Council archive · source document
07/0387 - Op Works - Landscaping, Carparking & Access, Frontage [As Published] · 142007.387
DRAWING SIZE - A2
Gt—staty = . ? UO slab . Uy. WS Matt 14/06/2008 11:31 AM 16198-S1~S2.deg,
Besser © block’ or mesh 0s Vopour Barrier, Besser 'C block’ or , Vapour Barrier,
equivalent. specified equivalent. | &
=~
Finished ground Finished ground 3 2000{L) Trench
sloping onoy at ; sloping away at / $ | 220 Concrete Stab mesh trimmers 2
1:20 min for Levelling layer. 1:20 min for Levelling layer. 2 b nS
1500mm_ mininus 1500mm minimu & |
q
N12 [email protected] Starter Bars @ 1000mm
3 z centres,400mm Cogged Ends.
SLIM Top & bottom 3 4LI1TM Top & Bottom Wall bors cogged
R6 Ligs ot 900. R6 figs 900 c/c 400 into slab.
Waterproof wall.
|
; 4506 Concrete piers,
350¢ Concrete piers, location ond depth as
location and depth os CEES) | noted on pion,
noted on plan. 500
~ (SF-01 TER
220 Concrete Stob
190 Block N20
grout fill
a
Woll bors cogged
400 into slab.
A Bars.
N12 © 400 ctrs
both directions
fins via cleanout
Slab mesh as per
blocks, prior to pour.
foating plon.
ee
N12 [email protected] ea and
pee)
190 Block N20
grout fil
SLIITM Top & bottom
R6 Ligs ot 900.
All cores cleaned of
debris and mortar
fins via cleanout
blocks, prior to pour.
200mm free draining
bockiill with agi pipe to
Ls» | outiet.
! ON ~ (IF=0 F NI2 @ 400 ctrs
220 Concrete Slab both directions
Slab mesh os per
tOmm Wet tooled 100 Thick t
control iat. \ Terrace slab. Wall bars cogged 200mm free draining
400 into slab. bockfill with agi pipe to
outlet.
N12 @ 400 ctrs oe C norte pers,
irecti iocation; and de; as
Slob mesh lowered to bottom 90 Block M2 both directions noted oh plan P
{40 cover). Cut every second 190 Bloc! ' a Natural Ground Pian.
wire along line of joint, grou N12 © 400
Horizontal.
TOOLED JOINT DETAIL Longitudinal nw
x= Waterproof wall ‘oncement n2 @
A Bars.
300 typ. 500 typ. 190 Hollow block -
grout fitted core
a mesh as per Ni2 @ 400 N20 compacted concrete bars os NI6 @ 400 centro.
cating plon. Longitudinal noted. z
. 2
= £
8 3
” 200mm free draining 3
backfill with ogi pipe to x
4/N12 corner bars outlet, E
(2 Top 2 Bottom 290 Hollow block ~ grout filled core 3
500 long legs. N20 compacied concrete bars as ~
noted , 1200 {h).
200mm free draining NIS @ 200 with 55
bockfill with ogi Pipe 0 cover to back face. THIS DRAWING AND ASSOCIATED DETAILS
~ | Ail cores cleaned of Slab mesh os per footing Longitudinal NOTES cee ON tee THE
Lop 3 - N12 bors < : debris and oro plon on bar chairs @ reinforcement N12 :
500mm with beam € Vapour borrier ~ fing via cleanout 800mm centres, @ 400
trench mesh. 3 continuous under slab blocks, prior to pour.
m
SSS" CONSTRUCTION
G CONSULTING ENGINEERS
ABN 40 098 481 899 ° civil ° geotechnical
18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634
Title: Footing and Slab Details.
Project Lot 161 Orealla Cres
Sunrise Beach
TYPICAL SECTION ~ WF ~ (RW
"1 Date: May 2006 Drg No. 16115-S2 P| —
N12 Starter Bars @ 400mm centres
cogged 200mm top & bottom.
SUT
———
3500 Concrete piers,
location and depth os
noted on plan.
1500
Stab
beam depth.
300
Trench mesh 3L1tTu {Class 'S’ or ‘M’ Site} or
Trench Mesh 3L12TM (Class 'H' Site).
500
Grode slab beom layer
base to perimeter 300
footing base.
. Strip footing hatched,
ion ~ nection to Footi A continued through WF.
$ per plan,
Rey, - 3001.05
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0387 - Op Works - Landscaping, Carparking & Access, Frontage [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.