07/0387 - Op Works - Landscaping, Carparking & Access, Frontage [As Published] · 142007.387
[Revision :
DRAWING SIZE — A2 0806
a Ca
Mott 14/06/2008 11:31 AM 18115—S1-S2. deg
FLOOR FRAMING SCHEDULE
PMARK | SWZE/GRADE
Hyne Hi 30070 uoist © 450 ctrs
170x45 (LVL) Joist @ 450 ctrs
150x50 (F14) Joist @ 450 ctrs
Hyne HI 30070 doists @ 400 ctrs
200x75 {F14) Floor bearer
300x45 (LVL) Floor bearer
250 x 75 (F14} Floor Bearer
175x75 {F14) Floor bearer
230 x 85 Hyne 17 Floor Beorer
2/300x45 (LVL) Floor bearer
doist size wall plate
Double uoist, Nai laminate
— Hyspon LVL and Hybeom by Corter Holt Harvey
— Al exposed timber to be H3 treated.
ROOF FRAMING SCHEDULE
J MARK | _SWE/GRADE
PROWDE DOUBLE JOISTS UNDER ALL LOAD
BEARING AND BRACING WALLS RUNNING
PARALLEL TO JOISTS.
“ido (F14) Rafters @ 900 ctrs
1/M16 x 150 (L)
chemset into top of
block work from FBS TR
Sesrea ere: fd tard ax
or * ———y
rs
peewee eee eee
+r
TOVT IGT:
LAL LAL E:
z
peer
bane
(Puts 15x50 (F14) Roof Beom
| 175x50 (F14) Roof Beam
1— il a 2/150x38 (F14) Hip Rafters
1/M16 x 150 (L) a | Trusses @ 600 ctrs
chemset into top of | | = All exposed timber to be H3 treated
i]
block work from FB&
Ju
rf
Rrorezpre724
j
| 47 FBG (Pu) FRB
I te 7 tS tw =
ROOF BEAMS TO BE FULLY ay) pat we (ye er 2a WP é
Eto Mer Poor PROOFED ce Cae
Li iT gl ® ex (4) w
NS
e vo 2
Ee
-@ . 2) FBE (Pu) FBG LOTT 2a274
—
1
=
w)
= } a 8
CE 1/ut6 x 150 (L) & cay)
i Dd "$j chemset into top of |
Hatched area indicates kt
inf joisis, pack out
to sult. i block work from FRE s I 5
1/416 x 150 (L) t i i
chemset into top Bi 3 $ f
of block Pier. i 4 pu)
= '
7 it ale Wf POL
it Pu) RBI < (Pu 5 i
biezreer ~ Zz a TTR A ed
<< 5 4 DUM
(PU ae v) TR
—RB
nn
r
SILESVI NAT NT
BNSAANALAS SANS BAD:
125x50 (F14}
Rofters @ 900 cirs
THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH THE
NOTES CONTAINED ON 16115-N.
75x75x8 Angles
2/M10 each leg,
issue:
CONSTRUCTION
+. CONSULTING ENGINEERS
SCG structural - civil - geotechnical S
ABN 40 096 481 898
18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634
Title: Second Floor Framing Plan.
Project Lot 161 Orealla Cres
Sunrise Beach
LEGEND
‘Ay 125x75x10 Angle cleats for timber beam
L’" connections, 2/M16 each leg, 80mm Min. end
clearance on all timber holes.
(PU) Indicotes support post under refer lower bracing
plan for size,
(LU) Indicates Lintel under refer tower bracing pion
for type/size.
(c) !Omm M.S. side cleat to steel beam for beam
| connections, 2/M16 for timber members 80mm
Min. end cleorance on all timber holes or 3/M16
for steel members.
So
2
&
: May 2006 DrgNo. 16115-S7 _
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0387 - Op Works - Landscaping, Carparking & Access, Frontage [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.