Skip to the record
The only place to find full transcripts.

Council archive · source document

07/0387 - Op Works - Landscaping, Carparking & Access, Frontage [As Published] · 142007.387

of 62

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

 

4

AUS MARC.)

INNOVATIVE
BY DESIGN BRACING REQUIRED 31-tkN

BRACING ACHEIVED 176.56Kn

TIE DOWN SCHEDULE ( Joint group JD4)

MEMBER CONNECTION METHOD OF TIE DOWN r a

Roof battens to trusses are Steel Top Hat Sections fix with Bega be 8 =

screws 33 mm penetration Ce

Standard Trusses -72 TREATED TIMBER

Max Span 7.0 m

1/m12 bolt ( or cyclone straps) refer to truss

manufacturers specifications and refer to Tie Down details

Top plate to slab or bearer or bottom plate

1/M12 tie down rod adjacent to each opening

at every corner & at 1800 max centres elsewhere
raters russes to pole plate

4/N10 bolt or with G.I. Strap

Joists to bearers supporting walls

2/75 x 3.10 mm nails min full penetration

Joists supporting bracing walls One

2/ M12 bolts one each end of panel

 

 

BRACING REQUIRED 48-SkN
BRACING ACHEIVED 93-40kN

BRACING

Speed Brace’ on top of trusses as detailed and
nailed with one 2.8f 75 nails to underside of top chords
at 45° to chords or use speed brace in accordance

to the manufacturers.

BRACING LEGEND

 

VB -Villaboard or Eq Fixed to manufacturers
Specs between anchor Bolts =2.00kKN/m

 

 

 

 

 

 

 

 

 

 

Minimum bracing requirements for bracing walls
: 1/M12 tie down rod to each end of bracing wall,
1/M12 bolt to bottom plate @ 1200 max crs to bracing

SB- Speed Brace" TECO SPEEDBARCE
walls or a 30 x 0.8 G.I. strap to each end of bracing

or angle brace fixed to manuf Specs

 

 

 

 

 

 

 

 

 

 

 

 

all panel tying studs to plate with 4/2.8 f nails each end, =1.5Kn/M
refer to bracing plan for full a 4 "
details and locations of bracing walls. cs SSS GR bractog wal teed nent ners
BRACING LEGEND : 190 mm Block wall =170,80Kn/M on one side or two of stud frame
PB- Structural Ply Bracing within Cavity or face of Studs betwee anchor rods to manufacurers

=6.4Kn/m specifications =2.00kN/m single side

and 4.50kN/m both sides

 

Se ee (7) BRACING LEVEL TWO
and Specifications 1: 100

Do not scale from drawings due to variation in paper, depending on weather and moisture content. Use written dimensions only.

 

 

 

 

 

 

 

 

 

 

 

 

 

Besoin
Michael Petrascu Designs — Lot 1 Orealla Cres BRACING LEVEL 2
i {_
Tel/Fax 07 54472996 Email: [email protected] Sunrise Beach Qid Project number SRB-AUH-2006-01
Date March 2006
P.O.Box 651 Noosa Heads Qld 4567 BSA 703843 | Proposed Residences Drawn by thor

 

 

Checked by Checker

 

 

 

Used in these records

About this file

File size
5.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0387 - Op Works - Landscaping, Carparking & Access, Frontage [As Published].pdf · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.