PARAUEL 10 JOSTS. 17575 (FIA) Floor bearer
230 x 8S Hyne 17 Floor Beorer
xi 2/300x45 (LVL) Floor bearer
25:50 (Fis) Rofters @ 900 ctrs ‘bist size eof plate
Mig x 150 () Double Joist, Nad lominate
chemset into top of . = Hyspon UYL end Hyenra by Carter Hol Harvey
block work from FBS

= AM exposed Garber 19 be HS Weated,

  
 
   
 
     
    

 
 

ROOF FRAMING SCHEDULE
2/150x38 (F14) Hip Rafters

REY | 150x50 (F14) Roof Beam
RB2

HRI

R Trusses © 600 ctrs

175450 (F14) Roof Beam
+ Al exposed timber lo be HJ treatedt

 

 
    
   
  
  
   
    
 
    

tu’ 6 x 150 (t)
| 4_ sf chemset into top of
sett ack work from FRE

 

 

  
   

, 1/#16 ¥ 150 {L)
"| chemset into top of
} block work from FB6

Hatched area indicates
infil jorsts, pack out
to suit.

   

TM16 x 150 (LY 1
chemset into top et
of block Pier.

 

a

 

125x50 (F14)
Rofters @ 900 ctrs

 

THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ 'N CONJUNCTION WITH THE
NOTES CONTAINED ON 16115-N.

i Issue:
LEGEND a a CESETS
{a) '25x75x10 Angle clects for timber beam ee Se @ CONSULTING
connections, 2/M16 cach leg, 80mm Min, end : . OWA) SMES! - 2
clearance on alt timber holes, ABN 40 098 481 899

 

(PU) Mdicates support pest under cefer tower bracing

 

 

nic 2 18 DUKE STREET SUNSHINE BEACH QLD.4567
. Ph (07) 54. 544

(LU) Indicates Lintel under cefer lower brocing plan > (07) 5447 5 Fax (07) $447 2634
f i "
o ape/size Title: Second Floor Framing Plan.

(c) 10mm M.S. side cleat to steel beam for beam 7

[0% connections, 2/MI6 for timber members 80mm Project Lot 161 Orealla Cres
Min, end clearance on all timber holes or 3/M16 4 Sunrise Beach
for steel members, :

 

A.

 

Date: May 2006 | Org No. 16115-S7

Thm
Ae
!

Page 43

 

DRAWING SIZE _ A3 Revision | Description Date

A. Re issue plans. 11.10.06.

 

 

 

 

Matt 9/06/2006 4:34 PM 16115-H1=#4.deq

 

First Floor

SZ

 

Ground Floor

SZ

General Notes :

1. Hydraulic services shown are diagramatic only. Refer to architectural
drawings for locations of fixtures.

2. All Sanitary Hydraulics and Water Reticulation within the allotment
boundary to be in accordance with AS3500.

3. All work shall comply with the requirements of authorities having

 

Basement Floor

 

 

WZ jurisdiction, after obtaining all necessary permits and approvals.
4, The contractor is to confirm the position of all existing services os
indicated on these ond associated plons prior to the commencing of
— work
To vented

5. Stormwater drainage pipes to 2250 shall be Class SW uPVC HEAVY

(U.N.0.) pipe. Over 2258 Concrete Rubber Ring Joint (RRU} Closs 3. All

pipes U.N.O. to be faid at a minimum grode of 1 in 100 U.N.O. Joins ore

to be constructed in accordance with the manufacturers requirements.

6. Sewers 100mm diom. uPVC DWV {U.NO.) and foid ot a minimum

grade of 1 in 60,

7. Water supply pipework below ground is to be ;

§3mm diam. or less - High Density Type 50

Class 12 Polyethylene

valve, outlet 8. All above ground ond internal water supply pipework to be Type B

to drain Line Copper . . .

f strainer FIRST FLOOR PLAN 9. Woter services are nat permitted in ground stabs and all joins and

a connections shall be made above the slab.

— Pressure limiting 10. Fire Hydrants are to be instolled are to be installed in accordance
valve. with AS2419.1. Hose Reels are to be installed in accordance with AS2441.

11. Clecn-outs, Inspection openings and Closing caps situated in

209 CW Supply vehicular or pedestrian pavements are to be fitted with either brass or

cast-iron covers.
L DISCHARGE PIPE SIZE
Isolating valve

ranch

STACK DIAGRAM

 

Hot water outlet

 
 
  
   
 
 
    
    
 
 
    

Temperature /Pressure Cold expansion

limiting valve

Hot water temperature
control d
‘acoord ASISO

 

 

200 HW

12. All in-ground valves shall be in accordance in approved concrete

 
    

   

 

           
     

 

 

 

 

     
 

 

 

  
 

  
      
    
  
 

 

 

   

 

200 CW Non-return rome | ON Pe es. . 4 vot . .
valve mount on wall FIXTURE 13. All waste pipes and water services penetrating slabs to be wropped
VB 40 in an approved flexible joint joint wrapping.
14, The term SERVICE’ refers to the minimum internal pipe diameter
unless noted otherwise.
Safe tray in accordance with
se “ae” Safe voy in access (@consuurina. '  regtechnical EN)
wosle As] strucluval = civil - geotechnical Se)
HOT WATER UNIT DETAIL ol 40 098 481 899 g —
(AS3500.4)
18 DUKE STREET SUNSHINE BEACH QLD.4567
LEGEND KEY c_ ~ Water Meter. Ph (07) 5447 5544 Fax (07) 5447 2634
~ UPVC Sewer, size grade and invert cmcmcwx «- Stormwater pipe, size, grade and invert a
B Bath HCB House Connection Branch NRV Non-Return Valve 1G Test Gate level as noted levels os noted Title: Internal Hydraulics Arrangement
CO Clean—Out HR 36m Fire Hose Reel ORG Overflow Relief Gully V Vent —w— - External Poly Water Service, size os noted Ne ~ Cold and Hot Water riser -
DP Rainwater Down-Pipe HWU Hot Water Unit PLV Pressure Limiting Valve VB Vanity Basin riser locations and size. Project Lot 161 Orealla Cres
FP Frog Flap IC Inspection Chamber SC Stop Cock VC Vent Cow! —CW— - internal Cold Water service Qe - Sanitary Stock number and Vent size | Sunrise Beach
FWG Floor Waste Gully 10 Inspection Opening SHR Shower WC Water Closet g Re
HC Hose Cock Loundry Tub SK Sink WM = Washing Machine | —HW— = Internal Hot Water service —@) - Fixture Unit toading. : Date: May 2006 Drg No. 16115-H1

 

Page 44

Revision | Description Date
A. | Re issue plans. 41.10.06.

 

 

 

 

watt 9/06/2008 4.34 PU 18115—H1-H4.dwo

 

 

 

 

 

 

 

 

 

General Notes :

1. Hydraulic services shown cre diagramatic only. Refer to architectural
drawings for locations of fixtures.

2. All Sanitary Hydraulics and Water Reticulation within the allotment
boundary to be in accordance with AS3500.

3, All work shall comply with the requirements of authorities having
jurisdiction, ofter obtaining all necessary permits and approvals.

4. The coniractor is to confirm the position of all existing services as
indicated on these and ossociated plans prior to the commencing of
work,

5, Stormwater drainage pipes to 225@ shall be Class SW uPVC HEAVY
(U.N.0.) pipe. Over 2256 Concrete Rubber Ring Joint (RRU} Class 3. All
pipes U.N.0. to be laid at a minimum grade of 1 in 100 U.N.O. Joins ore
to be constructed in accordance with the manufacturers requirements.
6. Sewers 100mm diam. uPVC DWV (U.N.0.) ond laid at o minimum
grade of 1 in 60.

7. Water supply pipework below ground is to be ;

63mm diam. or less - High Density Type 50

Class 12 Polyethylene

8. All cbove ground and internal water supply pipework to be Type B
Copper.

9. Water services ore not permitted in ground slabs and all joins and
connections shall be made above the slab.

10. Fire Hydrants ore to be installed are to be installed in accordance
with AS2419.1, Hose Reels are to be installed in accordance with AS2441.
li. Cleon-outs, inspection openings ond Closing cops situated in
vehicular or pedestrion pavements are to be fitted with either brass or
cast-iron covers.

12. All in-ground valves shalt be in accordance in approved concrete
path boxes.

13. All waste pipes ond water services penetrating slabs to be wrapped
in an approved flexible joint joint wrapping.

14. The term "SERVICE’ refers to the minimum internal pipe diameter

GROUND FLOOR PLAN unless noted otherwise.

77

a0 (CONSULTING | ENGINEERS ax
SCG structural - civil - geotechaical eS

ABN 40 096 481 899

‘@

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    
   
 

   
     
       
     
     

 

 

18 DUKE STREET SUNSHINE BEACH QLD.4567
LEGEND Key

   

 

 

 

 

Ca - Woter Meter. Ph (07) 5447 5544 Fax (07) 5447 2634
— UPVC Sewer, size grade ond invert smc «=~ Stormwater pipe, size, grade and invert a ,
B Bath HCB House Connection Branch NRV Non-Return Voive IG Test Gate level as noted ty levels as noted Title: internal Hydraulics Arrangement
CO Clean-Out HR 36m Fire Hose Reel ORG Overflow Relief Gully V = Vent —w— _ - External Poly Water Service, size as noted - Cotd and Hot Woter riser -
DP Reinwater Down-Pipe HWU Hot Water Unit PLV Pressure Limiting Valve VB Vanity Basin * riser locations and size. Project Lot 161 Oreatla Cres
FP Frog Flap IC Inspection Chamber SC Stop Cock VC Vent Cow! —CW— - Internal Cold Water service eB - Sanitary Stack number ond Vent size | Sunrise Beach
FWG Floor Waste Gully 10 Inspection Opening SHR Shower WC Woter Closet 8
HC Hose Cock Loundry Tub SK Sink WM = Washing Machine | —HW—- - Internal Hot Water service —@) - Fixture Unit loading. : Date: May 2006 Drg No. 16115-H2

   
 

Page 45

Ref Revision | Description Date
iIIS-H4 for | A. |Re issue plans. 11.10.06.

supply. RT moe HW’ { : ft
: 7 s on safe J
. . } trays, 50 Refer 2
ot Tene em eee eee Wt : wool to FP. fo 16115-H4 for Matt «9/08/2006 4:34 Pw 1611S-HI-H4.deg
: @ ORG connection.

 

 

 

   
   

 

    

 

 

Unit 1

General Notes :

1. Hydraulic services shown are diagramatic only. Refer to architectural
drowings for locations of fixtures.

2, All Sanitary Hydraulics and Water Reticutotion within the allotment
boundary to be in accordonce with AS3500.

3. All work shall comply with the requirements of authorities having
jurisdiction, after obtaining all necessary permits ond approvals.

4. The contractor is to confirm the position of all existing services as
indicated on these and associated plans prior to the commencing of
work

5, Stormwater drainage pipes to 225 shall be Class SW uPVC HEAVY
(U.N.0.) pipe. Over 2256 Concrete Rubber Ring Joint (RRu) Class 3, All
pipes U.N.O. to be laid at a minimum grade of 7 in 100 U.N.O. Joins are
to be constructed in accordance with the monufacturers requirements.
6. Sewers 100mm diam. uPVC DWV (U.N.O.) and laid at a minimum
grade of | in 60.

7. Woter supply pipework below ground is to be ;

63mm diam. or tess - High Density Type 50

Class '2 Polyethylene

8, All above ground ond internal water supply pipework to be Type B
Copper.

a: 9. Water services are not permitted in ground slabs and all joins and
connections shall be made above the slab.

10. Fire Hydronts are to be installed are to be instalted in accordonce
with AS2419.1. Hose Reels are to be installed in accordance with AS2441.
11. Clean-outs, Inspection openings and Closing cops situated in

aan vehicular or pedestrian pavements are to be fitted with either brass or
s cast-iron covers.

|
\FI

i
|
t
|
|
l

SS

1

r

b

1

r

-
tay

   

 

© @

RSSSSSSSS

Lh d-td #> jf Ewe SHREW
¢ i i )

Phares I iC curly IX - i

bbs ot. ‘0 rs i

aia | a

(4 ‘O :

t t :

|

 

 

 

 

 

 

 

 

 

 

 

& C0 12. All in-ground valves sholl be in accordance in approved concrete
|: path boxes.
Refer | ae i ee pa 13. All woste pipes and woter services penetrating slabs to be wrapped
16115-H4 for HWU's on safe in on approved Rexible joint joint wrapping.
supply, trays, 50 14. The term "SERVICE’ refers to the minimum internol pipe diometer
waste to FP. unless noted otherwise.
BASEMENT FLOOR PLAN. Regs CONSULTING ENGINEERS <&
a op
structure! - civil - geotechnical i\&
ABN 40 098 481 899
18 DUKE STREET SUNSHINE BEACH QLD.4567
LEGEND KEY Cm = Woter Meter. Ph (07) 5447 5544 Fax (07) 5447 2634
~ UPVC Sewer, size grade and invert sec - Stormwater pipe, size, grade ond invert a, .
B Bath HCB House Connection Branch NRV Non~Return Vaive TG Test Gate level as noted levels as noted Title: Internal Hydraulics Arrangement
CO Clean-Out HR 36m Fire Hose Reet ORG Overflow Relief Gully V Vent —Ww— -~ External Poly Woter Service, size as noted Y e - Cold ond Hot Water riser -
DP Roinwoter Down-Pipe HWU Hot Water Unit PLV Pressure Limiting Valve VB Vanity Bosin riser locations and size. Project Lot 161 Orealla Cres
FP Frog Flap IC Inspection Chamber SC Stop Cock VC Vent Cowl —CW— = Internal Cold Woter service @-— - Sonitary Stock number and Vent size al Sunrise Beach
FWG Floor Waste Gully 10 Inspection Opening SHR Shower WC Water Closet 8
HC Hose Cock Loundry Tub Sk Sink WM Washing Machine | —HW—— - internal Hot Woter service —) ~ Fixture Unit toading. s Date: May 2006 Drg No.16115-H3

   

Page 46

New 25dn Water Service
branch and meter from
counc# main, by N.S.C.

2/25mm Meters with dual
check valves in individuol
poth boxes with unit
numbers clearly marked.

    
  
      

__ RP Boundary Line

 

 

 

     
 
 

   

 

 

 

 

 

1860 _& Oo \
ORG ent |
bee
} sah ue}
Dv ome.
! |
! | 3 /
LOT 1 i Units 1 & 2 |
O 2 rik i |
‘@ AJ is
m i
> w |
[— =
[— aL __ _ _ __|
> al i ane imeem HO Ben off Boundary Line O J
O | - wf semseoenmess < Ic 1 1 cae
DD a |
mM Dev OMS.
O
m
S LOT 1 Units 1 & 2 |
1
@
POOL BY
OTHERS
DCV !
c 1
= (cP ree enn yo Bd. 1

 

 

 

 

 

  

RP Boundary Line

SITE_PLAN.

(Scale 1:200)

PRIOR TO CONSTRUCTION ENGINEERS
15 TO REVEW CONTOUR SERVEY

(7 BE PROVIDED) ON BOTH
ALOTWENTS (N TO CONFIRM THE
DETARS CONTAINED HERE IN,

    
        

2/25mm Meters with dual
check valves in individual
path boxes with unit
numbers clearly marked.

New 25dn Water Service
branch and meter from
council main, by N.S.C.

:

New HCB (10)

St 39.76

tL 38.46
—__I

Existing brench house

connection line to be

copped ond disused
_—_____}

' REFER 16115-H1 FOR INTERNAL
| | WATER RETICULATION.
t

ST oes HOSE COCKS FITTED
WITH NON-RETURN_ VALVES.

DN40 PUMPED DISCHARGE
FROM POOL, CONNECTION

TO GULUIES IN ACCORD.
AS3500.2.2-1996 CL. 10.9

 

New HCB (10)
iL 40,00
$1 41,00

509 Rising Main

Existing branch house
connection line to be
capped and disused

PROVIDE AN APPROVED
PUMP WELL WITH REMOTE
MOUNTED CONTROL PANEL
AND WARNING SIGNAL.

Assumed position of council sewer |

 

O Sewer

Man Hole

 

 

 

LEGEND

|

Dual Check Value

House Connection Branch NRV Non-Return Valve 1G
36m Fire Hose Reel ORG Overflow Relief Gully
Hot Water Unit PLY Pressure Limiting Valve VB
Inspection Chamber SC Stop Cock VC Vent Cowl
Inspection Opening SHR Shower WC Water Closet
Loundry Tub SK Sink WM = Woshing Machine

UPVC Sewer, size grade and invert
level as noted
External Poly Water Service, size as noted Sy ye

&—
—)

B Bath

CO Clean-Out

DP Rainwater Down-Pipe
FP Frog Flap

FWG Floor Waste Gully
HC Hose Cock

Test Gate
Veni
Vanity Basin

Internal Cold Woter service

Internal Hot Water service

 

Water Meter.

levels os noted

Cold and Hot Water riser

riser locations and size.

Sonitary Stack number and Vent size

~ Fixture Unit loading.

Stormwoter pipe, size, grade and invert

300105

Pev

Date

A. 11.10.06.

Revised invert levels for HCB lines.

 

 

 

Mott 9/08/2006 4:34 Pu 16115-HI-M4.deg,

  

BUILDER AND PLUMBER TO
CONFIRM ALL CONNECTION
POINTS FOR SERVICES TO
PROPOSED UNITS PRIOR 10
CONSTRUCTION COMMENCING.

General Notes :

1. Hydraulic services shown are diagramatic only. Refer to architectural
drawings for locations of fixtures.

2. All Sanitary Hydraulics and Water Reticulation within the allotment
boundary to be in accordance with AS3500.

3. All work shall comply with the requirements of authorities having
jurisdiction, after obtaining olf necessary permits and approvals.

4, The contractor is to confirm the position of all existing services as
indicated on these and associated plans prior to the commencing of
work.

5. Stormwater drainage pipes to 225@ shall be Class SW uPVC HEAVY
(U.N.O.) pipe. Over 225@ Concrete Rubber Ring doint (RRU) Closs 3. All
pipes U.N.O. to be laid ot o minimum grade of 1 in 100 U.N.O. Joins are
to be constructed in accordance with the manufacturers requirements.
6. Sewers 100mm diam. uPVC DWV (U.N.0.) and laid ot o minimum
grade of 1 in 60,

7. Woter supply pipework below ground is to be ;

63mm diam, or less - High Density Type 50

Class 12 Polyethylene

8. All above ground and internal water supply pipework to be Type B
Copper.

9. Water services ore not permitted in ground slabs ond all joins and
connections shalt be made above the stab.

10. Fire Hydrants ore to be installed are 10 be installed in accordance
with AS2419.1, Hose Reels ore to be installed in accordance with AS2441.
11. Cleon-outs, inspection openings ond Closing caps situated in
vehicular or pedestrian pavements are to be fitted with either brass or
cast-iron covers.

12. All in-ground valves shalt be in accordance in approved concrete
path boxes.

13. All woste pipes ond woter services penetrating slabs to be wrapped
in an approved flexible joint joint wrapping.

14. The term “SERVICE” refers to the minimum internal pipe diameter

unless noted otherwise.
; ENGINEERS

SCG structural - evil - geotechnical

ABN 40 098 481 899

 
     
   
   

CONSULTING |

18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634

 

Title: Internal Hydraulics Arrangement

 

Project Lot 161 Oreaila Cres
Sunrise Beach

 

 

Date: May 2006 Drg No. 16115-H4

 

Page 47

MT
ST
LS
MS
ss

Gc
TF

 

PLANTING LEGEND

Canopy trees

Tall Tree with a growth height greater than 20m

Medium Tree with a growth height between 10m and 20m

Small Tree with a growth height of less than 10m

Large Shrub with a growth height of greater than 3m

Medium Shrub with a growth height of between 1m and 3m

Small Shrub

Grass- Turf

with a growth height of less than 1m

Groundcovers

Tufting - a type of plant that spreads out

Forest Mulch

PROPOSED SPECIES

Speqes Name

TREES / SHRUBS
Acacia conferta
Acacia flavescens
Banksia confenia
Brachyehitan bidwitli
Callistemon polandil
Grevillea ‘Honey Gem’

Melaleuca elliptica

Melastoma affine
Pitlosporum revolutum
Syzglum australia
Syzglum wilsonil

SHRUBS & GROUNDCOVERS

Banksia robur

Callistemon ‘Captain Cook’
Cymbopopgan refractusBarb Wire Grass
Dianella caerullea
Eustraphus latifoilus
Hardenbergia violacea
Hibbertia vestita

Imperata cylindrica

Common Names

Wattle

Coastal Wattle
Banksia

Smail Kurrajong
Boitlebrush
Grevillia

Gramte Honey Myrtie

Blue lounge

Hairy pittasporum
Aussie compact
Powder Puff Lilly Pilly

Swamp Banksia
Owarf bottiebrush

Blue flax filly
Wombat Berry
Faise sarsaparilia
Hairy Guinea Flower

Blady Grass

Leptespermum pelersorLemon Scented Tea Trea

Lomandra fitttornis

Lamandra tongifalla
Thereda triandra
Viola hederacea

Westringla fruticos.

Xanthorrhoea jonnsonil

CONAN RYN >

10.

12,
13.
14.
15.
16.

Fine-teaf mat rush

Long-eaved mat rush
Kangaroo Grass
Native voitet

Coastal rosemary

Forest Grass Tree/Blackboy

PROPOSED PLANTING LIST

Acacia conferta-
Acacia flavescens
Banksia conferta
Brachychitan bidwiili
Catistemon polandil
Melaleuca eltiptica
Syzygtum wilsanit
Banksia robour

Lentospermum petersenil

Imperata cytindnca
Lomandra filfomis
Viola nederacea
Themeda triandra
Eustrephus latifoilus
Hibbertia vestita
Hardenbergia violacea

Wattle

Coastal Wattle

Banksia

Small Kurrajong

Bottlebrush
Granite Honey Myrtle
Powder Puif Lilly Puly
Swamp Banksia
Lemon Scented Tea Tree
Biady Grass
Fing-leaf mat rush
Native voilet
Kangaroo Grass
Wombat Berry
Hairy Guinea Flower
False sarsapanila

CRESCENT

OREALLA

NEW CROSS OVERS TO COULCIL DETAIL

BE TNL EN

 

 

 

coy
—_!

REW BLOCK WALL FENCING 1800 GH = --— + ~~
ke TSS

RETAN NG WALL AND FENCE ~

FRONT POATIO

 

EXPOSED AGGREGATE CONCRETE
DRIVEWAS TO SBECTED FINISH

FRONT POATIO

 

ao

1200 Win Poo! Fence

 

S Pool gate

SWIMMING POOL.

Pool gata

SWIMMING POOL

1200 hugn Puc Fence

 

 

 

 

EXPOSED AGGREGATE CONCRETE =
ORIVEWAY ? SELECTED DW 3
< =

   

RETAINING WALLS TC ENG, SPECIFICATIONS

7>>, GROUND LEVEL ON SITE
SEY 15100

1580 _ 1500 820,

SURFACE FINISHES

G TURF- COUCH FREE OF WEEDS TO BE ROLLED OUT ON FOOTPATH VERGE
HARD SURFACES
FP 1800 WIDE EXPOSED AGGREGATE OR BROOM FINISH CONCTRET FOOT PATHS

OW EXPOSEO AGGREGATE CONCRETE ORIVEWAY- COLOUR TO BE SELACTED
P PRECAST PAVING PANELS TO BE BEDDED ON CONSOLIDETED CRUSHED ROCK MATERIAL

 

 

 

ATISN A “
AUSMAR(S)

SWIMMING POOL

SWIMMING POOL

 

 

 

 

7 are oe — -- oe

Michael Petrascu.
Designs

P.O.Box 651 Noosa Heads
Queensland 4567

 

Tel: 07 54 472 996 Be
Fax: 07 54 492 450

 

 

 

E Lot 161 Orealla Cres

Area: 1244.0 sq.m :

RP- 220508 !
Town- Noosa 7
Parish- Weyba '

County- March

; LANDSCAPING

LAND AREA
UNITS,
: Balance

i
1244.00sq.m 100% it
467.92 sq.m 37.61%
776.08 sq.m 62.38%
! Swimming Poois 79.76 sq.m 6.41%

Landsacping 696.29sq.m 55.97% 1
Paths and Onveways.

 

a a
No. : Description
| _ [See REF NA AGP IOOs.2

 

 

EXISTING TIMBER FENCIRY TO UE RETAINED AND MADE 10 COMPLY WITTDHE SWIMMING POOL FENCING ACT ANU TOWOUNCHL APPROVED CONDITIONS
a

 

4. 1500 |

RESIDENCES

LANDSCAPING
LAYOUT PLAN |:

2006-SRB-AUH ©

 

Project number
“baw APRIL 2006
“bawmey mp |
Checkedty MP

INNOVATIVE _
"BY DESIGN

24/10/2008 12:35:10 PM

Page 48

DRAWING SIZE - A2

1. Do noi scole from this drowing.

2. All dimensions in mitimeires

3, Selting out dimensions ore to be obtoined from the architectural
drawings.

4. Any discrepancies between these drawing ond the architectural drawings
are to be referred to the engineer immediately.

5. The builder is responsibie for tocoting oll existing services within and
adjacent the allotment ond shall ensure that ali new works ore in
accordence with the otteched critical depth line diagram,

6. This drawing is to be read in conjunction with the specifications ond
requirements of SCG Consulting Engineers site investigation report.
(No.16115{S)}

7. Protection against sub-terrainian termites is to be in accordance with
the architects details.

8, Al excavations are to remain dry and {ree of all loose material prior to
the placement of concrete.

1. All workmonship and materials shod comply with AS3600 - Concrete
Structures

2. Additives including FLY ASH con only be odded to the concrete upon the
approval of the engineer.

3. All concrete shod be normal class concrete unless noted otherwise.
Concrete grades, maximum slumps and moximum aggregate size are os
follows;

Foolings - 20MPo, max slump 100mm & 20mm max. agg. size.

Ground Floor Slabs 100Thk. - 25MPo, max. slump 80mm & 20mm max.
agg, size.

Members >100Thk - 40MPo, mox skimp, 80mm & 20mm mox. agg. size..
Btockwork Grout - N20, mox. slump, 100mm dé 10mm max. agg. size.

4. MI concrete members greater thon 100mm in thickness must be
mechanically vibrated.

5. in na instance shall the concrete be WETTED UP prio to or during
Placement.

6. Slob concrete shall be cured for o minimum of seven (7) days by on
approved method. Details avaiable upon request.

7. Formwork stripping ond back-propping of suspended floor slobs to the
approval of the engineer.

1. The following morks ore used to identify the vorious reinforcing steets
used, governing stondord for use also listed;
TM — Trench Mesh, min 450MPa (ASt304)
F -~ Wesh/Fobric, min. 450MPa (AS1304)
N - Deformed bar, min. 500MPo (AS1302}
R ~ Plain bor, min 250MPo (AS1302)
W = hord drown wire, min 450MPo (AS1303)
2. All reinforcement sholl de chaired, tied ond restrained in the correct
Jocotion to ensure no movernent during concrete placement. Siob mesh
chows ot 800mm ctrs, max. in both dwections.
3. Minimum cover to reinforcement is os follows:
Footings & Piers - 40mm all faces
Slabs on ground - 30mm lop {internal surfoces)
JOmm bottom {over poly. DPM)
40mm (exposed surfaces).
Suspended Slobs - 30mm {intemal surfaces),
- 40mm (exposed surfaces).
Beoms & Columns- 40mm (exposed surfaces).
- 3mm (internal surfaces).
4, Minimum ‘ap lengths ore 225mm (one pone! plus 25mm) for slob mesh,
500mm for trench mesh ond 40 times the bar diometer or 500mm
whichever greater for reinforcing bars.

TMEER :

1. All workmanship and materials shall be in accordence with AS1720 ond
AS1684.

2. All timber froming and minimum sizes unless indicated on these drowings
sholl be in accordonce with N3 Timber Froming Monwol.

3. MI timber unless noted otherwise shail be seasoned.

4, MI timber stored on site shal be stacked clear of the ground ond shall
be protected from the weather.

§. All batted connections shall be fitted with galvanized mid steel woshers.
6. Temporary brocing and support is to be provided throughout the
construction period until such stoge thot all members are installed and
connected in accordance with details provided.

7. All timber shat be appropriately protected from insect and/or moisture
attock ot least lo ihe provision of the buiding code of Australia ond
AS36680 - Protection from Sub~Tesroneon Termites.

& Pre=fobricated roof trusses are to be designed ond monufactured by o
speciofist contractor, Trusses 1o be braced in accordance with the
manufacturers requirements.

9. Floor joists exceeding 150mm in depth shall have solid blocking along the
ine of oll supporis ond at mid span for all spons exceeding 3.0m ond at
1/3 points for spons exceeding 4.2m.

10. All froming anchors, fixing plates, nailing plates, joisl hongers to be
galvanised minimum or stainless stee? where construction within 2.0 km
radius of open coastd oreos.

11, Gang-nailed splice plaies not permitted for exterior timber beams.

STEEL WORK :

1, All workmanship shail be in accordance with AS4)00 with all members and
sections being new and free of rust ond damage. Any vorialion to this must
be confirmed in writing by the engineer prior to any work commencing.

2. All steelwork unless noted otherwise shall cleaned of rust ond mil scole
ond cooted with one coat of ROZP.

3. Exposed steelwork including botts should be hot dipped galvanized in
accordance with AS4791/2 os opplicable.

4. All bolts shall be in accordance with ASIti1. Uniess noted othernise all
bolts shall be grade 4.65 (S-snug tight) galvanized. Temporary bracing and
support shall be provided until oll bolts are nstafed and {ensioned.

5, All SHS, RKS and CHS sections to be of minimum strength grade C350 in
accordance with ASI63.

6. All welding shall be carried oul by o specialist tradesmen in workshop
condilions in cecordance with AS2747. On-site welding Is ondy permitted
following prior opprowal from the engineer. Undess noted otherwise oll welds
ore to be 5.0mm continuous fillet wetds (C.F.W.).

7. The engineer is lo be privided with steelwork shop drawings for approval
prior to fabrication,

1. All materials ond workmanship to be in accordance with ASI700 1998.
2. Minimum masonry strength fuc=tSlpo

3. Mortar mix 1: 1/2 : 5 (cement:fime: sand)

4. All cores to be cleaned ond free of all mortar fins prior to grouting vin
cleon-out blocks at the base of the wall.

5. Minimum Grout strengih f'c=20MPa (300kg/m3 min. cement) with o
maximum aggregate size of 10mm. Compact grout down full depth of core
with plain rod oF similar.

7, Minimum cover to reinforcing is 20mm from inside face of block. Bars to
be arranged as shown on associated details.

B. Walls to be waterproofed where indiceled on the drawings. Waterproof
membranes instolled in strict occordonce with the monutoctures
requremenis.

Matt 31/08/2006 $42 Ale W11S-N.deg

SN8 CONSTRUCTION

SCCsmi' sa "pata &

18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634

Title: GENERAL NOTES
Project Lot 161 Orealla Cres,
Sunrise Beach.

 

| Date: May 2006 | DrgNo. 16115-N

Page 49

DRAWING SIZE ~ A2

  

4
[AH

Natural Ground (
Ni2 @ 400

Horizontal &
Vertical

ctf
Vea end

   
   
  
  

ena

Zan

 

‘les

 

 

= Py 400 Cog
a
H < 1500 ~ Ni2-400
a H < 2000 ~ NI6~400
a CS 3L12TM top & botio
“if R6 figs 450 ctrs
N12 Full _
length 350 M12" 400
— Bose Widti
~ |
LEGEND
RW-03 Type 3 Retaining wall, refer detods
CW Gorden Wall Footing, refer 16115-St for details
— — WT — — indicates position of approved silt retension
fence.
FALL indicates direction of fall to surface levels,
(Ht) Indicates 3000(Lt) under ground holding tonks.

FILLING NOTES:

~The site is to be scroped cleor of all organic material and debris.

~ Any fill is to be clean gronulor material (ie. sand to a clayey sand
in accordance with AS1726) be tree of any organic material and hove
a clay content of less than 12% (Plasticity Index less than 25%, Linear
shrinkage of 15%). The proposed moteriol is to be inspected by SCG
Consulting Engineers prior to its removal to ensure its compatability.
— The fil is to be ptoced and compacted in accordance with
AS3798-1996 to a level sufficient to achieve o Level 1 certification
with a minimum retotive field density of 95%. Copies of compaction
test results shall be presented to SCG Consutling Engineers for
‘approval.

~ Filling and compacting adjacent exisiting structures is to be in
strict accordonce with the ossociated details ond specifcotions.

~ Areas where existing structures or trees are removed shali be
dockfilled with the approved fil material compacted in occordance with
AS2B70-1996 to achieve a minimum relative field density of 95%.

~ Any loose or soft materiat uncovered in the site preparation sholl
be removed and replaced with the approved fil material compacted in
accordance with AS2B70-1996 to achieve a minimum relative field
density of 95%

— Site drainoge and sit protection measures must be installed prior
to construction commencing.

WHERE NO RETAINING THE GARDEN

WALL {S TO BE GROUT FILLED MTH
Ni2~1200 CIRS VERT & HORIZ.

 

 

Longitudinal bors

 

 

Revision [Descripfon SsSC~sisz”
. Storm Water & Holding tanks added.
es

14/06/2008 14:39 AM

11.40.06.

 

Mait 1611$-OWl.dag

PROIR 70 CONSTRUCTION ENGINEERS

INDICATES SHEET PILING, DESIGN ANO
INSTALLATION BY OTHERS. BUILDER 70 CONFIRM
EXTENT REQUIRED 10 SATISFY CRITICAL DEPTH
LINE, PROTECTION OF NEIGHBOURING STRUCTRES.
(WINIMUM VIBRATION TECHNIQUES TO BE USED.
PRE~AUGERING OR BETTER) 70 BE WITHIN
PROPERTY BOUNDARY.

(N TO CONFIRM THE
CONTAINED HERE IN.

 
   
  
 
 

BUILDER TO MAINTAIN STABLITY
‘OF ALL NEIGHBOURING STRUCTURES,

 

DRIVEWAY CROSS OVER DETALS
TO BE tN ACCORDANCE WITH
NOOSA SHIRE COUNCIL'S STD 5 1
DRAWAGS 9005 & 9019, spot

CSW ==

9 ° ° vs

 
 

APPROVED N.S.C

KERB ADAPTOR oN,

EXISTING KERB AND CHANNELL
TO BE CUT AND REMOVED

AND NEW DRIVE WAY TO BE
WSTALLED TO N.S.C STANDARDS.

   
  
  

  

     

  

IS TO REVIEW CONTOUR SERVERY

(TO BE PROVIDED) ON BOTH ALOMENTS

 

5

1. Existing footpaths to be saw cut prior to removal

2. Crossings are not designed for commercial vehicles
3, Concrete driveway to be 125mm thk. excluding any
finished treatments, eg. stamping

4. Concrete surface tolerance +5.0mm over 3.0m

5. Concrete N25 in accordance with AS 1379 and AS
3600

DETAILS

6. Reinforcement fobric to AS 1304, placed central slab
depth.

7. Expansion joints to be 10mm wide wet tooled with
every 2nd mesh wire cut along joint.

8. One access point permitted for each allotment.

9. For curved driveways, maximum grades apply to inside
edge of curve

10. All services to be located and protected as required
Prior to work commencing

THE CONTRACTOR IS T0 INSTALL APPROVED SLT RETENTION FENCES

  
 
 
 
 
 
 
  
 
    
  

  

a? PRIOR TO COMMENCING ANY EARTHMIORKS. THE FENCE 15 10 BE
20-AGnm AGERECATE as i * 900() GEO-FABRIC SILT CONSTRUCTED ALONG THE LOWEST BOUNDARY AND RETURNED UP SIDE
HARD STAND Y s FALL DRIVEWAY Existing timber FENCE, FIXED TO SPIKES AND POURS 1 jo StF FUL STORUIATER EMTRAPWENT SRFACE

4 ; tin — ALLOTMENT WAIST ORAL TONARDS
consmucTon LOTT, ff gh fp aap relcining wal ee INTO STABLE AND SHALL NOT ENTER MEGHBOURING ALLOTMENTS THROUGH
fog? , OF SURFACE BUMDING OR SCOUR PROTECTED DRAINS, THE
EXISTING ORIVE WAY 10 BE i FENCE MUST REMAIN JN PLACE UNTLL SUCH TIME THAT FISHED
SMASHED AND REMOVED AND i AMDSCAPING AND DRAINAGE MEASURES ARE WSTALLED
KERB AND CHANNEL TO BE
REWSTATED 1 HSC APPROVAL.
ED ¢ noe
APPROVED S.C i
KERB ADAPTOR eee
OR NO 1200(L) 50 Sq. HOWD SPIKES,
1800 ctrs DRIVE 600 INTO
g GROUND.
im wo
>
S TYPICAL SECTION ~ SILT FENCE
©
A
m7
w” a
| is footing
20-40men AGGREGATE a J. without piers 1
HARD Sta oveRAY is founded | The builder/contractor
FOR DRIVE WAYS DURING "Existing timber . above critical | shall confirm all relevant
i retoining wal This footing is depth line and’ levels prior to
Hil: founded below is unstable. | commencing works.
! critical line and is \——tine of
EXISTING KERB ANO CHANNELL : stable. — Lire
TO BE CUT AND REMOVED j proposed Pool
AND NEW ORIVE WAY TO BE; i Excavation or
INSTALLED TO N.S.C STANDARDS. i Piers supporting strip other trench.

60001 -

e °

 
  

INDICATES SHEET PILING, DESIGN AND
INSTALLATION BY OTHERS. BUILDER TO CONFIRM
EXTENT REQUIRED 10 SATISFY CRITICAL DEPTH

Dashed line indicates
Slab thickness for

 

felioning wal UNE, PROTECTION OF NEIGHBOURING STRUCTRES.
(MINIMUM VIBRATION TECHNIQUES TO BE USED.
PRE-AUGERING OR BETTER) TO 8E WITHIN
PROPERTY BOUNDARY LINE. EXISTING
_ ony CROSS FALL wo
sl eh oan ee
Sis 1000 midde PLAN

(Scale 1:200)

 

Sow cut ond Compacted on-site.
breakout BARRIER, SEM-MOUNTABLE, MOUNTABLE sand bed
back of kerb KERB & CHANNEL OR INVERT CROSSING,

(Scole 1:20)

Depth determined

footings or post pad
footings founded into
selected material and below
critical line are considered
stoble.

CRITICAL DEPTH LINE

  

NOTE:

THS DETAIL ALSO APPLIES TO
EXISTING FOUNDATIONS ON
NEIGHBOURING PROPERTIES. SHEET
PILING MUST BE INSTALLED WHERE
EXISTING FOOTINGS WILL BE
FOUNDED ABOVE ANY EXCAVATION
CRITICAL DEPTH LINE

Issue: CONSTRUCTION

SCO mai" “pauses ©

ABN 40 096 481 899

18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634

Title: Operational Works Plan.
Project Lot 161 Orealla Cres
Sunrise Beach
Date: May 2006 | Drg No. 16115-OW-1|"" A

Loy back Kerb &
Chonnel to S.C
standord.

     
 

MATCH EXISTING
CROSS FALL

   

 
   

 

   

  
  
  

Extend sub-bose 150mm
passed back of kerb.

 
 
      

Subgrode preperation,
refer generat notes,

  

PAVEMENT MATERIALS
25mm Asphollic Surfacing to N.S.C specifications

150 Base course type 2.1 CBR 80

150 Sub-base course {ype 2.3 CBR 45

Sub-grode preperation in accordance with specifications /notes

LAY BACK KERB & CHANNEL

 

Rew, - $001.95

Page 50

  
  

DRAWING SIZE - A2

BUILDER 10 MAINTAIN STABILITY

OF ALL NEIGHBOURING STRUCTURES,
REFER CRITICAL DEPTH LINE AND
16115-OW1 FOR LOCATION AND GUIDANCE.

ALLOW FOR ANCHORED SHEET PILING BY
SPECIALIST CONTRACTOR. MINIMUM
WBRATION TECHNQUES TO BE

USED. PRE-AUGERING OR BETTER.

 

LEGEND

~ (Sty
%

$3
SF-01
F-02
IF-O1
IF-02
RW-O1
RW-02

RW-04
RW-05

GW
Ww

=
e

‘3S ¢
nm —-—

Oz
7

Denotes stepdown, refer Architectural plans
for step Hi.

One piece of SL11TM fixed to underside of
slob mesh @ 45 deg. to corner, Length os
indicated.

300(m) x 400(d) internat slab beams refer
drawing S2 for detoils

350(W)x450(D) Perimeter Footing refer
drawing S2 for details

500{W)x450(D) Strip Footing refer drawing
S82 for detais

350KW)x450(D} internal Footing refer drawing
S2 for details

500(W}x450(D) Internal Footing refer drawing
$2 for details

Type 1 Retoining wall, refer S2 for detois
Type 2 Retoining woll, refer S2 for details

Type 4 Retaining wall, refer S2 for details
Type 5 Retaining wall, refer S2 for details

Garden Wall Footing refer drawing for details

Widen footing to dimensions shown
provide 2xSLB2 mesh sheets bottom,
extend footing cage through.

Denotes wet tooled joint to terrace slob, refer
to details on drawing S2.

125 Thk. Driveway slob on compacted
material, SL82 mesh, top 40 cover,
Flexible joint ogainst mosonry/concrete.

450 dia. concrete footing piers, 2.0m ctrs
mox. 1800(D} or founded 300 into NATURAL
MEDIUM DENSE SILTY SANDS, omit where
footings founded 300 into NATURAL MEDIUM
DENSE SILTY SANDS.

350 dia. concrete footing piers, 2.0m ctrs
max. founded 300 into NATURAL MEDIUM

DENSE SILTY SANDS, omit where footings

founded 300 into NATURAL MEDIUM DENSE
SALTY SANDS.

 

 

 
   
   
   
   
    
      
      

PRIOR 10 CONSTRUCTION ENGINEERS
IS TO REMEW CONTOUR SERVEY
(TO BE PROVIDED) ON BOTH

ALOTMENTS IN TO CONFIRM THE
DETAILS CONTAINED HERE IN.

 
 

PIER REINFORCEMENT

 
       
 

   

0 - 1200 None required
4200 - 2400 42 - N12, R6 Ligs 600cts
2400 ~ 4500 44 - N12, R6 Ligs 600ctq

— Pier senlorcement to de Si Hi and be cogged aad Ingped 400
‘with fooling top reiniorcenent,
~ Minimwn Rentorremant Cover; SOrem

 

 
 
    

PRIOR 70 FILUNG, REMOVE ALL TOPSOIL, LOOSE
OR DISTRURBED MATERIAL. FILL TO CONSIST OF
CLEAN SAND WETTED AND COMPACTED IN 150mm
LAYERS 10 ACHIEVE 95% Min. FIELD DENSITY.
COMPACTION RESULTS 70 BE PRESENTED 10 THE
ENGINEER FOR APPROVAL PRIOR TO SLAB
PREPERATIONS.

 
  
     
    
    
 

 

REFER 16115-OW! FOR
EXTERNAL GARDEN WALLS

AND RETAINING WALLS.

 

Matt 34/06/2006 11:31 AMM 16115-S1-S2. dng

2/N12 Horiz. Bor
ta Bond Beam.

    
 

Top of Wall

  

   
  

    

CULLMALLL Me
T__
> N12 Verticol Bars.
refer spacing toble.
POOL BY
OTHERS
Provide N12 N20 compacted grout
Horizontal bars at filing to all cores
1000 ctrs.
GARDEN WALL REINFORCEMENT
10mm Joint, mastic Besser control
fill if wot rendered. pint blocks.

Block garden wall to
be built off pool shell.
refer engineers drq’s
for detaits,

3

OER. Existing timber

retaining wail

Omit footing piers where
footing is founded 300mm into
Natural Medium Dense Sand.

 
  
 
 
 
  
   

The builder /contractor
sho confirm oil relevant
This footing is depth line ond levels prior to
founded below is unstable

commencing works.

critical Jine ond is | .
stoble. Line of
propased Pool
Excavation or
Piers supporting strip other trench.

footings or post pad
footings founded into
selected material ond below
critical line are considered
stable.

Horizontal

NOTE:
PTH Li THIS DETAIL ALSO APPLIES To

EXISTING FOUNDATIONS ON
NEIGHBOURING PROPERTIES. SHEET
PILING MUST BE INSTALLED WHERE
EXISTING FOOTINGS WILL BE
FOUNDED ABOVE ANY EXCAVATION
CRITICAL DEPTH LINE

ALL FOOTINGS ARE 10 BE FOUNDED 300mm INTO
NATURAL MEDIUM DENSE SILTY SANDS OR
SUPPORTED ON 3506 PIERS AT 2.0m cirs
FOUNDED 300mm INTO NATURAL MEDIUM DENSE
SILTY SANDS.

     
     
    

   

N12 Vertical bars, in
grout filled core both
sides af joint.

(PROMDE AT 6.0m CTRS MAX.)

Cost-in starter bar
refer bor spacing
table.

 
 
   
 
  

150

 

Trench mesh SLIITM top
& bottom of equivalent.

R6 tigatures @ 900mm centres.

THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH THE
NOTES CONTAINED ON 16115-N.

 

Issue:

CONSTRUCTION

 
   
      

     
 

    

SGGstmchral= cei = peteccal @)

48 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634

Title: Footing and Slab Plan.
Project Lot 161 Oreatla Cres
Sunrise Beach
Date: May 2006 DrgNo. 16115-S1

 

  

Rav, - $0.01,05

Page 51

DRAWING SIZE - A2

   

   
 
  
    
  

      
  
 
 
   
  
   

  
    
 
 
 
 
 

 
  
   

Gt—staty = . ? UO slab . Uy. WS Matt 14/06/2008 11:31 AM 16198-S1~S2.deg,
Besser © block’ or mesh 0s Vopour Barrier, Besser 'C block’ or , Vapour Barrier,
equivalent. specified equivalent. | &
=~
Finished ground Finished ground 3 2000{L) Trench
sloping onoy at ; sloping away at / $ | 220 Concrete Stab mesh trimmers 2
1:20 min for Levelling layer. 1:20 min for Levelling layer. 2 b nS
1500mm_ mininus 1500mm minimu & |
q

N12 [email protected] Starter Bars @ 1000mm

   

3 z centres,400mm Cogged Ends.
SLIM Top & bottom 3 4LI1TM Top & Bottom Wall bors cogged
R6 Ligs ot 900. R6 figs 900 c/c 400 into slab.
Waterproof wall.
|

 
 
 
 

; 4506 Concrete piers,
350¢ Concrete piers, location ond depth as

location and depth os CEES) | noted on pion,
noted on plan. 500
~ (SF-01 TER

220 Concrete Stob

 
 

190 Block N20
grout fill

   
   

 

a

    
  

Woll bors cogged
400 into slab.

 

A Bars.

N12 © 400 ctrs
both directions

  
 

fins via cleanout

Slab mesh as per
blocks, prior to pour.

foating plon.

 
 

ee

  
 

  

   
  
  

N12 [email protected] ea and
pee)

 
 

190 Block N20
grout fil

    
 

 
 
 

SLIITM Top & bottom
R6 Ligs ot 900.

 

All cores cleaned of
debris and mortar
fins via cleanout
blocks, prior to pour.

200mm free draining

bockiill with agi pipe to

Ls» | outiet.

! ON ~ (IF=0 F NI2 @ 400 ctrs
220 Concrete Slab both directions

 
 
        
 
 
  
 

  
  
  

Slab mesh os per

     
 
 

   
 
 

    
 
 
 
 
 

   

 

 
  
 
 

 

              
  
 
  
 
 
       
   

 

    

   
  

     

         
 
 

tOmm Wet tooled 100 Thick t
control iat. \ Terrace slab. Wall bars cogged 200mm free draining
400 into slab. bockfill with agi pipe to
outlet.
N12 @ 400 ctrs oe C norte pers,
irecti iocation; and de; as
Slob mesh lowered to bottom 90 Block M2 both directions noted oh plan P
{40 cover). Cut every second 190 Bloc! ' a Natural Ground Pian.
wire along line of joint, grou N12 © 400
Horizontal.
TOOLED JOINT DETAIL Longitudinal nw
x= Waterproof wall ‘oncement n2 @
A Bars.
300 typ. 500 typ. 190 Hollow block -
grout fitted core
a mesh as per Ni2 @ 400 N20 compacted concrete bars os NI6 @ 400 centro.
cating plon. Longitudinal noted. z
. 2
= £
8 3
” 200mm free draining 3
backfill with ogi pipe to x
4/N12 corner bars outlet, E
(2 Top 2 Bottom 290 Hollow block ~ grout filled core 3
500 long legs. N20 compacied concrete bars as ~
noted , 1200 {h).
200mm free draining NIS @ 200 with 55
bockfill with ogi Pipe 0 cover to back face. THIS DRAWING AND ASSOCIATED DETAILS
~ | Ail cores cleaned of Slab mesh os per footing Longitudinal NOTES cee ON tee THE
Lop 3 - N12 bors < : debris and oro plon on bar chairs @ reinforcement N12 :
500mm with beam € Vapour borrier ~ fing via cleanout 800mm centres, @ 400
trench mesh. 3 continuous under slab blocks, prior to pour.
m

    
 

SSS" CONSTRUCTION

G CONSULTING ENGINEERS

ABN 40 098 481 899 ° civil ° geotechnical

18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634

Title: Footing and Slab Details.

Project Lot 161 Orealla Cres
Sunrise Beach

TYPICAL SECTION ~ WF ~ (RW
"1 Date: May 2006 Drg No. 16115-S2 P| —

 
   

    

N12 Starter Bars @ 400mm centres
cogged 200mm top & bottom.

SUT
———
3500 Concrete piers,

location and depth os
noted on plan.

1500

    
   
   

Stab
beam depth.

300

 
 

Trench mesh 3L1tTu {Class 'S’ or ‘M’ Site} or
Trench Mesh 3L12TM (Class 'H' Site).

 
  

500

   

Grode slab beom layer
base to perimeter 300

footing base.

    
 
 
  

. Strip footing hatched,
ion ~ nection to Footi A continued through WF.
$ per plan,

 
    

Rey, - 3001.05

Page 52

DRAWING SIZE - A2

LEGEND

ZZ ahha

89 x 89 x 5.0 Past (Galy)

Additional Vertical rod in grout filled block core
size ond number os noted.

Block lintel refer 10 detods.

3{No.) M10 Masonry bolts from bracing wall stud
lo core filed block wail, equally spaced up stud.

190 Grout Filled Block Walls, N12 Verticols ond
Horizontals at 800 cirs and full perimeter of all
openings, cdditional verticals where noted on
pion.

190 Grout Filed Block Walls, N12 Verticals and
Horizontals at 400 cirs and full perimeter of alt
openings, additional verticals where noted on
plan.

Reinforced concrete beam over refer 16115-S4

190 Grout Filled Block Retaining Walls, refer
footing details/sections for reinforcing detads.

Edge of slob over.

RS

Serer tareee SOO ae

2/N16

|
I
!
i
i
1

Edge of slob over.

Edge of slab over.

|

SSSSou

SSSSSSSY

ALL STUDS TO SHS POSTS WITK 6 146
WING TEK SCREWS EQUALLY SPACED.

ALL LINTELS
UN.0. TO BE
90x45 (F17) KD

 

Floor Deorer over.

POOL BY
OTHERS

Position end plate os
shown where post

Supporting sob/beam 250 Sq x 12 End
* Plate, 5.0 C.P.W 4/N12

ties but! weld & cast

10mm M.S. End

4/Ni2
Plates, 5.0mm N

Compacted N20
Concrete (hatched)

2/M12 Chemset 2/Ni2

bolis to stab, 65 ‘\

Min. slab edge
cleoronce. Ly]

/0'\ SHS/SLAB CONNECTION BLOCK UNTEL ~ BLt
\/ DETAIL DETAILS

  

 

14/08/2006 11:30 AM 96118-S3-59. deg

TIMBER FRAME SPECIFICATION NS
| UPPER FLOOR - LOAD BEARING |
P MEMBER ['SIZE/GRADE__| COMMENT |

Top Plate | 90x45 (FB) + | Not trenched
90x35 (F8)

Studs @ 450 | 90 x 35 (FB) | 2400(H) Mox.

Bim. Plate } 90 x 45 (F8) | Not trenched

90 x 35 (FS Where on slab
Noggins 90 x 35 (FB) } At 1100cis max.

LOWER STOREY OF 2 - LOAD BEARING
MEMBER SIZE/GRADE COMMENT
Top Plate | 90 x 45 (F8) | Not trenched
Studs @ 450] 90 x 35 (F8) | 2700(H) Max.
Not notched
Bim. Plate {90 x 35 (F8) | Not trenched
Noggins 90 x 35 (F8) | At 1100cts mox.
NON-LOAD BEARING

| MEMBER | SIZE/GRADE
Top Plate | 90 x 35 (F8}
Studs @ 450 | 90 x 35 (F8)
Btm. Plate {90 x 35 (F8)
Noggins 90 x 35 (F8)

THIS DRAWING AND ASSOCIATED DETAILS

MUST BE READ IN CONJUNCTION WITH THE
NOTES CONTAINED ON 16115-N.

 

Issue:

CONSTRUCTION
A CONSULTING ENGINEERS
SG Siuctural "evil —geotschncal GS)

ABN 40 098 481 829

18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634

Title: Wall Framing, Bracing & Tie Down Plan.

Project Lot 161 Orealla Cres
Sunrise Beach

Date: May 2006 DrgNo. 16115-S3 a

 

Page 53

    

DRAWING SIZE - A2 Revision

 

  

      

 
 
   
   
   
   
   
 
 

 
 

Matt 14/06/2006 11; 3t aly 1$NS-S1~S2.dwg

FLOOR FRAMING SCHEDULE
PWARKT SiZe/GRADE

| 245 x 45 (F17) KD doists @ 400 ctrs.
240 x 63 (LVL) Floor Beorer.

230 x 85 HYNE $7C Floor Bearer
Joists size wall plote
Double Joist, Nai lominoie

— Hyspon LVL ond Hybeam by Cortes Holt Harvey
— All exposed timber to be H3 treated.

ROOF FRAMING SCHEDULE

 
 
 
      
 
      
   
  
     
     

 

  

 
  

 
 

iar | SUE/RADE PROWDE DOUBLE JOSTS UADER ALL LOAD
ram Trsses 6 600 cre BEARING AND BRACING WALLS RLANING

   
   

— Hyspan L¥L ond Hybeom by Carter Holt Harvey PARALLEL TO JOISTS.
= All exposed timber to be H3 treated Trussed roof over
concrete slab.

     
  
   
     

    
 
 

Double joist located
under bracing
walt ond post

<
t
u
4
&
K
K
®
+
8
N
8
\
\
K
&
h

Tessas SSS TT LEE ELA SaaS a Se

  

et Sar RAS
ee ee Ke

——-—~—---— ; Double joist located
under bracing

Indicates the minimum structural depth of wall ond post
the suspended slob after falls for drainage.

cr Indicates load bearing structure under
- supporting the suspended slab.

50 Step ___ incase of sepdon to top surte SLAB_ARRANGMENT & FLOOR FRAMING PLAN

of the suspended slob.

 
   
  
  
  
    
 

   
  
  

THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH THE
NOTES CONTAINED ON 16115.N.

  

Reinforced concrete beam, refer
16115-S5 for detcils Issue:

  

 
        

  

 

CONSTRUCTION
SCG gncunl™ Ga “fodednal @

ABN 40 098 481 899

      
  
   

   

Denotes 3/N12 bars 2000(L) fixed to
bottom and top steel.

 
      
    

  
  

(A) 125x75x10 Angle cleats for timber beam
LX” connections, 2/M16 each leg, BOmm Min. end

ceorance on afl timber holes. 18 DUKE STREET SUNSHINE BEACH QLD.4567

Ph (07) 5447 5544 Fax (07) 5447 2634

     
   
     

(Pu) Indicates support post under sefer lower bracing ‘
ite: First Floor Framing Plan.
(LU) Indicates Lintet under refer lower bracing plan ramming
for type/size.

Project Lot 161 Orealla Cres
Sunrise Beach
Date:; May 2006 DrgNo. 16115-S4

L/B Indicates load bearing wall under.

Page 54

 

SS-SLLOL “ON Big 9002 AeW :ayeq

 

 

 

é
Dis - 4)

yoeeg esuuns
$219 BIIEGIQ 191301 yelod

‘ 6)
NOLVION HSIN VS W130 0} paxiy ()a00e 5309 TINS sayouaq YW

 

 

 

 

 

 

 

 

 

  

 

“URI JuewW UIs SJOIOUO: 78 0-804 * Wwe ad ren
id BOUOJUIOY 1) [ORL ape jo wopoq spva yo 509 092 19491 ‘woag ayasou0s pasioymey $O~GOY
Ysow uaym asa WO}}Oq e 6 | O6t |
pegs Lyre (20) xe4 bess Lys (20) Ud 40 do} sau uayH ane BI $2 002 @ “qos papuadsns ayy jo
299¢°01D HOV3 SNIHSNNS L3aYLS Sina e+ doy 40 voqaaap sayos%pu) £ oen/z Son-OUM aanjsns doy 0} unopdays jo avy; sayooypUy SS 05

 

 

668 LGh 860 OF NEV e

\ areocl — nas» eamas )A)8 INGREDY TE WO NOLVION BYE

SUZ3NIONS ONLLINSNOD
1843 plo} 3

“qois papuadsns a4) Sunsoddns Cr3
Jepun aunjonuys Bulpag poo; sajooipyy ~

 

NOLLONYLSNOD na (y)

cansst ' , ZIN/z

 

 

 

 

Day HOI
sung (9)

  

 

“NSLIGL NO C3NIVINOD SS0N Pee (@) fete 4----*= 7
3H HIM NOLLONNINOD NI Vu 36 SMW av OO av OOF T4501 por
STIVL3 CELVIOOSSY CNY ONIMVUC SIHL sung (9)

$109 N OU asoym
dol ysan 72675

 

 

 

 

 

 

LNAWSFOYOANISY dOL LNANFOSOANIZY WOLLOE

 

 

 

 

 

        
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     

       

 

 

 

    

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a ae oe LIP TT LALAAP CCCI ALhe RE COLES O EL
t { t
v
t +
VSL ATIF IIT TT LEILA IIIT. v PEI TTT TOPS AIAI IIT TPP CLT 6
Vif EEE LEELA SIAL Lh ELE LL EI r PEEL ALLL ELAS A hh Eh LEE LO od hh heh EEE r
¥ v r ¥
4 v ra ¥.
4 } ‘ (na) ;
A A fd -
wo Vr,
ta f (a}ooz-ziN 14 f
a r | f
enh hd heh bahay lat A RL t
r _ f y Y f
4 if 2 t ¥
4 ° b 4 b ° t
4 ¢ x +4-—— (0}002-ZIN 4 t F
4 v Ss v Ei vy r
4 bk Qo v 4 r ¥
4 ¥. ¥ 4 ¥) v
A F. Tv 4 ¥. ¥,
4 r Jt SS ZX 4 t v
f po oes + qresscceesesesssesdienapo: an we i $ret rrr E r pe an npetessessecscersendhes rmmaore or srr 24
t 1 Ht 4 _ j ft 1 ul a
} f i H u a 10-804 ‘ H i 40-804
) ¢ J u i a a u
; E ti 4 t
f fi 4 t
4 v " 4 b
4 f i 4 ¢ (a)ooz-ziN
4 ¥ " 4 ¢
“doy 4 v " 4 t ne
— Yr a ~
WpOW 2615 j Ho ocomooabeara a 4 t ne encockos >
4 r et eee eee std rah ohhh LLLEELLEA | r LE lA ht ho ee ty helhhonhihatlnl nt ot te hak aL LEEELA 8
t rv u 1 i >
4 t < 0 ' =
3 f D7) % h fa
;
4 f (v)ooz-zin ——J t " A (¥}o0z-91N
4 £ 2 v u
4 t 4 t Ld
4 t 4 ‘
a v 4 v (4
4 v. ‘A ve fa
4 is 4 b r 0
4 ¥ bv.
— 4 —'
4 r 10-80¥ 4 ¢ " y 10-804
4 ¢ Lge mm -— —. _ _ — wer, A Y at Veet BS — —4
v _— ~poe oe ee 4 4 0 Cee Et x ee a 4
f t j y
3 f v 3 6 b
; t 3 j t $ :
b be
4 t ' (a)o02-Z1N 3 t =
b y a b mR 4
v r 4 v = v
¥. — r. 4 I bv 4
ee f Lecheboos sro t
¢ +
0 f 0 f
yy i
a1 (nd) t vA (nd) f
at b ra y
"a { b ta ¥
ORR 97, 7 EPRI t IFT P ET OPP v scree 07, 17 I ISITE ¥,
fh hh hhh hima mt ab ah oh A oh whe th hehe ha he IAS AN Nh hh he eee) r Mee ha bh LLL AAA A ah ah oth hh eh hhh be helatbad ib hhh he he he he ha hao be EES
Y ¥,
y SMGHLO O3L0N SSTINN ¢
t 002Z-ZIN Su¥a ( NOLO3UId =
t 6.
seeeeneeesenientnenenensnemsnasasnennntcts AvONOOSS) NOUNS seeeebcerolll eceeneschevlorsnsonersnsecd
‘suv
N HLM OO” d¥7 d30K0ud
Suva (4) uo (9) ON 3u3HM
“dOl HSIN 7671S IGAOYd
pee rSis-Si19i Pry ict sonz/sn/ts om

 

 

 

 

 

CY — JZIS ONIMVY

 

 

 

meq uopduoseq | uotsiAey

 

 

Page 55

-
DRAWING SIZE — A2 [A____|HDWO postadded to stirwellvod ——_—_—| 280808
LOC

nC

BRACING KEY Matt 14/06/2006 11:30 AM «1617S S3-S8.dag

Bracing panel length.

   

   

      
    
     
 

1,8 (PB) <—— Bracing panel type.

(PB) - 4.0mm F27 Ply fixed in accordance with the
manufacturers requirements to achieve
6.0KN/m

 
 

PROWDE 100x50 HDWD NAILING
PLATE TO TOP OF BLOCKWORK
AND STEEL UNTELS M12-900.

   
    
 

40mm Joint, mastic Besser control
fal if wall rendered. pint blocks,

 
   

 

             

Post connection to deck

nen Up as i
per architectural

race Le
detail.

N12 Vertical bars, RIGx400(L) Galy dowel ALL STUDS TO SHS POSTS WITH 6 146
both sides of joint. top and mid Ht of wali, WING TEX SCREWS EQUALLY SPACED. oo
grease one end of ye

   

ie

i Lhd

        
    

 

   
   

   
 

   
   

   
 
  
 

     

  

   

 
 

    
 
 

    
    

 

  
    
       

   
   
       
       
     
     

7)
y)
dowet ond foom cop to g /O' ble Stud Wal
end, cast-in. Py—-— #9 F vot ouble Stud Wo Post connection to deck
- VR Bi ee as per architectural
MOVEMENT JOINT DETAIL | / A per archite
iy INT | Y es 90x45(F17} 4 detail
PL aa y (ww) BLT BL a Lintel
VAZPTZLEEAR— - 8 IEE % “I AF 6)
—— Py (Md
5 ‘ (P3)
Ss i a /
Slt a” 3 co
"5 1 ify 3!
|e is= 3
RE |
pater) Is= 8
1" Floor bearer ; \ =!
B , over. 3 3
& | 3 r
3 13 E __ Line of bearer over. (P4) Ss i a
3 's olf ~ TERT TTT de! | y
OL, (pp 2 Bi! de 38 Y
Dale Periods ee (6) y
. : Y
g 8 Lith 58 y
& gill Se (WB) Z
E, Bi PD MITT Ie a
dl F Line of beorer over. (pq) B 3
3) is s
= (P-1) f= =
Floor Beorer | hy | & a
Over. wr [xu 3
S| Se
5, 1 jas Z|
LEGEND | 3,
@ M12 Anchi id from top plate to first fh 5, 1 7
or rol ‘om ate to fwst hoor a
+ — — 4P3) Md) 2] (P3}
bearer/ioor stab. LLL LALLA N - 7 ALLY LLELELIE § =x 448) |
X M12 Boli from bottom plate to floor slab. 44H ox A (Md) BL BL . 90x45(F17) ‘.
HLL 1h Sd! y SN ____ Wtinte SY Post connection to deck
o Additional Vertical rod in grout filled block core (P3 — — — +463) y . as per architectural
, | .
size and number as noted. y detail.
——= Bracing panel, refer brocing key for size type iy — * jouble Stud Wall

   
  

|

and strength.
BL1 Block fintel refer details.

 
 
   
    
  
     
 
 
 
 
 

Post connection to deck

   
  

   
     
    
   

(P2) 89 « 89 x 3.5 SHS Post as per architectural
(P3) 180 x 190 HOWD Post deta’. THIS ST OD OUNCTN DETAILS
MUST BE READ IN CONJUNCTION WITH THE
(4) 100 10 OH Pot FIRST FLOOR WALL FRAMING BRACING & TIE DOWN PLAN NOTES CONTANED OWEN
¥ (we) 3No.) M10 Masonry bolts from bracing wall stud Issue:

   
  

to core filed block wail, equally spaced up stud.

CONSTRUCTION
CONSULTING ENGINEERS
i: qouachcal @)

CCl a

ABN 40 098 481 899

18 DUKE STREET SUNSHINE BEACH QLD.4567

    
   
  

   
 

190 Grou! Filled Block Walls, N12 Verticals ond 390

Horizontals ot 800 ctrs ond full perimeter of all
openings, additional verticals where noted on
plan.

     
   

4 /N12.
20 MPa compacted
grout.

    
 
  

390

 

puma 190 Grout Filled Block Walls, N12 Verticals and

       
 

Horizontals at 400 ctrs ond full perimeter of ail .
openings, additional verticals where noted on Wi0 Ligs @ | 199 Besser Hollow Ph (07) 5447 5544 Fax (07) 5447 2634
plan 200 crs. block.

Title: First Floor Bracing Pian.

Project Lot 161 Orealla Cres
Sunrise Beach

Date: May 2006 DrgNo. 16115-S6 | — A

(iJ) Blockwork movernent joint, refer detail. BLOCK LNTEL ~ BLI BLOCK PIER ~ BPI
C : 5 DETAILS DETAIL

(eP-1) 390 x 390 Block pier grout filled, refer details.

  

>

Page 56

[Revision :
DRAWING SIZE — A2 0806
a Ca

 

  

Mott 14/06/2008 11:31 AM 18115—S1-S2. deg

      
 
  

        
 

FLOOR FRAMING SCHEDULE
PMARK | SWZE/GRADE

Hyne Hi 30070 uoist © 450 ctrs
170x45 (LVL) Joist @ 450 ctrs
150x50 (F14) Joist @ 450 ctrs
Hyne HI 30070 doists @ 400 ctrs
200x75 {F14) Floor bearer
300x45 (LVL) Floor bearer

250 x 75 (F14} Floor Bearer
175x75 {F14) Floor bearer

230 x 85 Hyne 17 Floor Beorer
2/300x45 (LVL) Floor bearer
doist size wall plate
Double uoist, Nai laminate

— Hyspon LVL and Hybeom by Corter Holt Harvey
— Al exposed timber to be H3 treated.

ROOF FRAMING SCHEDULE
J MARK | _SWE/GRADE

  
 

 
 

    
   
 

 
   
 

     
 

 
   
 

 
 

PROWDE DOUBLE JOISTS UNDER ALL LOAD
BEARING AND BRACING WALLS RUNNING
PARALLEL TO JOISTS.

 

 
 

       
 

      
 

     
 

   

   
  
  
 
 
  

“ido (F14) Rafters @ 900 ctrs

1/M16 x 150 (L)
chemset into top of
block work from FBS TR

Sesrea ere: fd tard ax
or * ———y

rs

 
     

peewee eee eee

  
 
 

+r

TOVT IGT:
LAL LAL E:

 
 

z

 
  

 
 

   

 
 

peer
bane

  
 

 
 

  

 
   
 

 
   
 

    
 

    
 

(Puts 15x50 (F14) Roof Beom
| 175x50 (F14) Roof Beam
1— il a 2/150x38 (F14) Hip Rafters
1/M16 x 150 (L) a | Trusses @ 600 ctrs
chemset into top of | | = All exposed timber to be H3 treated
i]

 
 

block work from FB&

Ju

   
 

   

rf
Rrorezpre724

     
  

j
| 47 FBG (Pu) FRB

     
 

  
 

I te 7 tS tw =

ROOF BEAMS TO BE FULLY ay) pat we (ye er 2a WP é
Eto Mer Poor PROOFED ce Cae

Li iT gl ® ex (4) w

 

NS
e vo 2
Ee

-@ . 2) FBE (Pu) FBG LOTT 2a274

—

1
=
w)

    
   
  

  

 
 

= } a 8
CE 1/ut6 x 150 (L) & cay)
i Dd "$j chemset into top of |

 
  

Hatched area indicates kt
inf joisis, pack out

         
   
 

     
 
  

  

to sult. i block work from FRE s I 5
1/416 x 150 (L) t i i
chemset into top Bi 3 $ f
of block Pier. i 4 pu)

= '
7 it ale Wf POL
it Pu) RBI < (Pu 5 i
biezreer ~ Zz a TTR A ed
<< 5 4 DUM
(PU ae v) TR
—RB

 
  
 
 
 

nn

r

SILESVI NAT NT
BNSAANALAS SANS BAD:

125x50 (F14}
Rofters @ 900 cirs

 
    
 
 
 
 

   
 

THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH THE
NOTES CONTAINED ON 16115-N.

 

   

75x75x8 Angles
2/M10 each leg,

 
 
  

 
   
 

issue:

 
  
   

CONSTRUCTION
+. CONSULTING ENGINEERS
SCG structural - civil - geotechnical S

ABN 40 096 481 898

18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634

Title: Second Floor Framing Plan.
Project Lot 161 Orealla Cres
Sunrise Beach

 
  
   

     
  

LEGEND

‘Ay 125x75x10 Angle cleats for timber beam
L’" connections, 2/M16 each leg, 80mm Min. end
clearance on all timber holes.

 

 

     
  
  
   

      

     
 
 

(PU) Indicotes support post under refer lower bracing
plan for size,

(LU) Indicates Lintel under refer tower bracing pion
for type/size.

       
 

(c) !Omm M.S. side cleat to steel beam for beam
| connections, 2/M16 for timber members 80mm
Min. end cleorance on all timber holes or 3/M16
for steel members.

      

So
2
&

: May 2006 DrgNo. 16115-S7 _

Page 57

DRAWING SIZE - A2

BRACING KEY

Bracing panel length.
1.8 (PB) <—— Bracing panel type.

(PB) - 4.0mm F27 Ply fixed in accordance with the
manufacturers requements to achieve

6.0kN/m

TIMBER LINTEL SCHEDULE
UPPER FLOOR OR SINGLE STOREY
LOPENING | _Mox. Roof width supporting. _|

90 x 35 (F8)
90 x 35 (FB)
90 x 35 (F8)
90 x 70 (F8)
90 x 70 (FI?)

90 x 35 (Fa)
90 x 35 (F8)
30 x 70 (F8)
90 x 70 (F17)
120 x 70 (Ft7)

14/06/2006 11:30 Aw 1B115~S3--S0.d09

TIMBER FRAME SPECIFICATION NS
TeWeER | SiZe/oRADE | COMMENT |

Top Plate Not trenched

Studs @ 450 | 90 x 35 (FB) | 2400{H} Max.

Btm. Plaie Not trenched
Where on slob

Noggins At 100cts mox.

LOWER STOREY OF 2 - LOAD BEARING

| MEMBER | SIZE/GRADE | COMMENT
Top Plate 90 x 45 (F8 Not trenched
Studs @ 450] 90 x 35 (F8, 2700{H) Max.
Not notched
Bim. Plote | 90 x 35 (F8} | Not trenched

Noggins 90 x 35 (F8} | At 1100cts max.
NON-LOAD BEARING

| MEMBER | SIZE/GRADE | COMMENT

— Trusses ot 600 cirs. Wax.

~ Truss manufacturer 10 confirm Isitel
sizes supporling girder trusses,

— Untels noted on plan supercede those
listed above.

~ Maximum roof width token os octuol truss
top chord leng gth).

TIE-DOWN SCHEDULE
Battens - Trusses 1/Batten Screw
Truss - Top Plate 1 Looped Gi Strap
Ralter - Top Plate 1 Looped GI Strap
Top Plate - Slab M12 Rods, 1800 cirs max.
Rafter ~ Roof Beam | 2/Framing Anchors
Woll Plate - Stud Wall] 2/100mm Batten screws
Wall Plate - Block Wolll M12 Bolts, 600 cirs
Roof Beom - Posts | 2/M12 Bolts
Roof Beam - Brk Pierd 1/12 Cast-in Bolt
Posts - Bearers 2/M12 Bolts

Comments:

Batten Screw— Wo.14 Type 17 Screw, provide 43mm min.
penetration into recieving .

Maximum truss widih 6.0m

All frorning onchors ond straps io have 4/2.8mmé nails
each end.

Roof truss design, brocing ond girder truss tie-down by
truss monufacturer.

LEGEND

@ Mt2 Anchor rod from top plate to floor frome.
X Mi2 Bolt from bottom plate to floor frame.

——— Bracing panel, refer bracing key for size type
and strength.

* es) A{No.) MIO Masonry bolts from bracing wafl stud
to core filled biock wall, equally spaced up stud,

Uda +90 Grout Fited Block Walls, N12 Verticals and
Horizontals at 800 ctrs ond full perimeter of of
openings, additional verticals where noted on
pion,

{P3} 150x150 HDWO Post.

 

Top Plate -
Studs © 450 | 90 x 35 (F8) ~
Bim. Plate

Noggins

Lower trussed

THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH THE
NOTES CONTAINED ON 16115-N.

Issue:

CONSTRUCTION
QA/A CONSULTING ENGINEERS
SCG sirucloral= ch - pootachncal

ABN 40 098 461 899

18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634

Title: Second Floor Bracing Plan.
Project Lot 161 Orealla Cres
Sunrise Beach
"| Date: May 2006 DrgNo. 16115-S8

 

Page 58

DRAWING SIZE - A2

Stud sized sheor blocks,

Roof truss 6/3.5mme nails each

  

Stud sized noggin,

—S==_h___ 6/2.8mm6 nails each foce.

SN O18
Bracing woll_—o i Clearance belwces “uss
between noggin ond plate,
and plate. ‘

 

DESIGN STRENGTH ~ 3.0kN (F5 & F8 Pine) DESIGN STRENGTH ~ 3.0kN (F5 & F8 Pine)

Truss perpendicular to Bracing Wall

2/30 x 0.8mm Gi .

Straps 6/2.8mm¢ nois Bracing

each end. | Panel .
100
Max,

End of Bracing
Panet tie-down

Tie-Down Requirement

  

External Wall.

DESIGN STRENGTH - 6.0kN (FS & FB Pine}

Bracing Wall to External Wal! SPs
[\
N

Anchor 10d or

bat ob ected bearing/Bracing wall. Anchor rod or beoring/Brocing wall

bolt as specified.

   
 
 
  
 

i
Load Load \2

  
  
 

Floor Joists, 1 Framing
anchor each end,

Two nailing plates each Solid timber blocking
end 6/2.8mmé nos piece 100x50 on edge
eoch face. min.

Double foor joists

4 Floor Joists, 1 Framing
nail fominoted.

anchor each end.

Wall to timber floor fixing

Stud Wall.
Anchor rod
or bolt as Floor doists, 1
specified. Framing
anchor eoch
end.

    

10 Side Cleot
Smm C.F.W. and
bolts os specified.

Intersecting UB,
Notch end nto web
of UB

Solid timber
blocking pieces.

Solid fimber
under—batten.

LEGEND

@ =Mi2 Anchor rod from roof beam {o floor frome.

(a) '25x75x10 Angle clects for timber beam
LC” connections, 2/MI6 each leg, 80mm Min. end
Clearance on ail timber holes.

 

{PU) Indicates support post under refer lower bracing
plon for size. / Angle cleat
(LU) Indicotes Lintel under refer lower bracing plan Root and batts as
for type/size. Beom specified.
A) = Ti q I

Top Piate

 
 
 

  
  

Bottom Plate

Anchor Rods / Bolts as

  
  

  

per plan.

i
Me
WOTATTATA

i WHER +H HH Le
ao PHL LII LD Lib ob

ara WITATMITAT~ ~
lt RIA

 

tOmm Joint, mastic
fill if wall rendered.

Besser control
im blocks.

N12 Vertical bars, |

R16x400(L) Goly dowel
both sides of joint.

top ond mid Ht of wall,
gfease one end of
dowel ond foam cap to
end, cast-in.

 

BRACING PANEL SPECIFICATION (mmin/m)

[Mork] Type___TS. Edge [5. nt. [Strengt]
150 «| 300 6.0

4mm {Ft1} Ply

2
= 6mm Villaboord
£ 6mm Hordiboard 42)
6mm Fibre Cement
10mm Plasterboard
(1) Hardboard includes Hordifiex ond Horditex Sheets,

 
 

  
   
    
     

~ Wirionum clout size 2.86 x SOmm, 40mm Plasterboard clouts for Cyprock,

3/u16x150
(Chemsets
where fixing to
block work.)

37

bos

PEC

Strap lintel to top plate
as per TRADAC W41N,

 

~=— vomb studs os
nominated.

NOTE:

Any detail not nominated herein
shall be in strict eccordance with

the N3_ Timber Froming Monuat

Box gutter & fire
separation as per
orchitecturol detail.

80 Min, end
clearance on holes

 

 

Verticol
Reinforcing
os noted.
Horizontal
Reinforcing
Gs noted.

Storter Bar
Bars lapped
with vertical

wall reinforcing.

Slab Mesh.

50 Min. side

50 Min. side
TA Clearance on holes
Angle cleat ond
Truss Chord MI6 bolis as
specified.
U LOCK ON
Extend end piate if Extend end plate if
seqd. for minimum reqd. for minimum
bolt centres foe} bolt centres
PFC os Tel! up as
ecified } ified
‘on us, */l6riS0 tte F ft ‘on MS.
End Plate 5.0 (Chemsets where ie |” fd Plate 50
CW. mang CF.
work.)

Bolts into Grout filed block or 20MPa conc.
Minimum boli to bolt spacing - 100mm
Minimum hole edge cleoronce - 70mm
Max. 18@ Hole, brush ond oi cleaned

(EP) ~ END PLATE DETALS

   
  

30.01.05

Rew,

 

Mott 14/08/2008 11:31 AM

ROOF FRAMING SCHEDULE
MARK | SIE/GRADE

RBt [2/170 x 45 (Fi7) KD Roof Beam
TR Trusses @ 600 ctrs.

— At exposed timber to be H3 teoled. Laminated
Beoms to service class 3

16115-S1-S2. dwg

   
         

      

   
 
  

\\

A
N

 
 
   

a

Ate

WINDOW OPENING lu EL

Pei? TY 7
(Att

 
 
 
 

 
  
  
 

a

hy

 
 

     

fT eT

   

THIS DRAWING AND ASSOCIATED DETAILS

MUST BE READ IN CONJUNCTION WITH THE
NOTES CONTAINED ON 18115-N.

 

Issue:

CONSTRUCTION
C yA CONSULTING ENGINEERS
SOG suctra - Givil - geotechnical

18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634

Title: Roof Framing Plan.
Project Lot 161 Orealla Cres
Sunrise Beach
Date: May 2006 Drg No. 16115-S9

    

 

   

       
    

     

   
    

|

Page 59

DRAWING SIZE - A2

Increase pool wall
thickness to 200mm

where supporting
Hockwork walls.

4 ~ $12 horizontal bars,
continuous, equally spaced in edge
thickening.

S12 @ 250 vert &
horiz. u.n.o.

(placed centre}
(900 Mox. wall ht)

Existing timber retaining wall

—

POOL PLAN

This footing is
founded below
critical line ond is
stable.

Piers supporting strip

footings or past pad
footings founded into
selected material and below
critical line ore considered
stable.

This footi
without piers The builder /contractor

Is founded | shall confirm all relevant
above critical levels prior to
depth line and commencing works.

is unstable.

|=—tine of proposed
Poot Excavation or
| other trench.

R16x400(L) Dowels (Galv)

Hydrostatic pressuse relief valve to
current Australion Stondard. Sealed
and bonded to pool floor in
accordance with the maufacturers
specification.

$12 @ 100. centres. Fall.

Skimmer box in
accordance with
AS1926

Locate skimmer box
$0 flop faces
prevailing wind.

$12 @ 100mm centres
round skimmer box.

Approved joint
sealing tope over
Skkoflex capping.

Hydrotite waterstop Abelflex. between

strips both sides of .
and full length of Hyerotite strips.

250 Min

@ 600ctrs with one end Hydrocast 'EX’

greased and fitted with on
end cap.

CRITICAL DEPTH LINE

waterstop to wall ond
floor Min.

CONTROL JOINT DETAIL

4 — S}2 horizontot bars,
continuous, equally
Spaced in edge
thickening.

Water tine.

460 Min.

S12 @ 250 vert
& horiz. u.n.o.
(ploced centre}

Notural Sirota.

Additional $12 - 250 vert placed
between other verts, extend past
radius os shown.(ie. $12~125)

100mm thick compacted 10mm
to 20mm clean crushed rock
filter media.

Continue $12 @ 150 centres around

valve in beth directions ~

lap=500mm

500mm x 500mm pit filled with
10mm to 20mm crushed rock (no
fines) fitter material.

Wrap in geotextile membrane.

Where radius less than
500mm provide
Additional $12-200
Horizontals, Between
moin bars.

Sl2 @ 250 vert &
horiz. u.n.o,
(placed centre}

STAIR DETAIL

S12 @ 250 vert &
horiz. u.n.o.
(placed centre)

GENERAL NOTES :

~ Poot to be constructed in accordance with AS 2783 and
council sofety requirements.

~ Concrete Strength Fe = 32MPo ol 28 days (effective
cement content to be not less than 280kq per m3} for pools
within tkm of large expanses of solt woter such as the seo
(but pool not to be constructed in tidal splash zones of salt
woter). Where pools are constructed more thon km from
large expanses of salt water (such as the sea) the concrete
strength may be reduced to 25MPa,

- Admixtures to comply with AS1478

~ Concrete slump 86mm.

- Concrete to be sprayed in 0 continuous operation ond cured
for 7 days minimum. This involves keeping the walls ond floor
surface moist in an appraved manner (ie. fog spray)
Alternatively the surface can be sprayed with confilm or
equally approved additive.

~ Rod concrete in walls to remove alt air pockets {only
vibrate in tight corners).

~ Do not use curing compounds which affect the bonding of
applied coatings.

- Reinforcement - All steel to be grade 250 S bors.
Reinforcement ~ minimum cover 70mm +5/-Omm

— Reinforcement iops 500mm for S bars,

~ All reinforcement bars to be continuous around all comers
and curves and shalt be lapped U.N.O.

Minimum stripping and/ or backfilling time is 14 days.

~ The final pool shape and layout should be approved by the
engineer prior to commencement of works.

~ All fences and gates surrounding pool area shail be in
accordance with AS1926.

~ The poo! excavotion shall in no way undermine ony adjacent
structures or services (Refer to critical line diagram provided).
The pool contractor /budder is responsible for obtaining afl
felevont levels and positions of adjacent structures prior to
commencing work.

Issue:

CONSTRUCTION
CONSULTING ENGINEERS

structural - civil - geotechnical

ABN 40 098 481 899

18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634

Title: POOL CONSTRUCTION DETAILS

Project Lot 161 Orealla Cres,
Sunrise Beach.

Date: May 2006. Drg No. 16115-PD

 

Page 60

 

 

1 . LAND USE SECTION FEES
ssw MENLO

 

 

 

 

 

 

 

. RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation 41145
APPLICATION FEES ©
Material Change of Use - Code/Impact : .
Consistent . 521
inconsistent 521
Assessment under Superseded Planning Scheme _ 521
. Modification to a Development Permit 521
Extension of a Currency Period §21
; r Operational Works - Landscaping I FO 524
Bldg Work assessable against the Planning Scheme . 521
PRE LODGEMENT REVIEW /
Half Hour -§22
One Hour 522
ADVERTISING
Purchase Advertised Applications . 523
JETTIES ,
Jetty Application Fee 524
Jetty Bond 50
BONDS
: * Performance Bond : : 50
SIGNS
Registration Fee . : 222
SEARCH FEE ; -
Search of Land Use Section file . . : 112
Liquor Licensing Request . 113
TOTAL $ PSO
NAME: ABer Gone atve~
ADDRESS: <f-~ Arann ty~  [fenned .
Po Bore LH Comroy te She >
FILE NO: o7/ 3% DATE: &/3(2>
RECEIPT NO: LIRTG _. Signature of TP Officer: ff S+.~-7
AUTHORITY. NO: : q

 

I++] aeog] 267/)

Page 61

 

CALCULATION OF FEES

 

APPLICATION

FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

[Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

MCU - IMPACT ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

OPERATIONAL WORKS
Details of Development

FEE CALCULATION

 

 

 

TOTAL FEES

 

 

Page 62

  

+ a EORORY.\

DEVELOPMENT FEES & CONTRIBUTIONS
(Cashier: Please Return to Admin Officer, Development)

 

APPLICATION DETAILS

BONDS | '

 

Payee Name:

Bond Refund Details

 

Address:

Payee Name:

 

 

Development Location:

 

Date application properly made:

| Address:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

P:/Land DevelopmenlFEES & CONTRIBUTIONS/DEVELOPMENT FEES.doc @

 

File Numbers or Reference: AMOUNT RECEIPT TYPE
Receipt No: AEX Receipt Date: Pel Deposis/Performance/Maintenance/ incompleted 51 (Cat 9)
APPLICATION AND GENERAL FEES AMOUNT RECEIPT TYPE | CONTRIBUTIONS | AMOUNT RECEIPT TYPE
Application Fees ” 540 Developer Contribution - Landscaping 550
Road / Drainage Plan Exam 4 &sS 541 Developer Contribution - Road Other §53
Road / Drainage Field Inspection “£50. 542 Developer Contribution - Drainage Other 554
Legal Document Examination 543 Developer Contribution - Pathway Other 685
Sealing Fee - Survey Plans, Legal Documents 544 Developer Contribution - In Lieu of Off St Parking (PSP13) 556
Sale of Documents, Policy Lists, Misc 545 Developer Contribution - Other Parks and Community 580
Bonding Admin Fee (Contributions, uncompleted works) 546 ICS ~ Sewerage (Rural) 557
Closed Circuit TV Inspection 588 ICS — Sewerage (Coastal) 613
Pre-lodgement Meeting Fee 549 ICS - Sewerage — South Peregian (Maroochy) 681
/CALCULATIONS  ~—~ —_ ICS - Sport and Recreation Land 559
Lot Calculation {CS —- Community Land 560
ICS - Drainage 581
ICS - Road 583
ICS — Pathway 584
Pian Examination Calculation ICS — Public Transport 561
ICS — Water Supply 614
ROADWORKS CONTRIBUTIONS = ZZ _ .
Catchment:
Inspection Calculation .
Road/Section:
Total of Fees Paid (Excluding Bonds) [$ 21S
7

 

Used in these records

About this file

File size
5.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0387 - Op Works - Landscaping, Carparking & Access, Frontage [As Published].pdf · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.