Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2022_11_17_Ordinary_Meeting_Minutes

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

ORDINARY MEETING MINUTES                                                  17 NOVEMBER 2022


         Plan No.    Rev.   Plan/Document Name                                      Date
                            Specialist
         34680-07    0      Elevations, prepared by The Jetty Specialist            14/09/2021
         34680-08    0      Pile Setout, prepared by The Jetty Specialist           14/09/2021
         34680-      0      Pontoon P1B, Construction Details, prepared by The      2/11/2021
         P1B-1              Jetty Specialist
         34680-      0      Pontoon P1B, Foam Details, prepared by The Jetty        2/11/2021
         P1B-2              Specialist
         34680-      0      Pontoon P2A & P1A, Construction Details, prepared by    2/11/2021
         P2A-1              The Jetty Specialist
         34680-      0      Pontoon P2A – 2 Foam Details, prepared by The Jetty     2/11/2021
         P2A-2              Specialist
         34680-      0      Pontoon P2B Construction Details, prepared by The       2/11/2021
         P2B-1              Jetty Specialist
         34680-      0      Pontoon P2B – 2 Foam Details, prepared by The Jetty     2/11/2021
         P2B-2              Specialist
         34680-      0      Pontoon P3A-1 Construction Details, prepared by The     2/11/2021
         P3A-1              Jetty Specialist
         34680-      0      Pontoon P3A Foam Details, prepared by The Jetty         2/11/2021
         P3A-2              Specialist
         34680-      0      Pontoon P3B-1 Construction Details, prepared by The     2/11/2021
         P3B-1              Jetty Specialist
         34680-      0      Pontoon P3B Foam Details, prepared by The Jetty         2/11/2021
         P3B-2              Specialist
         34680-      0      Pontoon P3C Construction Details, prepared by The       2/11/2021
         P3C-1              Jetty Specialist
         34680-      0      Pontoon P3C Foam Details, prepared by The Jetty         2/11/2021
         P3C-2              Specialist
         34680-      0      Pontoon P3D Construction Details, prepared by The       2/11/2021
         P3D-1              Jetty Specialist
         34680-      0      Pontoon P3D Foam Details, prepared by The Jetty         2/11/2021
         P3D-2              Specialist
         34680-      0      Pontoon P3E Construction Details, prepared by The       2/11/2021
         P3E-1              Jetty Specialist
         34680-      0      Pontoon P3A Foam Details, prepared by The Jetty         2/11/2021
         P3D-2              Specialist
         34680-B1-   0      Pile Bracket B1 General Arrangement, prepared by        2/11/2021
         1                  The Jetty Specialist
         34680-B1-   0      Pile Bracket B1 Corner Bracket, prepared by The Jetty   2/11/2021
         2                  Specialist
         34680-B1-   0      Pile Bracket B1 Corner Bracket 2, prepared by The       2/11/2021
         3                  Jetty Specialist
         34680-B1-   0      Pile Bracket B1 6mm Chequer Plate, prepared by The      2/11/2021
         4                  Jetty Specialist
         34680-B2-   0      Inboard Pile Bracket B2 General Arrangement,            2/11/2021
         1                  prepared by The Jetty Specialist
         34680-B2-   0      Inboard Pile Bracket B2 Exposed Bracket, prepared by    2/11/2021
         2                  The Jetty Specialist
         34680-B2-   0      Inboard Pile Bracket B2 UA Bracket, prepared by The     2/11/2021
         3                  Jetty Specialist
         34680-SJ-   0      Starter Jetty Platform 2, prepared by The Jetty         2/11/2021
         3                  Specialist
         34680-SJ-   0      Starter Jetty Headstock, prepared by The Jetty          2/11/2021
         1                  Specialist
         34680-SJ-   0      Starter Jetty Platform 1, prepared by The Jetty         2/11/2021
         2                  Specialist
         34680-      0      4m Gangway 1 Construction Detail, prepared by The       2/11/2021
         GW-1               Jetty Specialist



                                                                                Page 14 of 24
Log in to download the original file

2022_11_17_Ordinary_Meeting_Minutes.pdf · 635 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.