2015-11-26_Response to Further Information- Council
Attached to the e-mail MCU15/0095 - Response to Information Request..
TfA Project Group Pty Ltd Noosaville
Further Information Requested Development Response
road network, would be within the range of typical
fluctuations in traffic volumes.
The expected sales and trade expectations for the
site would have one with possibly two deliveries
occurring in a 7 Day period. It is the policy to
undertake these deliveries outside of peak periods
to minimise any impact on traffic within the site.
A 3 dispenser site with 6 filling positions has the
capacity to process 83 vehicles per hour without
the need for a single car to queue. Traffic
generation rates anticipated for this development
are projected to be significantly lower than the
capacity of the site to process vehicles for the
foreseeable future.
One or two tanker refuelling deliveries every 7 days
would have no impact on queuing.
c) Assessment of the need for a no-queuing area to c) It is considered that queuing in the easement area
avoid obstructions to traffic flows within the will be unlikely as a result of the proposed service
access easement area and to allow for the future station development given the ample queuing
development of the balance lot. space on site, as per Drawing No 15193- D13.
However, as mentioned in 7a above, any future
development application over the balance lot will
also presumably be required to demonstrate no
queuing into the easement area.
Issue – Stormwater
Clear compliance with Specific Outcomes O1, O3, O6, and O9 of the Water Sensitive Design Code has not been
demonstrated. It is also unclear whether there are appropriate level differences for the proposed detention tank and
grass lined swale to function, given existing site levels.
TfA Project Group Civil Engineer Response to Specific Outcomes O1, O3, O6 and O9 below:
O1
Prior to the discharge of run-off to the legal point on Eumundi Noosa Road, stormwater will be captured and treated
through a combination of gully pits fitted with Spel Stormsacks (gross pollutant traps), underground pipes and a
detention system.
O3
The proposed development does not consider the reuse of stormwater.
O6
The Spel units proposed (Spel Stormsacks and Spel Puraceptor) captures gross pollutants and hydrocarbons at water
quality standards of Brisbane City Council. The total area of the site being developed is less than 2,500 m2 therefore
the development is not required to achieve the TN, TP and TSS pollutant reductions outlined in the Queensland State
Planning Policy (SPP) July 2014.
O9
The proposed development includes gully pits fitted with Spel Stormsacks (Gross pollutant traps) that captures 99.99%
of gross pollutants (sediment, litter, oil and grease) up to the bypass flowrate.
Information Required TfA Project Group Civil Engineer Response below:
8. Provide a preliminary stormwater drainage design The proposed development does not incorporate the
demonstrating the proposed open swale drain and use of swales, however the proposed detention tank
detention tank will be able to function at the proposed comprises an underground unit designed to suit the
location in respect of invert levels at the legal point of invert levels of the legal point of discharge.
Page 4 of 5 26/11/2015
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.