07/0387 - Op Works - Landscaping, Carparking & Access, Frontage [As Published] · 142007.387

of 62

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

———— Te

 

 

4

AU SMARGCS)

INNOVATIVE
BY DESIGN

GENERAL NOTES

The builder shall verify location of all services,
all dimensions and levels prior to commencement
of any work .

This building shall be constructed in accordance

with the Australian Domestic Construction Manual

(ADCM), Building Act and Building Codes of Australia

(BCA) relevant codes and regulations, and in

accordance to the TRADAC Timber Framing Manual,

and in accordance to all Manufacturer's specifications
oe installation details.

Set-out dimensions shown on the Site plan shall be
confirmed by the Builder before commencement of
construction & ordering of materials.

Positions of Down Pipes (DP) & storm water drains
and levels are to be confirmed before final grading.
The builder is to ensure that surface water (rain water)
is to be diverted from the envelope of the building

on all sides at all times.

Sanitary drainage shall be in accordance to the
local authority requirements & with the prepared
hydraulics drawings.

Check position of overflow relief gully & top
¢ siab level if required.

A final as build drawing shall be provided
on completion showing position of all services.

RUBBISH & DEBRIS

All materials deemed to be unusable shall

be placed in a rubbish compound ora industrial

bin and removed from the site at the earliest opportunity.

Scaffolding

All scaffolding shall be in accordance to the
Queensland Heath and Safety obligations

and the Workplace Health and Safety Act 1995

 

SITEWORKS

Refer to Engineer's drawings and details for all
reinforced concrete work, levels, Retaining Walls Details,
Driveways, Planter Boxes and any other

work involving Hydraulics or Waterproofing

RENDERING AND PAINTING

Refer to Schedule of finished and consult with the
Building Supervisor or Primary Builder for ail information
pertaining to finishes and colours.

NOTE:

These drawings shall be read in conjunction with

all other drawings, Engineer's drawings & specifications,
schedule of finishes and with such other written instructions
as provided by the principal Builder.

All and any discrepancies shall be referred to the project
manager or supervisior for decision before
proceeding with any work.

Any changes omissions or variations which the contractor
may wish to make shail be discussed with the designer
before any work commences

WATERPROOFING: Waterproofing to wet areas are to be
carried out in accordance with Standard AS 3740 &
relevant BCA codes and requirements.And sall comply with
B.C.A Section 3.8.1

TERMITE PROTECTION: The Builder shall provide

for Termite protection to be carried out by an

approved licensed Pest control specialist in accordance
with AS 2057-1986 or the latest AS 3660-1

FLOOR WASTES to be provided to all wet areas such
as Shower,Laundry, Bathrooms,

CONSTRUCTION shall be in accordance to AS 1170.1,
AS 1170.2 AS 1664, AS 2870, AS 3600, AS 1480,
AS2870-1996 and the standard Building Laws and
Building Code of Australia and relevant Codes and

the Australian Domestic Construction Manual for the
Terrain Category W41N

BRICKLAYER: Use galvanised wail ties 1 row at 2 courses
above flashing line & one row in the second last bed

joint from top of wall on each end of stud provide
weepholes @ 900 c/c's along flashing

REINFORCED CONCRETE WORK- Refer to Engineer's
details, drawings, specification for all Footings, conctere floors,
suspended slabs, WPM

TIE - DOWN information and Details
Refer to Structural Engineers Drawings and
Specifications

Artificial Ventilation or Mechanical Ventilation
is to be in Accordance to AS 1668 Part 2 -1980
3.8.4 &3.8.5

DISCREPANCIES

ANY DISCREPANCIES IN DIMENSIONS OF THESE
DRAWINGS SHOULD BE POINTED OUT TO THE
DESIGNER AND ANY DETAILS NOT SHOWN

SHOULD BE REQUESTED BY THE BUILDER IN WRITING.
NO RESPONSIBILITY IS IMPLIED FOR ANY INACCURACIES
OR OMISSIONS FROM THESE DRAWINGS

 

 

Michael Petrascu Designs

Tel/Fax: 07 54472996 Email:[email protected]

No. Description Date

 

Lot 1 Orealla Cres
Sunrise Beach Qld

 

 

 

 

P.O.Box 651 Noosa Heads Qid 4567 BSA 703843

 

Proposed Residences

 

 

 

 

 

GENERAL NOTES

 

 

Project number SRB-AUH-2006-01

 

 

 

 

 

Date March 2006 1 - Al 3
Drawn by Author
Checked by

 

 

Checker | Scale

Used in these records

About this file

File size
5.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0387 - Op Works - Landscaping, Carparking & Access, Frontage [As Published].pdf · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.