07/0387 - Op Works - Landscaping, Carparking & Access, Frontage [As Published] · 142007.387
DRAWING SIZE - A2
BUILDER 10 MAINTAIN STABILITY
OF ALL NEIGHBOURING STRUCTURES,
REFER CRITICAL DEPTH LINE AND
16115-OW1 FOR LOCATION AND GUIDANCE.
ALLOW FOR ANCHORED SHEET PILING BY
SPECIALIST CONTRACTOR. MINIMUM
WBRATION TECHNQUES TO BE
USED. PRE-AUGERING OR BETTER.
LEGEND
~ (Sty
%
$3
SF-01
F-02
IF-O1
IF-02
RW-O1
RW-02
RW-04
RW-05
GW
Ww
=
e
‘3S ¢
nm —-—
Oz
7
Denotes stepdown, refer Architectural plans
for step Hi.
One piece of SL11TM fixed to underside of
slob mesh @ 45 deg. to corner, Length os
indicated.
300(m) x 400(d) internat slab beams refer
drawing S2 for detoils
350(W)x450(D) Perimeter Footing refer
drawing S2 for details
500{W)x450(D) Strip Footing refer drawing
S82 for detais
350KW)x450(D} internal Footing refer drawing
S2 for details
500(W}x450(D) Internal Footing refer drawing
$2 for details
Type 1 Retoining wall, refer S2 for detois
Type 2 Retoining woll, refer S2 for details
Type 4 Retaining wall, refer S2 for details
Type 5 Retaining wall, refer S2 for details
Garden Wall Footing refer drawing for details
Widen footing to dimensions shown
provide 2xSLB2 mesh sheets bottom,
extend footing cage through.
Denotes wet tooled joint to terrace slob, refer
to details on drawing S2.
125 Thk. Driveway slob on compacted
material, SL82 mesh, top 40 cover,
Flexible joint ogainst mosonry/concrete.
450 dia. concrete footing piers, 2.0m ctrs
mox. 1800(D} or founded 300 into NATURAL
MEDIUM DENSE SILTY SANDS, omit where
footings founded 300 into NATURAL MEDIUM
DENSE SILTY SANDS.
350 dia. concrete footing piers, 2.0m ctrs
max. founded 300 into NATURAL MEDIUM
DENSE SILTY SANDS, omit where footings
founded 300 into NATURAL MEDIUM DENSE
SALTY SANDS.
PRIOR 10 CONSTRUCTION ENGINEERS
IS TO REMEW CONTOUR SERVEY
(TO BE PROVIDED) ON BOTH
ALOTMENTS IN TO CONFIRM THE
DETAILS CONTAINED HERE IN.
PIER REINFORCEMENT
0 - 1200 None required
4200 - 2400 42 - N12, R6 Ligs 600cts
2400 ~ 4500 44 - N12, R6 Ligs 600ctq
— Pier senlorcement to de Si Hi and be cogged aad Ingped 400
‘with fooling top reiniorcenent,
~ Minimwn Rentorremant Cover; SOrem
PRIOR 70 FILUNG, REMOVE ALL TOPSOIL, LOOSE
OR DISTRURBED MATERIAL. FILL TO CONSIST OF
CLEAN SAND WETTED AND COMPACTED IN 150mm
LAYERS 10 ACHIEVE 95% Min. FIELD DENSITY.
COMPACTION RESULTS 70 BE PRESENTED 10 THE
ENGINEER FOR APPROVAL PRIOR TO SLAB
PREPERATIONS.
REFER 16115-OW! FOR
EXTERNAL GARDEN WALLS
AND RETAINING WALLS.
Matt 34/06/2006 11:31 AMM 16115-S1-S2. dng
2/N12 Horiz. Bor
ta Bond Beam.
Top of Wall
CULLMALLL Me
T__
> N12 Verticol Bars.
refer spacing toble.
POOL BY
OTHERS
Provide N12 N20 compacted grout
Horizontal bars at filing to all cores
1000 ctrs.
GARDEN WALL REINFORCEMENT
10mm Joint, mastic Besser control
fill if wot rendered. pint blocks.
Block garden wall to
be built off pool shell.
refer engineers drq’s
for detaits,
3
OER. Existing timber
retaining wail
Omit footing piers where
footing is founded 300mm into
Natural Medium Dense Sand.
The builder /contractor
sho confirm oil relevant
This footing is depth line ond levels prior to
founded below is unstable
commencing works.
critical Jine ond is | .
stoble. Line of
propased Pool
Excavation or
Piers supporting strip other trench.
footings or post pad
footings founded into
selected material ond below
critical line are considered
stable.
Horizontal
NOTE:
PTH Li THIS DETAIL ALSO APPLIES To
EXISTING FOUNDATIONS ON
NEIGHBOURING PROPERTIES. SHEET
PILING MUST BE INSTALLED WHERE
EXISTING FOOTINGS WILL BE
FOUNDED ABOVE ANY EXCAVATION
CRITICAL DEPTH LINE
ALL FOOTINGS ARE 10 BE FOUNDED 300mm INTO
NATURAL MEDIUM DENSE SILTY SANDS OR
SUPPORTED ON 3506 PIERS AT 2.0m cirs
FOUNDED 300mm INTO NATURAL MEDIUM DENSE
SILTY SANDS.
N12 Vertical bars, in
grout filled core both
sides af joint.
(PROMDE AT 6.0m CTRS MAX.)
Cost-in starter bar
refer bor spacing
table.
150
Trench mesh SLIITM top
& bottom of equivalent.
R6 tigatures @ 900mm centres.
THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH THE
NOTES CONTAINED ON 16115-N.
Issue:
CONSTRUCTION
SGGstmchral= cei = peteccal @)
48 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634
Title: Footing and Slab Plan.
Project Lot 161 Oreatla Cres
Sunrise Beach
Date: May 2006 DrgNo. 16115-S1
Rav, - $0.01,05
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0387 - Op Works - Landscaping, Carparking & Access, Frontage [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.