INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006

 

Land owner’s consent (if appiicable) 20. Land owner's consent to the making of this application:

Section 3.2.1(3) of the IPA prescribes that an i

application must contain, or be supported by, the Name Signature Date

written consent of the land owners, if the appfication

involves:

(a materiat change of use;

(i) reconfiguration of a lot;

(iii) work on land below high-water mark & not within 2
canal as defined under the Coastal Protection and
Management Act 1995;0r

(iv) work on rail corridor [and defined under the
Transport Infrastructure Act 1994.

Section 3.8.1(2}(a) of the (PA provides that

landowner's consent is nof required for a mobile or

temporary ERA.

Fer more information refer to Guide 4,

 

 

 

 

 

 

 

 

 

Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2.1(5) of the IPA requires evidence of quarry material on State coastal land under the Coastal Protection and Management Act 1995)?

resource entitlement be given for applications that

invoive a prescribed State resource, Oo NO - goto Q24 oO YES - go to Q22

Section 3.2.1(10)(a)(ii) of the IPA prescribes that an + as + .
application re en to be properly made 22. This application is accompanied by evidence: (tick applicable box)

witout enaenee oe one entitement (1 (i) of the atiocation of, or entitlement to, the resource - attach evidence and go to 023(v)
6 for cot in ee . . woe . . .
Refer to schedule 10 of the integrated Planning (1 (ii) the chief executive of the department administering the resource is satisfied the

Regulation 1998 that prescribes the nature of evidence i i ii i i -
retired by the Slat n support of fe lodging of tis development is consistent with an allocation of, or entitlement to, the resource - go

development application.
C1 (ii) the chief executive of the department administering the resource is satisfied the

development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go to Q23

Advice for completing 023 23. Evidence of the resource entitlement:
The information in (i) — (v} is mandatory if evidence is

required under 022 (i or i) above (i) Resource entitlement / authority details (vii) Official stamp of the department
The official stamp of the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the applicable)
application involves any water or riverine quarry (ii) Name of delegated officer
Sreton 3218) ls ea Cd
Section 321188) allows the resource Manager to init

8 time the evidence m; used, vi) must iii iti
completed ithe evidence time Ime. (ii) Position of delegated officer

{iv) Signature of delegated officer

 

 

 

 

 

 

 

 

 

 

 

 

 

(vy) Date
(vi) -_ date of evidence a
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
Pec ttn oo soo Beteromen CyYes (C1 NO - the assessment manager may refuse to accept this application on the
must be completed for all other applications. grounds that the application has not been properly made
Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:
An appiication shoufd be accompanied by details to . "
support tha proposat & enable the assessment Plan / Drawing / Report Number Title Date

 

manager, referral agencies and any person viewing
the application during public scrutiny or public
Notification to understand the scope of the proposal
and any potential impact.

 

 

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.

 

OFFICE USE ONLY (applicable to assessment manager's)

 

 

 

| EE 8) i DATE RECEIVING OFFICER'S | | REFERENCE
| RECEIVED NAME/S NUMBERIS
| Notification of Engagement of Private Certifier (Optional format)
To. Council. | have been engaged as the private certifier for the building work referred to in this application.

 

 

Date of engagement / / — Accreditation Number: __ Name: Signature:

 

Used in these records

About this file

File size
5.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0387 - Op Works - Landscaping, Carparking & Access, Frontage [As Published].pdf · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.